CDP Ratlam E PDF
CDP Ratlam E PDF
CDP Ratlam E PDF
Ratlam
DARASHAW&CO.PVT.LTD
6thFloor,ExpressBuilding,
Churchgate(W),Mumbai
Executive Summary
There are 360 numbers of urban local bodies in the state of Madhya Pradesh;
amongst them 14 ULBs are the municipal corporations. These municipal corporations
have been enacted under the Madhya Pradesh Municipal Corporation Act, 1956 with
meticulous roles and responsibilities in order to provide the services to the citizens
under its jurisdiction.
Due to rapid urbanization and the population growth new the past few decades urban
local bodys especially municipal corporations are facing the enormous pressure on
the technical and financial capacity there by affecting the level of service to its citizen.
In order to address these issues and to meet the growing demands of infrastructure
and service delivery, GoI as well as GoMP have initiated a number of programmes.
GoMP has initiated schemes like DFID funded MPUSP (Madhya Pradesh Urban
Services for Poor Programme), which links reform with investment in infrastructure
for the poor. City Development Plan is the part of above strategy in order to access
funds under GOI schemes as well as from other sources based on priority actions and
projects identified under CDP.
The whole exercise is divided into four stages, which are further subdivided into tasks
and several sub-tasks or activities within them.
Inception stage: this includes the field reconnaissance and identification of key
stakeholders for the Project. Discussions were held with key stakeholders and a Kick
off workshop was organized involving all the stakeholders. The outcome of the
meeting and preliminary assessment for the municipal area has been detailed out in
the Inception report.
Database Identification and Anthology: A detailed checklist was prepared for all
the sectors and the data was collected from different departments and parastatal
bodies. Apart from data collection, rapid assessment has been done with conducting
the entire city survey including the slum areas.
Sectoral analysis: This stage has been incorporated with sectoral situation
assessment and SWOT analysis after micro level evaluation of the sectors. The
sectoral analysis has included social and physical infrastructure, environment, urban
governance, municipal finance.
Consultancy Division
Darashaw & Company Pvt Ltd. Page |1
City Development Plan, Ratlam
Connectivity
Ratlam city has significant rail and road connectivity via extensive rail and road
network respectively. Ratlam junction is Divisional head quarters of Western
Railways. It has both Broad Gauge and Meter Gauge Railway Lines providing
connectivity at regional and national level.
Demography
Consultancy Division
Page |2 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Socio-economic profile
Literacy rate: Ratlam city literacy Literacy levels Total Male Female
rate has been significant as Ratlam 85% 91% 78%
compared to other cities of the In Ratlam urban
states. As per census 2001, the district 81% 89% 73%
In MP state
literacy rate for the Ratlam
urban 79% 87% 70%
Municipal Corporation is higher as
compared to the Ratlam district urban and state level literacy rate. It shows the
role of education system has been significant in the city area.
Social composition:
Social % share
As per census 2001, SC Composition
Male Female Total
to total
population is about 10 percent SC
of the total population whereas 12231 11534 23765 10%
Population
ST population comes around 4 ST Population 5113 4598 9711 4%
percent of the total population. Others 103530 97413 200943 86%
Total
120874 113545 234419 100%
Population
Consultancy Division
Darashaw & Company Pvt Ltd. Page |3
City Development Plan, Ratlam
main Agriculture Market which distributes the large amount of food grains coming
from the surrounding villages and districts.
Being the district administrative centre and Railway junction, Ratlam has significant
scale of informal sector in the several part of the city.
There is a major industrial area in the Ratlam city premises which is under the District
Trade and Industries Centre (DTIC), Ratlam. But since last decade several industries
like Jayant Vitamins, Sajjan Chemicals and steel and alloys industries are shutting
down causing damage to the economy of the area. Major reason according to the
industrial officials is the lack of infrastructure services.
Physical infrastructure
Water supply:
Existing situation:
Water has been supplied from Performance
Units Value Standard
Dholwad dam through Morvani Water Indicator
Coverage of
treatment plan with capacity of 22.7
domestic supply % 54 100
MLD. In order to compensate entire connections
city demand, Ratlam Municipal Per capita supply of
Corporation has provided tubewell and lpcd 65 135
water
handpumps at several parts of the Continuity of water 45
Hours 24
city. Water has been stored in the supply min
sumps and overhead tanks and Extent of metering of
% 0 100
water connections
supplied for 45 minutes to the several
Storage capacity with
part of the city on the alternated day respect to proposed
basis. % 52.27 33
supply for the next
fifteen year period
There is no metering system for
Cost of electricity to
connections except for the industrial operational % 54 25
connections. expenditure
In order to address water scarcity Cost recovery (O&M)
in water supply % 53 100
problem in Ratlam, Water supply
services
scheme under UIDSSMT has been
proposed and the project cost is Rs.32.65 crore for the augmentation of drinking
water source from Dholawad Dam.
Consultancy Division
Page |4 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Apart from the technical features, action plan has been proposed for utility mapping
and customer grievance and redressal system for better accountability of the water
supply service.
Existing situation:
Town does not have comprehensive underground sewerage scheme as on today. The
current disposal system is in the form of septic tanks of the individual houses or
direct disposal into nallah or open plots. Town has insignificant amount level of
sanitation facilities with absence of public toilets and disposal systems.
Consultancy Division
Darashaw & Company Pvt Ltd. Page |5
City Development Plan, Ratlam
Rs.21 Cr for nallah improvement and channelization with additional provision of storm
water drainage network.
1Motorable road, as defined by Municipal Official, is the road which is the kind of WBM road lower in quality
but better than the kuchha road.
Consultancy Division
Page |6 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
City Vision
To establish Ratlam City as the greatest enabler of socioeconomic development in
the State of Madhya Pradesh.
Consultancy Division
Darashaw & Company Pvt Ltd. Page |7
City Development Plan, Ratlam
Scenarios Details
No reforms scenario or Base case Implementation of all the projects with no reforms
Implementation of all the projects with partial
Partial Reforms Scenario implementation of Reforms
Implementation of all the projects with complete
Full Reforms Scenario
implementation of Reforms
Consultancy Division
Page |8 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Funding pattern:
Following funding pattern has been assumed Funding Option Contribution as
for capital investment required for Ratlam % of project cost
City Development: Central Government 80%
State Government 10%
Ratlam Corporation 10%
Optimal financial operating plan:
The Municipal Corporation will be able to fund 10% of the project cost and also meet
its O&M obligation under Full Reforms scenario. Since public contribution is
envisaged in funding water supply and sewer scheme, PPP model can be considered
for implementation and O&M.
Consultancy Division
Darashaw & Company Pvt Ltd. Page |9
City Development Plan, Ratlam
Financial
Operating Plan 2011- 2012- 2013- 2014- 2015- 2022- 2023- 2024-
under full 2012 2013 2014 2015 2016 2023 2024 2025
reform scenario
Project Cost 22602.20 14761.60 12069.79 10010.00 2656.19 1337.75 908.94 872.75
Projects under
0.00 4977.63 770.00 36.19 0.00 42.76 0.00 36.19
PPP
Ultimate project
22602.20 9783.97 11299.79 9973.81 2656.19 1294.99 908.94 836.56
cost
Contingency 678.07 293.52 338.99 299.21 79.69 38.85 27.27 25.10
Cost escalation 1130.11 1002.86 1781.13 2149.42 733.86 1030.63 805.00 819.77
Sub-total 24410.37 11080.35 13419.91 12422.44 3469.73 2364.47 1741.21 1681.43
Funding
Central
Government
19528.30 8864.28 10735.93 9937.95 2775.79 1891.57 1392.97 1345.14
contribution @
80%
State
Government
2441.04 1108.03 1341.99 1242.24 346.97 236.45 174.12 168.14
contribution
@10%
Municipality
contribution
including public
deposits for 2441.04 1108.03 1341.99 1242.24 346.97 236.45 174.12 168.14
Water Supply
and Sewer
scheme @10%
Financial
Operating Plan
under full
reform scenario
Surplus of
2244.61 1721.71 2166.27 3063.59 2769.97 5109.79 5438.69 6451.99
Municipality
Loan to fund new
780.00 950.00 400.00 400.00
project
Interest on loan 78.00 173.00 213.00 253.00 53.00 0.00 0.00
Repayment of
0.00 0.00 0.00 0.00 800.00 530.00
loan
Closing Balance
of Short term 780.00 1730.00 2130.00 2530.00 530.00 0.00 0.00
Loan
Less contribution
of Ratlam
2441.04 1108.03 1341.99 1242.24 346.97 236.45 174.12 168.14
Municipality
towards projects
Less O&M due
0.00 944.87 1499.25 2014.31 2552.22 4068.57 4315.87 4564.48
to new projects
Opening Balance 328.28 131.86 502.67 604.70 598.73 584.12 535.89 954.59
Net Surplus/
-196.42 370.81 102.03 -5.97 17.77 -48.23 418.69 1719.36
Deficit
Closing
131.86 502.67 604.70 598.73 616.51 535.89 954.59 2673.95
Balance
Consultancy Division
P a g e | 10 Darashaw & Company Pvt
Ltd.
City Development Plan, Ratlam
Table of Contents
Executive Summary
1 Project Background.................................................................................................. 1
1.1 City Development Plan ......................................................................................................................1
1.2 Approach and Methodology...............................................................................................................2
1.2.1 Inception stage .............................................................................................................................................3
1.2.2 Database Identification and Anthology ..........................................................................................................4
1.2.3 Sectoral Analysis ...........................................................................................................................................4
1.2.4 Vision and development objectives ...............................................................................................................5
2 City Profile.................................................................................................................9
2.1 Connectivity.....................................................................................................................................10
2.1.1 Road Connectivity .......................................................................................................................................11
2.1.2 Rail Connectivity..........................................................................................................................................11
2.1.3 Air Connectivity............................................................................................................................................11
2.2 Demography....................................................................................................................................13
2.2.1 Population for Ratlam Municipal Corporation and Railway colony:.............................................................13
2.2.2 Population Projection...................................................................................................................................14
2.3 Social Indices ..................................................................................................................................17
2.3.1 Literacy rate.................................................................................................................................................17
2.3.2 Social Composition......................................................................................................................................17
2.3.3 Gender Ratio ...............................................................................................................................................17
5 Physical Infrastructure........................................................................................... 30
5.1 Water Supply ...................................................................................................................................30
5.1.1 Water Supply System .................................................................................................................................30
5.1.2 Water Supply Sources ................................................................................................................................30
5.1.3 Water Supply treatment ...........................................................................................................................30
Consultancy Division
Darashaw & Company Pvt Ltd. Page |i
City Development Plan, Ratlam
8 Housing ................................................................................................................... 60
8.1 Household size and occupancy rate ................................................................................................60
8.2 Future requirements.........................................................................................................................60
Consultancy Division
P a g e | ii Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
9 Environment Status................................................................................................ 63
9.1 Natural environment ........................................................................................................................63
9.1.1 Topography ................................................................................................................................................63
9.1.2 Geology and soil type .................................................................................................................................63
9.1.3 Climate and rainfall.....................................................................................................................................63
9.1.4 Ground and surface water sources ............................................................................................................64
9.2 Urban Environment..........................................................................................................................64
9.2.1 Air pollution..................................................................................................................................................64
9.2.2 Water pollution............................................................................................................................................64
9.2.3 Soil pollution ...............................................................................................................................................65
9.2.4 Land use.....................................................................................................................................................65
9.2.5 Anthropogenic hazards...............................................................................................................................66
9.2.6 Urban Environment Quality ........................................................................................................................66
9.2.7 Sectoral Issues ...........................................................................................................................................67
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | iii
City Development Plan, Ratlam
13 Identification of issues........................................................................................... 99
13.1 SWOT analysis............................................................................................................................99
13.2 Sector-wise issues.....................................................................................................................100
13.3 Issues identified by stakeholders...............................................................................................102
Consultancy Division
P a g e | iv Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Consultancy Division
Darashaw & Company Pvt Ltd. Page |v
City Development Plan, Ratlam
List of Tables
Consultancy Division
P a g e | vi Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | vii
City Development Plan, Ratlam
Table 17-12: Investment required for urban governance, institutional development............................. 154
Table 17-13: Prioritized City Investment for Ratlam .............................................................................. 155
Table 17-14: Prioritized projects under PPP.......................................................................................... 156
Table 18-1: Suggested Property taxes Reforms................................................................................... 159
Table 18-2: Suggested Accounting Reforms ........................................................................................ 160
Table 18-3: Areas of Privatization......................................................................................................... 162
Table 18-4: Reforms and action plans ................................................................................................... 164
Table 19-1: Growth rate for revenue income ......................................................................................... 167
Table 19-2: Financial statements under no reforms scenario ................................................................ 169
Table 19-3: Growth rate for revenue expenditure .................................................................................. 171
Table 19-4: Capital Investment for first phase of Ratlam CDP .............................................................. 172
Table 19-5: O&M required for Capital ivestment.................................................................................... 173
Table 19-6: Sustainability of the projects without reforms ..................................................................... 174
Table 19-7: Scenarios for Financial Operating Plan ............................................................................. 174
Table 19-8: Key reforms for Ratlam CDP .............................................................................................. 175
Table 19-9: Key assumptions for forecasting income from property tax ................................................ 176
Table 19-10: Key assumptions for forecasting income from water tax .................................................. 176
Table 19-11: Key assumptions for forecasting income from sewer tax.................................................. 177
Table 19-12: Projected Financial Statement for Partial Reforms Scenario (Rs. In Lakhs)..................... 179
Table 19-13: sustainability under partial reforms scenario .................................................................... 181
Table 19-14: Projected Financial Statement for Full Reforms Scenario (Rs. In Lakhs) ......................... 182
Table 19-15: sustainability under full reforms scenario.......................................................................... 184
Table 19-16: Funding options Ratlam City Development Plan .............................................................. 184
Table 19-17: Financial Operating Plan for Full Reforms Scenario (Rs. In Lakhs)................................. 185
Table 19-18: Operational Efficiencies after appointment of Private Sector............................................ 188
Table 19-19: PPP Projects implemented under JNNURM..................................................................... 189
List of Figures
Figure 2-1: Ward wise Map of Ratlam Municipal Corporation.................................................................. 13
Figure 2-2: Decadal population growth rate of Ratlam (in %) .................................................................. 14
Figure 3-1: Existing Landuse pattern....................................................................................................... 19
Figure 3-2: Ratlam Land Use Plan .......................................................................................................... 20
Figure 3-3: Proposed Land use ............................................................................................................... 21
Figure 4-1: Estimated population under informal sector .......................................................................... 25
Figure 4-2: Informal sector in Ratlam ...................................................................................................... 26
Figure 4-3: Tourism Places in Ratlam ..................................................................................................... 28
Figure 5-1: Public Transport facilities in Ratlam ...................................................................................... 46
Figure 5-2: Congestion at Roads in Ratlam............................................................................................. 47
Figure 6-1: Recreational Spaces ............................................................................................................. 54
Figure 7-1: Services to urban poor .......................................................................................................... 58
Figure 8-1: Chronological Development of Ratlam .................................................................................. 62
Figure 10-1: Heritage Building in Ratlam ................................................................................................ 69
Figure 11-1: Revenue and expenditure of Ratlam Municipal corporation ................................................ 74
Figure 11-2: Revenue of Ratlam Municipal corporation........................................................................... 74
Figure 11-3: Municipal Taxes .................................................................................................................. 75
Figure 11-4 : Arrear and Current Property Tax Collection ....................................................................... 76
Figure 11-5 : Arrear and Current City development Charges Collection.................................................. 77
Figure 11-6 : Arrear and Current Consolidated Tax Collection ................................................................ 78
Figure 11-7 : Arrear and Current for Education cess ............................................................................... 78
Figure 11-8 : Arrear and Current Water Tax Collection ........................................................................... 79
Consultancy Division
P a g e | viii Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Annexure:
Annexure 1: Kickoff workshop Paper Clippings and steering committee photographs
Annexure 2: Proceedings of second Workshop
Annexure 2: Proceedings of second Workshop
Annexure 3: Photographs of second Workshop
Annexure 4: Newspaper articles for second workshop
Annexure 5: Sample survey form - Filled
Annexure 6: Attendance sheet of people who attended Kick off workshop
Annexure 7: Copy of the presentation done to stakeholders
Annexure 8: Steering Group Meeting attendance
Annexure 9: Steering Group Meeting Photographs
Annexure 10: Third Workshop Stakeholders
Annexure 11: Third Workshop-Presentation
Annexure 12: Third Workshop-Stakeholders proposals
Annexure 13: Attendance for Third Workshop
Annexure 14: fourth steering committee meeting
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | ix
City Development Plan, Ratlam
Abbreviations:
ASHRAE American Society of Heating, Refrigerating and Air-conditioning Engineers
BEE Bureau of Energy Efficiency
BOLT Built Operate Lease Transfer
BOOT Build Own Operate Transfer
BOT Built Operate Transfer
BPL Below Poverty Line
BT Bitumen
CAGR Compound Annual Growth Rate
CC Cement Concrete
CDP City Development Plan
CIP City Investment Plan
CER Certified Emission Reduction
CPHEEO Central Public Health and Environmental Engineering Organisation
DBFOT Design, Build, Finance, Operation and Transfer
DFID Department for International Development
DISCOM Division Support Command
DPR Detailed Project Report
DU Dwelling Unit
EE Energy Efficient
ESCO Energy Service Company
ESR Elevated Storage Reservoir
EWS Economically Weaker Section
FOP Financial Operating Plan
GIS Geographic Information System
GoMP Government of Madhya Pradesh
GSR Ground Storage Reservoir
HH Households
HVAC Heating, Ventilation, and Air Conditioning
IHSDP Integrated Housing and Slum Development Programme
INR Indian Rupees
IREDA Indian Renewable Energy Development Agency
JnNURM Jawaharlal Nehru National Urban Renewal Mission
RMC Ratlam Municipal Corporation
Kms Kilometres
LED Light-Emitting Diodes
LIG Low Income Group
LL Lakh Litres
LMV light Motor Vehicle
Consultancy Division
Page |x Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | xi
City Development Plan, Ratlam
Acronyms:
Kutchha Temporary
Pucca Permanent
Para Transit Modes of intermediate public transport like Auto rickshaws, cycle
rickshaws, minidors
Consultancy Division
P a g e | xii Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
1 Project Background
The state of Madhya Pradesh is Urbanising at a fast rate and the rapid
urbanization has led to increase in issues related to infrastructure provision,
planned development, slums and housing etc. Urban Local Bodies of the State
are facing the challenge of meeting the requirements of the growing population
with limited technical and financial resources.
City Development Plan (CDP) is both a perspective and a vision for the future
development of a city.
CDP is a vision document outlining vision, strategies and tasks for the citys
preferred future with focus on the issues of greatest local concern for livability
and the implied requirements in terms of enhancing city productivity, reducing
poverty, improving urban governance and management and enhancing financial
sustainability. It represents the current stage of the citys development. It sets
out the directions of change. It identifies the thrust areas. It also suggests
alternative routes, strategies, and interventions for bringing about the change. It
provides a framework and vision within which projects need to be identified and
implemented. It establishes a logical and consistent framework for evaluation of
investment decisions.
Preparation of the CDP will consist of city development strategies that come out
of a structured consultative process. The process will enable elected
representatives, key staff of MC departments, parastatal agencies and other
institutions, policy makers and the citizens to participate and plan for spatial,
social and economic development of the concern cities. A City Development Plan
(CDP) will present both a vision of a desired future perspective for the city and
the ULBs strategic framework of sectoral plans translated into actions that define
on how the ULB, together with other stakeholders, intends to work towards
achieving their long-term vision in the next twenty five years.
Consultancy Division
Darashaw & Company Pvt Ltd. Page |1
City Development Plan, Ratlam
The whole exercise is divided into four stages, which are further subdivided into
tasks and several sub-tasks or activities within them. Figure below shows the
adopted study methodology and is followed by a brief description on each of the
stages.
Consultancy Division
Page |2 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
This stage included data collection, field reconnaissance and identification of key
stakeholders for the Project. Discussions were held with key stakeholders and a
Kick off workshop was organized involving all the stakeholders.
Consultancy Division
Darashaw & Company Pvt Ltd. Page |3
City Development Plan, Ratlam
The outcome of the meeting and preliminary assessment for the municipal area
has been detailed out in the Inception report. The Inception Report was
submitted by the Consultant to MPUSP and the Municipal Corporation.
After identification of database for the project, a detailed checklist was prepared
for all the sectors and the data was collected from different departments and
parastatal bodies. Additionally rapid field surveys were also conducted to
understand the onsite conditions of the physical and social infrastructure and
services to the citizens with major priority to the urban poor of Ratlam.
The information collected from secondary sources was analysed to arrive at the
present development status at the urban area level. The analysis included all the
sectors as mentioned below:
Infrastructure services
Ecology and Resource Base
Housing
Socio- economic base
Slums and urban poverty
Urban governance
Municipal Finance
Consultancy Division
Page |4 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
This has given the existing status of different sectors and subsequently helps in
arriving to SWOT analysis of all the sectors. The SWOT analysis helped us to
arrive at the Problems and key Issues for all the Sectors.
From the above findings, Consultant has prepared City profile consisting of the
assessment of the existing situation in all the sectors identified during first
workshop. The Sector Analysis Report was submitted by the Consultant to
MPUSP and Municipal Corporation.
This marks the beginning of Stage Four on Strategies and Projects. The first task
in this stage was the generation of future Development Vision for the ULB. The
Consultancy Division
Darashaw & Company Pvt Ltd. Page |5
City Development Plan, Ratlam
Development Vision has been decided on the basis of stakeholders and citizens
perception about their city, sectoral status assessment and SWOT analysis. The
Development Plan will guide all the subsequent stages and will help achieve it
harmoniously. This plan has also incorporated the concept of sustainability and
aim at improved quality of life for the citizens. During the second workshop, the
consultants have presented the procedure for the formation of vision to the
stakeholders with examples of other cities model vision like Bhopal, Indore etc.
Questionnaires were circulated amongst stakeholders and visions for Ratlam City
were collated. Consultants also incorporated the best practices for the service
delivery with international and national example. The service level benchmarking
of other cities were considered amongst the best practices and studied the
possible interventions in implementation in Ratlam. In order to finalize the
Vision statement, the opinion and suggestions from the questionnaires were
studied and developed to suit the characteristics of the City
On the basis of the sectoral issues identified along with the status assessment,
the sectoral goals and strategies were made to overcome those issues. And
these strategies were applied to different sectors on the basis of the sectoral
vision which may be linked to the development vision. The Consultant has
reviewed case studies on city transformations nationally and internationally.
Consultancy Division
Page |6 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Consultant has been updating the client at various stages about the progress of
the project.
While adopting the strategies for each sector consultant has incorporated special
attention to the energy efficiency with strategies for implementation of energy
efficiency projects.
Energy Efficiency
While preparing the City Development Plan the Consultant has laid greater stress
on Energy efficiency measures for sustainable development. Energy efficiency
potential assessment has been attempted to identify the potential energy
efficient measures for the city. Assessment of present street lighting
infrastructure, possibility of replacing them with energy efficient lamps and the
cost analysis also has been done.
The strategies have further been translated into projects for different sectors.
The projects will be then phased on the basis of demand and stakeholders
priorities.
The Consultant has conducted the third workshop to evaluate strategies from the
perspective that will help to achieve vision and sector goals. Stakeholders
expressed their view on the priority actions and projects and accordingly
incorporated in the report. Consultant has also formed consensus from the
various groups to evaluate the strategies, programs and project that will come
under city development plan for the city.
The Consultant has also worked out the cost of projects and has determined the
financial requirements for meeting the demand for infrastructure and services.
The Consultant has determined the phasing to be adopted so that the financials
of the ULB is not burdened while at the same time the objectives of provision of
basic services are met. Consultant has also carried out life cycle O&M costs and
analysed the impacts on finances and of not doing the project.
Consultancy Division
Darashaw & Company Pvt Ltd. Page |7
City Development Plan, Ratlam
The Consultant has identified the projects which can be implemented under PPP
model. Various PPP models like BOT, BOOT, BOLT etc. will be explored. The
Consultant has rich experience in working on BOT projects and has come out
with unique models where the State Government funding for the project
becomes very minimal. The possibility of replicating these models in these ULBs
has been explored and other funding options like public borrowing and pool
finance have also been considered. The Consultant has prepared the Capital
Investment Plan and Financial Operating Plan for the ULB.
The Consultant conducted the fourth and Final Workshop with the stakeholders
to finalize the CDP. Consultants also conducted presentation at district level with
presence of steering group and presented the CIP and FOP for Ratlam City
Development Plan. The need and importance of reforms were presented to the
stakeholders. Institutional reforms were identified which can be implemented
during the scheme period. The reform measures include various e-governance
applications which the ULB should adopt in a phased manner. The reform areas
like Migration to Double Accounting System, Computerisation of Records, E-
Governance applications - Registration of Births and Deaths, E-procurement etc.,
Revision of property tax guidelines and migration to self assessment of property
taxes, Community Participation in budgeting and ULB functioning and
Involvement of private sector in infrastructure projects and service provision
shall be recommended to be adopted.
Details regarding all the stakeholder workshops are discussed in the separated
chapter of stakeholders consultations with subsequent Annexure.
Consultancy Division
Page |8 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
2 City Profile
In the year 1892 Ratlam was connected to Mumbai and Delhi through broad
gauge railway line. In 1901 the city was connected with Mhow and Neemuch
using meter gauge line. The zonal office of western railway was setup at Ratlam,
thus providing Ratlam an important position in the Railway map of our country.
One of the major contributors to the development of the city has been the
establishment of Ratlam as a major junction on western railway. Eventually
Consultancy Division
Darashaw & Company Pvt Ltd. Page |9
City Development Plan, Ratlam
industrial and commercial developments have given impetus to the growth of the
city.
Ratlam is the third biggest city in the state of Madhya Pradesh in terms of
commercial and industrial activity under the Indore Agro industrial region formed
under the section 4 of City and Country Act, 1973. Ratlam city is the important
centre for the agriculture business providing the intangible advantage to Indore
and Baroda region.
2.1 Connectivity
Consultancy Division
P a g e | 10 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
There are three major roads passing through Ratlam city which provides the
connection to the sub-districts, out-states and national region. NH 79 passes
though the city and provides connectivity to the state of Rajasthan. State
Highway-10 provides the connectivity to other districts and MDR-12 (A) connects
the Ratlam to sub-districts.
Ratlam city has the very good rail connectivity. Ratlam junction is Divisional head
quarters of Western Railways. It has both Broad Gauge and Meter Gauge Railway
Lines providing connectivity at regional and national level.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 11
City Development Plan, Ratlam
Consultancy Division
P a g e | 12 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
2.2 Demography
Figure 2-2: Ward wise Map of Ratlam Municipal Corporation
As per Census 2001, population for Ratlam Municipal Corporation was 222202;
Total households were 41544 indicating the Household size of 5.3 as compared
to state urban HH size of 5.5. The male population is 114370 and female
population is 107832. According to master plan prepared in 1990, the projected
population for the year 2001 was 3.51 lakh.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 13
City Development Plan, Ratlam
The population of Ratlam in 1961 was 87472 with growth of 37.96 to the
previous decade of 1951. The Decadal growth rate as shown in the graph shown
below has been declining steadily in the past 5 decades. The population growth
rates of Ratlam City for the past decades are as follows:
Figure 2-3: Decadal
p population growth rate of Ratlam (in %)
40%
36.33%
35% 37.96%
Decadal Growth Rate
30%
30.47% 25.84%
25%
20%
19.74%
15%
10%
5%
0%
1961 1971 1981 1991 2001
Decades
Source: Analysis from the consultants and Census of India
The sudden drop is found in the decade 1991-2001 as the growth rate has
plunged from 29.84% to 19.74%. Possible reason for this sudden drop might be
because of people migrating to other places due to the limited employment
opportunities created by shutting down of many industrial units.
Consultancy Division
P a g e | 14 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Following methods are used for population projection for water supply detailed
project report under the UIDSSMT scheme.
In the water supply DPR, for design purpose it is suggested to follow the mean of
the population given by arithmetic and incremental increase method.
In Ratlam Master plan 2001, the Land Use Planning has been prepared according
to the projected population of 3.51 lakh for the year 2001. But in terms of
industrial development perspective there were shutting down of several many
industries reducing the employment opportunities which caused the reduction in
the estimated population growth rate. Also the lack of poor co-ordination
between several institutes and deprived industrial growth resulted in poor
implementation of master plan 2001.
As mentioned earlier Population as per Master Plan report is 351000 for 2001,
which estimated very high while compared to Census population, 2001 of
222202. For the Ratlam master plan 2021, projected the population of 3.51 lakh
estimated with the help of previous decades growth rate pattern.
However for City development Plan, the incremental increase method seems
appropriate as it shows similarity between the final average populations adopted
under the water supply DPR.
1 This 3.5 lakh population estimation for year 2021 is including the Railway colony, Ratlam
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 15
City Development Plan, Ratlam
The populations for the next 30 years have been projected for Ratlam. The
exercise has been done taking into account the population of past decades and
trends. Future population projections for the City Development Plan have been
projected by the following methods
1. Arithmetic Progression Method
2. Geometric Progression Method
3. Incremental Increase Method
4. Least Square Method
After considering the water supply DPR projections and discussion with officials
and also factors governing the future growth and development of Ratlam City like
industrial, commercial, educational, social and administrative factors, it is felt
that the most suitable method for population projection will be Incremental
increase method.
The abstract of final projections by various methods are summarized in Table
2.4:
Table 2-4: Population Projection Summary
Consultancy Division
P a g e | 16 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
As per census 2001, the literacy Table 2-5: Literacy levels & comparison
rate for the Ratlam Municipal
Literacy levels Total Male Female
Corporation is higher as compared
to the Ratlam district urban and Ratlam 85% 91% 78%
state level literacy rate. It shows In Ratlam urban
the role of education system has district 81% 89% 73%
been significant in the city area. In MP state urban 79% 87% 70%
Source : Census of India, 2001
2.3.2 Social Composition
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 17
City Development Plan, Ratlam
Ratlam Municipal Corporation has an area of 39.19 sq.km. The physical growth of
Ratlam Municipal Corporation is managed by master plan. Under the Madhya
Pradesh City and country planning act, 1973 The T & C.P department has
prepared the Ratlam Master Plan for the year 2021. The Ratlam Municipal
Corporation possesses the implementation responsibility of the master plan. The
master plan is prepared for investment region of 101.64 sq.km.(10164 Ha). The
earlier version of master plan was prepared in 1985 for the year 2001. But, due
to lack of implementation it wasnt executed as per the requirement. The current
master plan prepared for the horizon year of 2021. Meanwhile, due to incomplete
implementation there have been encroachments on the proposed major roads
and the ring roads.
Major objectives of the Ratlam master plan for 2021 are as follows:
Development of the city as a Multidimensional centre
Development as a major economical, commercial and industrial Centre
Development as District administrative and educational Hub
Proximity for the residential region to the working centres
Development through the set of scales between the related activities of
Railways and the nature of the city activities.
Priority to work based activities and related industries.
Consultancy Division
P a g e | 18 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
As per the above table, there has been around 50% implementation of land use
development achieved. However, there has been less implementation in
recreation and commercial landuse development proposed under development
plan.
Amongst entire developed area of 1583.20 Ha, maximum landuse is under
residential purpose with 51%. Recreational landuse contribution is very less i.e.
only 2%. Only 10% i.e 28.80 Ha of the proposed land use has been implemented
versus 266.88 Ha.
Figure 3-1: Existing Landuse pattern
Residential
22%
Commercial
Industrial
2%
51% Govt and Institutional
9%
Recreation
Traffic and
12% Transportation
4%
The entire area has been divided into six planning units having total area of
10163.7 Ha. In the proposed Ratlam development plan, total development area
will be of 4197 Ha after excluding agriculture land of 5966.7 Ha. Following table
provides the proposed land use as provided under Ratlam Development plan,
2021.
The recreational landuse has been proposed for sports facilities of 22 Ha near
Khachrod road which will provide stadium, swimming and other facilities.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 19
City Development Plan, Ratlam
Consultancy Division
P a g e | 20 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Commercial
10%
Industrial
The proposed landuse has been designed for the period of 2021 with forecasted
population of 3.51 lakh however according to the population projections made for
city development plan the population in 2021 has been estimated around 2.9
lakhs. i.e less than the population estimated in development plan. The
development plan, 2001 which was published in 1990 was designed with
projected population of 3.51 lakhs. But after 1998 the industrial growth of the
city was reduced to such an extent that there has large scale of immigration of
labours from Ratlam, thereby population growth rate was not achieved as
estimated for development.
There has been proposal to relocate the industrial activities which are present in
the residential region of the city. Amongst those proposals, Oil mills at Haat
Bazar and Deepak Wire which are currently near to the district headquarters of
Ratlam are proposed to be relocated.
Commercial regions have been developed at Manak Chauk and Chandani Chauk
which render the services to the current population in terms of major business
centre.
The commercial activities of the city are the major economic strength of the city
which has created its own identity in terms of Gold ornaments and clothes.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 21
City Development Plan, Ratlam
Consultancy Division
P a g e | 22 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 23
City Development Plan, Ratlam
4 Economic Development
The economic activities in the city are mainly trade, commerce and industries. As
mentioned in the previous chapter Ratlam is famous for the Gold ornaments and
special Saree designing. Also it has main Agriculture Market which distributes the
large amount of food grains coming from the surrounding villages and districts.
There are approximately 65000 workers in Ratlam out of which majority involved
in trade and services. The work force participation rate in Ratlam is 29.3 percent
which is lower than the WFPR in Ratlam district urban and MP state urban WFPR
as shown in given table below. Further, its dependency on primary sector is only
2.1 percent of the total work force which is low compared to district urban and
state urban primary sector work force share. The other workers contribution is
significant (93.9%) while in comparison to urban district and state level.
Of the total workforce, around 89.44% of workers are main workers and 10.56%
are marginal workers. The majority of main workers are involved in tertiary
sector. Percentage of non-workers to the total population is very high
i.e.70.52%. The classification of workers as per census 2001 is as below:
Consultancy Division
P a g e | 24 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Being the district administrative centre and Railway junction, Ratlam has
significant scale of informal sector in the several part of the city. Most of the
informal sectors are located at Station road, Chandani Chauk, Ghas bazaar,
District Hospital and Kalika Mata temple region. The Ratlam Development plan
has made provision for informal sector of Ratlam as it provides intangible
benefits to the citys economic activities.
Provision of formal commercial sector in terms of shopping complex, hawkers
zone etc.
Priority to service related business activity and loading unloading facilities.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 25
City Development Plan, Ratlam
There has been significant scale of employable population which is either into the
informal sector or is unemployed with large number of male population.
Figure 4-2: Informal sector in Ratlam
Informal sectors near Haat Bazar Informal sectors near Laxmi temple
4.2 Industries
There is a major industrial area of 133.86 Ha in the Ratlam which is under the
District Trade and Industries Centre (DTIC), Ratlam. However Ratlam has many
major industries like G.P.Wires, Ratlam Wires, IPCA laboratories which are
proving support to the city in terms of employment and economy. But since last
decade several industries like Jayant Vitamins, Sajjan Chemicals and steel and
alloys industries are shutting down causing damage to the economy of the area.
Major reason according to the industrial officials is the lack of infrastructure
services. It has been declared that the Ratlam industrial area is under the one of
the most Critical Polluted Areas identified by the Ministry of Environment and
Forest.
According to current information from the District Trade and Industries Centre,
following is the situation in Ratlam city area.
Consultancy Division
P a g e | 26 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
There are some places of tourism interest in Ratlam & surrounding regions.
Following section discusses the regional tourism potential around Ratlam.
Places of interest:-
Ratlam city has several picnic spots in and around the Ratlam. There are many
old temples which are famous for places of devotion. Dholawad dam is the one of
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 27
City Development Plan, Ratlam
the famous picnic spots which is 15 km from the city of Ratlam. Following table
provides the information on the places for devotion and picnic spots.
Ratlam city also has a few recreational places and few tourist attractions. Kalika
Mata Mandir area is the famous tourist spot. Corporation organizes the yearly
festival at this temple. Following are the other famous tourist spots within the
corporation area.
Triveni Temple - God Shankar temple with 100 year old time Kund facility.
Mahalaxmi Temple
Gad Kailash Temple near Amritsagar Lake.
JVL temple.
Apart from temples city has one Ranjeet Vilas Palace which is historic palace
under administrative usage.
According to municipal officials, during the Kalika Mata festival there are around
2 lakhs devotees per day come from surrounding regions of Ratlam. The Ratlam
Municipal Corporation entirely looks after the festival arrangement with provision
of tents at stadium near to the temple.
Figure 4-3: Tourism Places in Ratlam
Consultancy Division
P a g e | 28 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 29
City Development Plan, Ratlam
5 Physical Infrastructure
Clean and safe drinking water supply is the major responsibility of the urban
local body as it is directly related to the health of the citizens. Ratlam Municipal
Corporation owns the drinking water supply responsibility within its limits. This
section will focus on the current performance assessment and demand
assessment for water supply system of Ratlam Municipal Corporation. This
section will focus on the current performance assessment and demand
assessment for water supply system of Ratlam Municipal Corporation. The details
of water supply sources, storage and water availability is discussed as below.
Ratlam Municipal Corporation gets the water from the Dholawad water supply
scheme. Under which at present it has the drinking water supply capacity of 22.0
MLD. After treatment total water supplied from the water treatment plant is 19.8
MLD. Apart from surface water of Dholawad Dam, the water demand is
compensated through the ground water source with tubewells and handpumps.
The water treatment plant is having the capacity of 22.0 MLD. The treatment
plant is provided with clariflocculator (2 nos.) with rapid sand gravity filter. After
passing through clariflocculator and rapid gravity sand filters, Water is supplied
after chlorination process of disinfection. Following table represents the details of
water treatment plant. The ground water is supplied with proper chlorination
plants provided near tubewell stations.
Table 5-1: WTP details for Ratlam water supply
WTP details Nos Unit Capacity
Treatment Capacity 1 MLD 22.00
MLD 13.60
Clariflocculator 2
MLD 9.00
Rapid Sand gravity filters 5 MLD 4.50
Chlorinator 1 MT 0.90
Backwash water tank 1 ML 0.02
Source: UIDSSMT report and master plan, 2021.
Consultancy Division
P a g e | 30 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
There are 14 numbersof Overhead tanks and 2 numbersof sump with total
storage capacity of 13.4 Million Litres and 7.3 Million Litres respectively.
Following table represents the total storage of water in the Ratlam water supply
system.
Some areas of city do not have the access to direct water supply pipeline. In
these areas water has been supplied through tankers. Also there are some areas
especially in slum areas of Ishwar nagar, Jawra Road, in which drinking water
facility has been compensated through tube-well connections and hand-pumps. .
However, some areas are not connected at all by any means of water supply.
E.g. Bajna Basti, Shiv Nagar, Bhavani Nagar, Raam Nagar slum areas. Details
regarding the tanker supply and tube-well and hand-pumps are provided in the
table given below
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 31
City Development Plan, Ratlam
Capacity Supply in
Number of Number of
in litres MLD
tankers trips
litres per day
6 (Govt.) 35 3000 105000 0.105
10 ( Private) 86 12000 1032000 1.032
Type of
Operating Defunct
drinking Total
condition condition
water supply
Handpumps 470 158 628
Tubewells 231 98 329
Source: Water works Department, Ratlam Municipal Corporation
Drinking water supply to the citizens of Ratlam from the hand-pumps and tube-
wells is approximately 2.3 MLD.
Dholawad dam is the main source of drinking water supply for Ratlam Municipal
Corporation. Corporation has been allotted water rights for the 14158 ML, and
current treated drinking water supply is 19.8 MLD. On an average 65 litres per
capita per day (lpcd) is being supplied against the 135 lpcd.
There have been no records of the distribution line. The figures mentioned have been provided as per the
municipal officials at par knowledge.
Consultancy Division
P a g e | 32 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Water works department has manual registration system for water connections
for domestic, commercial and industrial units. There has been inconsistency in
keep up the water connection details. Department has been able to give the
connection details only for the year 2008-09. It is necessary to track down the
number of additional connections provided in each year in order to assess the
household level coverage and cost recovery of the water supply service. There is
no metering system for connections except for the industrial connections.
Following table provides the water tax details applicable as per the type of
connection:
Table 5-6: Water tax as per type of connection
Type of connection Water Tax Rs per month
Residential 90
Commercial 180
Industrial 29/ 1000 litres
Source: Accounts Department, Ratlam Municipal Corporation
The current water supply system, which was initiated in the year 1984, is
capable to cater the drinking water demand till the year 2010. According to the
UIDSSMT report currently ULB is getting water of 22.50 MLD from Dholawad
Dam. Considering 25% loss in the treatment and transmission, water is being
supplied at the rate of 65 lpcd. This augmentation scheme will supply the water
at the rate of 135 lpcd and this scheme is designed for the future population of
390000 for the year 2040.
The augmentation scheme has been divided into two phases. First phase will be
of 25.50 MLD for the next 15 years requirements and second stage will be of
39.5 MLD for the year 2040. The phase wise implementation will before for
pumping and treatment plant provisions.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 33
City Development Plan, Ratlam
After 15 year i.e. during the 2nd stage there will additional capacity building to
the raw water pumping, intermediate booster and water treatment plant.
2The coverage is slums are an estimated figure based on the primary sample survey conducted in slums by the
consultants and verified from the corporation officers.
Consultancy Division
P a g e | 34 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 35
City Development Plan, Ratlam
The current water supply system is not adequate in terms of storage and
distribution services. Due to insufficient amount and huge physical losses in the
system, the pressure at the consumer end is very low.
Following are the sector issues for water supply system of Ratlam:
Present water supply system is old and not adequate and requires
improvement in terms of capacity and level of service.
Per capita supply is low (65 lpcd) against the standard norm of 135 lpcd.
Household Service coverage indicator represents coverage of about 92%. But
is the reliability of this indicator is the major issue.
Some areas have no water supply distribution network; water has been
supplied by tankers in these areas.
The Pressure in the Water supply distribution network is deficient; and also
there are large numbers of illegal connections.
Many connections are without water taps causing huge water losses during
the supply hours.
At many places withdrawal of water is directly by connecting the motor to the
pipe there by reducing the effective pressure in the system.
Need to maintain the computerized register for connections with new
connections record according to the type of connections
Information provided as per the municipal officials, there hasnt been survey for the identification of illegal connection.
Consultancy Division
P a g e | 36 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 37
City Development Plan, Ratlam
of the city. Other part of nallah disposed outside the city crossing the Chhatrii
Bridge passing through collector office, Kalika Mata temple and PHE office at
Sharani pura. The sewer generated throughout the city ultimately disposed into
the nallah thereby causing further contamination of nallah water.
Corporation has prepared the detailed project report of Rs. 20 Cr for
development of drainage network with nallah channelization of 6 km and the
additional storm water drainage network.
According to ULB officials, Ratlam city generates 88 TPD of solid waste out of
which 41 Tonnes Municipal Solid Waste is collected daily. For the ease in
operation Ratlam Municipal Corporation has divided the area into three zones.
These three zones are administered by the sanitary inspector under whom there
are supervisors for each zone who manage the daily activities of the solid waste
management of Ratlam city. Sweepers are managed under the supervisor to
carry daily road sweeping. There are separate laborers provided for the collection
activity of the municipal solid waste. There are total 265 permanent and 211
daily wage sweepers operated under the health department. For transportation
of waste there are 18 drivers for tractor trailers and dumper placer.
Consultancy Division
P a g e | 38 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
According to the municipal officials Ratlam city generates around 88 Metric ton of
Garbage per day at the rate of 350 grams per capita per day (as per 2010
population of 245911). Waste is being collected in all the 49 wards but none of
these wards have Door-Door collection and Waste segregation practices. There
are 150 numbers of pushcarts for primary collection of waste. There are total 65
nos. of containers placed at roadside with capacity of 4.5 m3. The above table
represents the number of dust-bins, i.e, waste collection points created at
different points of the entire city which are in open state at almost all the places.
Ten tractor trailers are in operation for secondary waste collection system and
disposal, each of the 12 tractor trailers makes 3 trips a day. The disposal site is
located at Khad adda, Karmadi road at distance of 3 Kms from Ratlam
Municipal Corporation office. Currently, the disposal site has no treatment
facilities and the waste is being dumped without treatment. A lot of places in the
city dumping of waste is being done on open and vacant plots.
Table 5-12: Vehicles deployed for Secondary waste collection & disposal
Adjustment factor of
Volumetric
Vehicle type Number Trips/ tractor 0.4 for capacity of 2
capacity in Ton
Ton
Tractor trailer 12 3 1.2 42
Total waste disposed on open land 42.00
Source: Health Department
Ratlam Municipal Corporation has got the approval of Rs. 6 Cr from central
government for the Trenching ground. The proposed area of the trenching
ground is of 10 Ha which will also have sanitary landfill facilities. The health
department has proposed the following equipments for municipal solid waste
management.
Wheel barrow-150 nos,
Container (capacity-4 to 6 m3) - 100 nos.
The Ratlam municipal corporation has purchased the two dumpers (Tata-LP
1613) with capacity of 16 tonnes and 9 tonnes respectively.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 39
City Development Plan, Ratlam
Sr. Benchmark in
Indicator Percentage
no percentage
Household level coverage of SWM services,
0 100
1 through door-to-door collection of waste
2 collection efficiency of MSW 47 100
3 Extent of segregation of waste 0 100
4 Extent of recovery of waste collected 0 80
5 Extent of scientific disposal of waste in landfill 0 100
Extent of Cost Recovery for the ULB in SWM
0 100
6 services
7 Efficiency in collection of SWM charges 0 90
Source: computed based on the data collected from Ratlam Corporation
Following table provides the demand assessment for the vehicles required for the
street sweeping waste collection. The road length has been estimated with the
assumption of 1.5m per capita as mentioned earlier.
Table 5-15: Demand assessment for Vehicles (street sweeping and waste collection)
Consultancy Division
P a g e | 40 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Door-to-door collection facility has been assumed and waste shall be collected in
Refuse Compactor Wheelie bins made of High Density Polyethylene (HDPE) with
capacity of 1100 and 660 litres. The segregation of the waste shall be at the
source i.e. at household level. Following table provides information related to
demand assessment for the Refuse Compactor wheelie bins. Considering Indian
scenario, the amount for organic waste is approx.50%. The density of the
municipal solid waste is considered as 0.4T/m3.
Table 5-16: Demand assessment for Refuse compactor wheely bins (HDPE) capacity
1100 liters and 660 liters
S. Description of 2010- 2015- 2025- 2035- 2040-
Norms
No Parameters 11 16 26 36 41
MSW generation Projection
1 in all Residential 88.0 104.5 152.0 203.0 239.0
Households (TPD)
50% by
Biodegradable content weight of
2 44 52 76 101 119
composition (TPD) total MSW
generation
35% by
Non-Biodegradable
weight of
3 (Recyclable, Recoverable, 31 37 53 71 84
total MSW
for RDF etc)(TPD)
gen/day
Bulk density of MSW
4 0.4 T/ m3 0.4 0.4 0.4 0.4 0.4
(T/m3)
Storage volume for TPD/ 110 131 190 253 298
5
Biodegradable waste (m3) Density
50% additional storage
6 volume to avoid 50% 55 65 95 127 149
spillage(m3)
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 41
City Development Plan, Ratlam
Requirement of wheely bin R.C containers for storing waste collected from HTH
from residential House hold
1100 liters capacity (Nos): Say 170 200 290 390 450
660 liters capacity (Nos): Say 200 230 340 450 530
Source: Analysis by the Consultant team
Large containers of size 4.5 m3 are required for Bulk Waste Collection at
different places like commercial areas, markets, restaurants etc. It has been
assumed that the MSW generation is 15% of the Total waste generated. The
demand assessment for the Bulk Waste collection containers has been illustrated
below:
Consultancy Division
P a g e | 42 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Table 5-18: Demand assessment for Construction & Demolition Waste Storage
Containers
S. Description of 2010- 2015- 2025- 2035- 2040-
Norms
No Parameters 11 16 26 36 41
Projected Quantity of
Construction and
Demolition waste
15% of total MSW generation
generation ie HH
MSW and street
sweeping waste
Waste generation for 104 152 203 239 104
1 HH (TPD)
Street sweeping 5 8 10 12 5
5%
(TPD)
Construction &
10 15 20 24 10
Demolition Waste 10%
(TPD)
15 23 30 36 15
Total Waste (TPD)
1 1 1 1 1
2 Bulk density(m3) 1 T/m3
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 43
City Development Plan, Ratlam
In terms of road transport, NH-79 passes through the Ratlam city connecting it
with the Mahu and Nimach cities. Several main roads and sectional roads are
connecting the Ratlam city to the surrounding growth centers.
The city traffic and transport services are one of the major issues of Ratlam city.
There is no city or public transport facility for Ratlam. At present, city transport
services are facilitated by para-transit mode of transportation in terms of auto
rickshaws and six seaters. Traffic officials claim that the number of private
vehicles in the city has been increased three times in last 10-15 years. These
Consultancy Division
P a g e | 44 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
increased numbers of vehicles are causing the congestion problems in the major
commercial areas of the city. The major city roads are not pedestrian friendly
causing inconvenience for the pedestrians due to absence of footpaths and heavy
traffic.
For regional transport services there is one bus stand of MPSTRC which is under
redevelopment stage. Additionally, there are private bus services operating on
two major junctions of the city at Sailana and Javra Road.
There is absence of any public transport facility for movement within city. At
present, city transport services are facilitated by para-transit mode of
transportation in terms of auto rickshaws and six seaters.
Para-transit transportation
The intercity public transport system in Ratlam is majorly through para transit
mode of auto rickshaws and tempo rickshaws. The autorickshows runs through
entire city with major presence at Railway station and junction of commercial
places like Do Batti and Shaher Saray. The auto rickshows are charged on
minimum fix rate of Rs.20 as there is no metered fare system in Ratlam.
The tempo rickshaws originate from Railway station and Jawra Bus stand and
runs through entire city with following locations:
Shaher Saray
Do Batti
Nagar Nigam
Chandani Chauk
Dalu moti BAzar
Dhan Mandi
Chaumukhi Pool
Ghas Bazar
Toph Khana- Ganesh Jevri
Sailana Bus stand
Ram Mandi
Alkapuri
Banjna Bus Stand
The minimum fare is of Rs. 3 while the maximum fare is Rs.5 which will be
applicable for the distance of 5 to 6 km.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 45
City Development Plan, Ratlam
Current width
Sr.No. Name of the road
in "m"
1 Dayanand marg (Haat road to Tripoliya gate 18-22
2 Subhash marg ( upto raniji temple) 18-22
3 Nolaipura 15-18
4 Naharpura (Dalumodi chauk to Manak chauk) 15-18
5 Manak Chauk (upto Ghas Bazar) 9-12
6 Daulatganj Marg (upto Ghas Bazar) 9-12
7 Ghaas bazaar 18-22
8 kasera bazar marg 15-18
9 Dhanmadi (Naharpura chauk to Hardevlala Peepli) 18-22
10 Neemchauk 15-18
11 Bajajkhana marg 12-15
Consultancy Division
P a g e | 46 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Current width
Sr.No. Name of the road
in "m"
12 Daalumodi chauk to Bajajkhana marg 9-12
13 Tilak Marg 9-12
14 Chaumukhi pul marg (ghas bazar to chandani chauk) 18-20
15 Lakkadpitha marg (chandani chauk to Bajna bus stand) 15-18
Biharilal marg (Naahrpura chauk to Purneshwar Mahadev
16 temple) 15-18
17 Mochipura marg (surajmaur to nallah) 9-12
18 Bharaava kuyi marg (Kasera bazar to ghaas bazar) 15-18
19 Rangrez marg 10-12
Source : Ratlam Master Plan 2021
City has total road network of approximately 197.6 km as per the information
provided by the Municipal Corporation. The existing road details of Ratlam are as
follows:
Table 5-20: Performance Indicators for roads in Ratlam
Type of the Road Figure Unit
CC road 11.67 Km
Bitumen Road 120.00 Km
WBM Road 53.46 Km
Motorable 3
12.47 Km
Total length of the road 197.6 Km
Road length density (Area) 5.04 Km / Sq. km
Road length density (Population) 0.78 M per capita
Source : Public works Department, Ratlam Municipal Corporation
The current per capita road length in m is 0.78 m against the standard of 1.5 m
per capita length. The total road length with respect to municipal corporation
area is 5 km per sq.km.
3 Motorable road, as defined by Municipal Official, is the road which is the kind of WBM road
lower in quality but better than the kuchha road.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 47
City Development Plan, Ratlam
Ratlam has 7575 street lights positioned all over the municipal areas out of which
299 street lights are in not in working position. Total connected load from all the
heavy and light bulb street lights is 1442 KW.
The present status of street lighting can be summarized as in the following table.
Table 5-22: Connected load details.
40 W Tube Lights
Number of lamps 1712 nos
Wattage of each lamp 40 W
Total Connected Load 68480 W
250 W Sodium Vapor Lamps
Number of Lamps 3955 nos
Wattage of each Lamp 250 W
Wattage of Ballast 30 W
Total Wattage of 1 lamp 280 W
Total Load 1107400 W
Per Capita road length of 1.5 meter is considered for calculation.
Consultancy Division
P a g e | 48 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 49
City Development Plan, Ratlam
Most of the street lights are old need to be replaced in order to achieve better
energy savings.
Consultancy Division
P a g e | 50 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
6 Socio-Economic Infrastructure
6.1 Health
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 51
City Development Plan, Ratlam
6.2 Education
Ratlam has altogether 436 schools spread over 49 wards. The ward wise
distribution of schools is listed below.
Table 6-3: Existing school Facilities
Ward no. No. of schools Ward no. No. of schools Ward no. No. of schools
1 22 18 9 35 0
2 8 19 24 36 9
3 9 20 17 37 17
4 13 21 5 38 11
5 5 22 6 39 15
6 5 23 17 40 14
7 2 24 12 41 0
8 13 25 6 42 3
9 4 26 5 43 0
10 21 27 10 44 2
11 3 28 23 45 0
12 9 29 1 46 13
13 16 30 14 47 1
14 9 31 24 48 3
15 9 32 5
16 1 33 5 49 2
Total number of schools 436
Source: District institute of education and training, Ratlam
There are no provisions of toilet in boys school, while only six number of girls
high school have been provided the toilet facilities. Following table provides the
information related to the toilet facilities in government school in Ratlam.
Ratlam city has five number of colleges which are providing higher education in
Arts, science and commerce sector. The only Industrial Training Institute (I.T.I)
is located on the Sailana Road.
In the planning sector no.5, in master plan of Ratlam there has been provision of
10 Ha land for engineering college.
Table 6-4: Toilets facilities in Govt Schools in Ratlam
Girls Co-Education Boys
Particulars School school school Total
no. of Govt schools 10 60 2 72
No. of enrolments 2162 9081 137 11380
School with toilet facility 6 40 nil 46
Source: DPR of IHSDP, Ratlam Municipal Corporation
Consultancy Division
P a g e | 52 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
6.3 Recreation
For recreation purposes, Ratlam city has a park along with a water body at Zaali
Lake near Kalika mata temple. There are other two lakes Amrut Sagar and
Barbad within the city. There is existing stadium near Zaali Lake which is utilized
for several fair purposes. Apart from these there are 11 childrens garden and
two corporation gardens in the Ratlam city.
There are several proposals for recreational sector under Ratlam master plan.
There has been allotment of 22 Ha land for regional sport activity at Kharchod
road under which there are proposal for stadium, swimming pool and other
sports facilities. Apart from above proposals one swimming pool is proposed near
the Amrut Sagar Lake in the Ratlam City.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 53
City Development Plan, Ratlam
Consultancy Division
P a g e | 54 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
As per Census of India, the slum areas are broadly defined as:-
(iii) A compact area of at least 300 persons or about 60-70 households of poorly
built congested tenements, in unhygienic environment usually with inadequate
infrastructure and lacking in proper sanitary and drinking water facilities.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 55
City Development Plan, Ratlam
Ratlam Municipal Corporation has prepared the Detailed Project Report for Slum
Environmental Sanitation under IHSDP with estimated cost of Rs.355.42 Lacs.
But, this project was not implemented due to pending approval from the central
government. The City Support Unit has been preparing the detailed project
report for two slums named Mominpura and Subhashnagar under which
assessment of basic service provisions and biometric survey of each household
has been carried out.
Consultancy Division
P a g e | 56 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
WARD NO. TOTAL HH under BPL WARD NO. TOTAL HH under BPL
19 434 44 467
20 1253 45 211
21 490 46 429
22 338 47 212
23 566 48 85
24 199 49 58
25 136
Total 18008
26 31
Source: Ratlam Municipal Corporation
The municipal corporation does not have record of infrastructure facilities in each
of the slum. In absence of data, the consultants have conducted a sample
primary survey in order to ascertain the level of service provision in slums in
Ratlam. The consultants visited 12 slums in city namely Laxmanpura, Rajgadh,
Subhashnagar, Haatki Chauki, Ishwar nagar, Moti Nagar, Jawra Road (Shiv-
shankar Colony), Sherani Pura, Maratho ka vaas, Jawahar nagar, Viriyakhedi and
Momin pura, The major findings of the primary survey are as following.
Most of the slums are dependent of tubewells and handpumps for drinking
water facilities. However the quality of water is tubewells is brackish and
higher in salt content and hence not fit for drinking water purposes.
Approximately 30% of slum settlements have piped water and are mostly
having public taps. Around 8- 10 households are dependent on one public tap
in most of the cases.
There are no sewerage facilities in any of the slums and the sewerage water
from kitchen and bathrooms are drained into open drains (Gutter) causing
unhygienic and unclean conditions.
There is no collection of Solid waste from majority of the slums on daily basis.
Nor is there any provision of collection bins where the solid waste generated
can be dumped. Most of the slums dispose of the solid waste in the drains or
on open plots nearby.
Approximately 45% of households in slums do not have any access to toilet
facilities and follow the practice of Open defecation.
The condition of roads and streetlighting facilities in majority of slums is
considerably well.
Most of the slums have access to primary education through Anaganwadi and
Government schools.
There is absence of any kind of health facilities in all the slums. There are no
facilities even in form of Primary health centres, clinics or maternity services.
Table 7-3: Infrastructure status and service provision in Slums
Infrastructure status in slums
Total Number of wards 49
Total number of zones 3
Total number of slums 32
Total Number of HH 13400
Total number of community toilets 36
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 57
City Development Plan, Ratlam
Consultancy Division
P a g e | 58 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 59
City Development Plan, Ratlam
8 Housing
As per Census 1991, in Ratlam there were 35570 families was living in 34781
numbers of residential units. According to Census 2001, there is an increase in
number of families to 44109 residing in 43130 numbers of residential units.
Accordingly, the household size comes to 5.32 persons per HH. Considering
individual housing requirement the deficit for residential units as per the Census
2001 is 989.
As per the year 2001, there are 32 numbersof slums Table 8-1: projections
identified in Ratlam city with population of 65155 living for slum population
in several parts of the city. In those 32 numbersof Slum
slums there are 12786 numbers of residential units, Year Population
amongst those 30% of the units requires the 2000 65155
reestablishment. There are 745 numbersof slum houses 2001 67761
which require 100% reestablishments amongst the 32
2002 70472
numbersof identifies slum settlements. The slum
2003 73291
population information is of 10 years old, hence it
requires some projection for have significant projection 2004 76222
for the year 2010. As per our discussion with municipal 2005 79271
officials, slum population has been projected at the rate 2006 82442
of 4% per year with 2000 as base year for the 2007 85740
calculation. Estimated slum population with projection
2008 89169
is 96445 for the year 2010. the number of HH under
2009 92736
BPL as per 2009-10 survey is 18009 with approx
population of 90000. 2010 96445
2011 100303
Following table provides the housing requirement in
detail.
Table 8-2: Housing Deficit
Details Total Establishment % Housing Deficit
Housing Deficit till year 2001 --- --- 989
Kutcha houses in slum area 12786 30 3836
Others in Slum 745 100 745
Total 5570
Source: Ratlam Municipal Corporation
As per the above table there are deficit of 5570 numbersof household units.The
housing demand for the year 2021 has been estimated in the following table.
Consultancy Division
P a g e | 60 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
The household size for Ratlam is 5.32; it has been assumed that at the year
2011 and 2022 the HH size will 5.20 and 5.00 respectively. After considering the
current housing deficit, the housing requirement for the year 2021 is 26883.
Housing Requirement
Income Group % Numbers
Economical Weaker Class 40 10753
Lower Income Group 30 8065
Middle Income Group 25 6721
High Income Group 5 1344
Total 100 26883
Source: Analysis from consultants
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 61
City Development Plan, Ratlam
established railway colony with daily wage labours and employees of Indian
railways. The famous Do Batti Chauraha developed which provides the
connectivity to the Railway colony, Sailana road and to the Manak chauk.
In the past couple of decades new areas of development in the city are towards
the North of the city and towards the south west. New colonies have come up
along Sailana Road namely Kasturba Nagar, Jawahar Nagar, Alkapur,
Gandhinagar and Laxmanpura. Also new colonies have been developed in south
region near to the Amrut Sagar Lake namely Kalyan Nagar and Din Dayal Nagar.
Even the property rates in the city have seen a considerable increase in past few
years. Especially the commercial rates in area of Manek Chauk and Shaher Sarai
have been doubled since last three years even the period of recession in other
parts of the country.
In the past decade i.e from 2001 to 2010 the population of Ratlam has increased
from 234419 to 252274. The pace of growth of population in Ratlam is slow to
moderate. In the past decade the city grew towards the north east and
diagonally to it on the south west.
Following figure shows the growth trend and chronological development of the
city over the past decades
Figure 8-1: Chronological Development of Ratlam
Consultancy Division
P a g e | 62 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
9 Environment Status
All living and non living things along with the surrounding atmosphere in an
urban area constitutes urban environment. Ironically, all these three ingredients
in the environment have the ability to cause effect over each other, even by
slight change and process of cycle. Thus the intersection and overlap of the
natural environment, the built and socioeconomic environment constitutes the
urban environment.
9.1.1 Topography
The topography of the Ratlam city is almost flat and uniform through out the city
area. Current industrial area is located at higher level with considerable slope at
the south direction. Also there is slope at south-east direction at the downstream
side where industrial area is situated. The rain water generally flows towards the
south direction and collected at two nallah flowing through the city. There are
two lakes located at northern side of the city.
The district lies on a part of Malwa plateau with typical Trappean geomorphology
comprising extensive plain, low lying hills and hills clusters with gentle northerly
slope.
Ratlam region is under Zone II of Low Damage Risk Earthquake Zone without
any neotectonic fault or thrust.
The soil in Ratlam is of mixed type and there is no distinct boundary in between
any two type of soils. Black cotton Soil dark grey to black in color, composed of
clay and is plastic & sticky in nature. The alluvium is of mixed origin & comprises
of silt & clay and admixtures of these in varying properties. Lateritic soil consists
of sandy loam to clayey loam and brick red to red in colour.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 63
City Development Plan, Ratlam
Consultancy Division
P a g e | 64 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Sr Residual
Particulars Physical Chemical Biological
No Chlorine
5 Raw water sample 30 30 5
6 Clear water sample 30 30 5 30
7 Reservoir tank 20 125
8 Distribution 24 100
Source: Public Heath Engineering Department,, Ratlam.
As per the Ratlam master plan 2001 only 49.78% of the proposed landuse has
been implemented. Under which there has been poor implementation for the
recreational landuse. Following table provides the information regarding the
landuse implementation in accordance with Ratlam master plan 2001.
Table 9-2: Land use implemented till 2008 under master plan 2001
As per
Sr. Developed Fluctuation %
Land use 2001
No. Area Ha (Ha) Implementation
in Ha
1 Residential 1438.83 807.32 631.51 56.11%
2 Commercial 211.25 65.65 145.6 31.08%
3 Industrial 388.90 184.00 204.9 47.31%
4 Govt.& Institutional 397.70 142.43 255.27 35.81%
5 Recreation 266.88 28.80 238.08 10.79%
6 Traffic and
Transportation 476.44 355.00 121.44 74.51%
Total 3180.00 1583.20 1596.80 49.8%
Source: Ratlam Master Plan2021
In the revised master plan for 2021, the planning area has been divided into six
planning units and accordingly the land use pattern has been allotted. The land
use pattern has been distributed for a population of 3.5 lakh assumed for the
year 2021 with a population density of 83 persons per hectare.
In the revised master plan for 2021, the 230.5 Ha agricultural land has been
converted to other landuse purpose of residential, industrial and institutional use.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 65
City Development Plan, Ratlam
Table 9-3: Proposed land use patter for Master Plan 2021
In order to avoid anthropogenic hazards like fire, Municipal Corporation has the
one fire fighting vehicle and well equipped workshop for operation and
maintenance. However there is need for the disaster management cell in order to
deal with the various events like Kalika Mata festival and also the natural
catastrophe in the form of heavy rains and floods.
Access to water
Ratlam city has inadequate supply of water in terms of quality and quantities.
Direct water supply is not covered through entire corporation area. Still in slum
areas like Ishwar Nagar, Jawara Road Slum regions there are supply through
common bore or hand pumps. There are provisions of public standpost but these
connections are without tap hence huge amount of water losses are occurring
during the supply time. Some areas are having water supply through borewell for
common water supply there by causing wastage of water and ground water
depletion with improper monitoring of bore water supply.
Open spaces are getting reduced due to encroachments and illegal construction
due to the absence of proper regulation in order to maintain the planned lay out.
Overall, City has inadequate recreational spaces.
Ratlam has no sewer network. Waste gets disposed either in open plots or in
individual septic tanks. Community Sanitation facilities are inadequate.
Ultimately, the disposal of the sewage into the natural drainage channels without
treatment causing health hazards.
Consultancy Division
P a g e | 66 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
City has not adopted Door to Door waste collection system and waste
segregation system due to absence of waste treatment plant in the disposal site.
Collection efficiency is just 60% resulting in garbage pileup at the collection
points and road side bins causing environmental pollution.
5
A Comprehensive Environmental Pollution Index (CEPI), which is a rational number to characterize
the environmental quality at a given location following the algorithm of source, pathway and receptor
have been developed. The index captures the various health dimensions of environment including air,
water and land. Larger the percentage of CEPI means area is more prone for environmental pollution
due to industrial activities.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 67
City Development Plan, Ratlam
Ratlam city has historical importance as princely state and ruled under the Raja
Ratan Singh during 17th century. Ratlam princely state was the part of Malwa
agency of central India. City does not the any heritage site listed under
Archeology Survey of India. From the discussion with municipal officials, ward
councilors, citizens and the field survey, there have been identification of 10
number of tangible heritage structures in the city of Ratlam.
Heritage structures in the state are regulated under the Madhya Pradesh State
Archeological Department (Directorate of Archeology, Archives and Museums.
The District Archaeological Museum, Ratlam established by District
Archaeological Associations.
Following locations have been identified under heritage structures as per the
discussion with the stakeholders and municipal officials of Ratlam.
1. Kalika Mata Mandir (Temple)
2. Jhali Talab (Lake)
3. Mahalwada (Palace)
4. Gulab Udyan
5. Collectorate Office
6. Triveni Dham
7. Tripolia Gate
8. Ganesh Gopal Mandir (Temple)
9. Raniji ka Mandir (Temple)
10. Bawdi (step wells- more than 50 in numbers)
These heritage structure listed above are having lack of heritage infrastructure
with absence approach roads, parking provision and unawareness of the
historical importance of these tangible heritage assets which are contributing the
development of Ratlam city. The issues in relation with heritage structure and
infrastructure have been discussed in the subsequent section in this chapter. Also
strategies and action plans for conservation of heritage structures have been
discussed along with issues.
Consultancy Division
P a g e | 68 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Raniji Ka Madir Near Ghas Bazar Palace in the heart of the city
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 69
City Development Plan, Ratlam
This department is responsible for monitoring and maintaining the heritage sites
and museums which has been listed and established respectively by the
directorate in the state of Madhya Pradesh. Directorate prepares the annual
action plan for excavation, training seminars and exhibitions under the MP
archeology.
The maintenance and conservation of the heritage have been accountable not
only to state archeology department but also Ratlam Municipal Corporation. City
must give the priority to the heritage structures and their importance for the
growth of the city. Following strategies and action plans can be utilized for
heritage conservation of Ratlam city
Formation of Ratlam Heritage Conservation Committee:
Institutional provision shall be made with an establishment of Heritage
Committee involving the Ratlam Municipal Corporation, District Collector and
Consultancy Division
P a g e | 70 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
state level para-statal agencies like Ratlam Development Authority, town and
country planning department and state archeology department. Hon. District
collector shall be the chairman of the committee and the member can be Hon.
Mayor and Commissioner Ratlam Municipal Corporation, and key representatives
of the state para-statal agencies as mentioned earlier.
Role of the committee shall the enlisting, maintaining and monitoring the
heritage structure of the city. There can be monthly review from the committee
discussing the existing situation and various strategies and actions to improve
the heritage infrastructure.
Ratlam Municipal Corporation may make provision in the budget for heritage
conservation. There can be separate provision for the heritage fund under which
provision and maintenance of heritage structures and infrastructure required as
under.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 71
City Development Plan, Ratlam
11 Financial Status
For a city to have sustainable growth and development, its financials should be
sound and self-sustaining with minimum dependence on grants / external
sources. This chapter illustrates the finances of Ratlam Municipal Corporation
finance in the previous four years (2005-06 to 2008-09). The analysis provides
the financial status of the urban local body with the study of the existing tax
framework and the expenditure made under various heads. The problem areas
requiring immediate attention have also been highlighted.
The Financials of Ratlam Municipal Corporation for four years i.e. 2005-06 to
2008-09 has been presented in the Table below. Amongst the tax income, the
property tax contributes maximum compared to water tax and others. However,
the grants and contributions is the maximum involvement in the income of
Ratlam Municipal Corporation.
Under expenditure of RMC, there has been a separate provision for capital
expenditure under mission and vision works. Mission works are the important
capital project under infrastructure augmentation in terms of roads, water supply
etc. The vision works have been directly related to the public welfare works. This
capital expenditure is contributing maximum contribution in the expenditure
heads of Ratlam Municipal Corporation.
Consultancy Division
P a g e | 72 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Apart from the capital expenditures, the establishment expenditure in the form of
salaries for permanent and temporary employees is maximum contributors for
Ratlam municipal corporation expenditure. Apart from these expenditure,
departmental expenditure has been mentioned in the expenditure table provide
above. The electricity expenses are for street lighting and water works
department inclusively.
Over the past four years (2008-09 to 2005-06) Ratlam Municipal Corporation has
been producing a bumpy ride in terms of income and expenses. RMC had booked
a surplus of ` 16.73 Lakhs and ` 506.46 Lakhs in the years 2006-07 and 2007-
08 respectively. However extensive development works undertaken in recent
times and lower dependence on grants and contributions have led to a dip in
financials in the year 2008-09. It was observed that RMC had shown a deficit of
` 97.86 Lakhs during that period. A similar, although lower deficit of ` 32.16
Lakhs was booked during 2005-06 also. The following diagram represents the
revenue and expense details of Ratlam Municipal Corporation.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 73
City Development Plan, Ratlam
Municipal taxes, Non-tax revenues and Grants & Contribution are the broad
categories of income for Ratlam Municipal Corporation. As seen from the pie
diagram illustrated below, it is seen that Municipal Taxes account to 19% of the
total income received by Ratlam Municipal Corporation in the year 2008-09 and
Grants & Contribution contribute the majority (65%) portion.
Figure 11-2: Revenue of Ratlam Municipal corporation
The analysis of revenue under various heads has been presented in the following
sections which would enable a clear understanding of the intricacies involved in
the financial analysis.
Consultancy Division
P a g e | 74 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Municipal Taxes account for only 19.0% of the total income of Ratlam Municipal
Corporation for the year 2008-09. This can be attributed to the non-assessment
of all the properties in the Municipal Corporation area, non imposition of taxes for
the services and poor service delivery. The Municipal taxes levied include:
Property Tax and others
Water Tax and others
License fees
Other License Fees and other fees
Other taxes
Figure 11-3: Municipal Taxes
Property tax accounts for 47% of the municipal taxes, while water tax accounts
for 42% of the municipal taxes for the year 2008-09. Other taxes, license fees,
other license fees and other fees add up to the rest.
Property tax
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 75
City Development Plan, Ratlam
As seen from the Figure below it is clear that the Current Property Tax Collection
Efficiency (CPTCE) during the five year period has been showing an inconsistent
growth with the highest being in the year 2005-06.
Figure 11-4 : Arrear and Current Property Tax Collection
Source: Demand collection Balance Statement, Property tax department, Ratlam Municipal Corporation
In 2008-09, the CPTCE was 46.1%, which is a dismal figure considering the
prominence of property tax in the overall financial health of the corporation.
However, the Arrear Property Tax Collection Efficiency (APTCE) has been showing
a remarkable growth rate touching almost 80% in the financial year 2008-09.
Consultancy Division
P a g e | 76 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Source: Demand collection Balance Statement, Property tax department, Ratlam Municipal Corporation
The Current Development Charge Collection Efficiency has been hovering around
40-50% and Arrear Development Charge Collection Efficiency has improved
consistently from 46.2% in 2004-05 to 65.7% in 2008-09.
Consolidated tax
The consolidated tax is collected along with the property tax is as a charge for
providing collective sanitation facilities, firefighting services and street lighting.
Presently an amount of ` 180 is being levied as Consolidated Tax from all those
properties having a rental value of less than `18000. If the rental value of any
property exceeds ` 18000, then the tax is levied as a percentage (1%) of the
rental value.
From the demand collection balance statement the collection efficiency for the
arrears is found to be more than the current during the period 2004-05 to 2008-
09. The current collection efficiency has been very poor i.e less than 40% during
the last five year timeline.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 77
City Development Plan, Ratlam
Source: Demand collection Balance Statement, Property tax department, Ratlam Municipal Corporation
Education Cess
As per the state government order 2000-01, the Education Cess is levied at 2%
of the property tax. Following table illustrates the Education Cess collection
details in the last 5 years.
Table 11-6: Collection Efficiency for Education Cess Rs. in lakhs
Sr. Total Demand Total Collection Efficiency
Year
No. Current Arrears Current Arrears Current Arrears
1 2004-05 35.00 27.53 12.78 15.21 36.5% 55.2%
2 2005-06 40.00 34.54 14.53 18.8 36.3% 54.4%
3 2006-07 50.00 54.76 20.14 30.76 40.3% 56.2%
4 2007-08 45.00 47.36 20.38 27.32 45.3% 57.7%
5 2008-09 45.00 44.66 23.02 28.85 51.2% 64.6%
Source: Demand collection Balance Sheet, Property Tax Department, Ratlam Municipal Corporation
A graphical representation of the same has been provided below.
Source: Demand collection Balance Statement, Property tax department, Ratlam Municipal Corporation
Current collection efficiency for education Cess is much less as compared to the
arrears collection efficiency. However, the collection efficiency has been
increasing over the five year period from 2004-05 to 2008-09.
Consultancy Division
P a g e | 78 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Water tax
Water tax is levied at ` 90 for residential properties and ` 180 per month for
commercial properties. For industrial purpose it is ` 29/1000 liters.
Table 11-7: Collection Efficiency for Water Tax
Sr. Total Demand Total Collection Efficiency
Year
No. Current Arrears Current Arrears Current Arrears
1 2004-05 35.00 27.53 12.78 15.21 36.5% 55.2%
2 2005-06 40.00 34.54 14.53 18.8 36.3% 54.4%
3 2006-07 50.00 54.76 20.14 30.76 40.3% 56.2%
4 2007-08 45.00 47.36 20.38 27.32 45.3% 57.7%
5 2008-09 45.00 44.66 23.02 28.85 51.2% 64.6%
Source: Demand collection Balance Sheet, Property Tax Department, Ratlam Municipal Corporation
From the analysis of the six year data of the demand collection balance
statement it is clear that the collection efficiency for the arrears is very poor.
However, the current collection efficiency is very significant and average it is
above 85% over the six year water tax collection.
Figure 11-8 : Arrear and Current Water Tax Collection
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 79
City Development Plan, Ratlam
Extraordinary income
Grants have been one of the total income of the Municipal Corporation. There are
33 categories of grants which Ratlam Municipal Corporation has availed in the
last 5 years, out of which the major ones have been the following:
1. Tax Compensation
2. 10% Surcharge
3. State finance commission grant
4. 12th finance commission
5. Stamp Duty
6. Grant under Mid-Day meal programme
7. Grant towards Road Escorts
8. Travellers Compensation
9. Grant from state education centre (Sarva shiksha abhiyan)
10. Grant from MLA fund
11. MPUSP (Uthhan)
Consultancy Division
P a g e | 80 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Tax compensation
Tax compensation accounts for about 50% of the total grants to the Municipal
Corporation for the year 2008-09.
10% Surcharge
The second major contributor in the form of Grants has been 10% surcharge
grant which accounted to almost 16% in the year 2008-09.
The Road maintenance grant is being provided to the ULBs primarily for new
road construction and maintenance of the roads. Road maintenance grant
accounts for 4% of the total grant of the Municipal Corporation for the year
2008-09.
State Finance Commission grant account for 5% of the total grant of the
Municipal Corporation for the year 2008-09. The State Finance Commission grant
is provided to ULBs to meet their capital and O&M expenditure.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 81
City Development Plan, Ratlam
Ratlam Municipal Corporation is receiving the several grants from the state
initiated programmes like Project Utthan, MPUSP as well as the GOI programmes
like UIDSMMT schemes for infrastructure development. MPUSP contributed 1.6%,
i.e. Rs.36 Lakhs in the Grants and contribution for the Ratlam Municipal
Corporation.
Other grants
Other grants include 10% surcharge and Mid-day meal programme, MP/ MLA
grant, water grant, and they account for 16%, 4% and 0.3% of the total grant
respectively for the year 2008-09.
The analysis of expenditure under various heads in the last four years is
presented below.
Consultancy Division
P a g e | 82 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
70%
Extraordinary Suspense
60% Expenses
Departmental Expenses
50%
40% Establishments
30%
Public Welfare Works
20%
Important Development
10%
Works
0%
2008-09 2007-08 2006-07 2005-06
Source: compiled from Municipal Accounts, Ratlam Municipal Corporation
From the above graph it is clear that the establishment expenses utilize the
major part among the different particulars of the expenditure. Ratlam Municipal
Corporation yearly carries out mission and vision capital works under the heads
of important Development works and Public Welfare works. These are capital
expenditures in the major sectors like water supply, roads, public health and
recreation. The analysis of expenditure under the various heads in the last four
years is presented below.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 83
City Development Plan, Ratlam
Source: compiled from Municipal Accounts, Ratlam Municipal Corporation for 2008-09
Departmental Expenses
Source: compiled from Municipal Accounts, Ratlam Municipal Corporation for 2008-09
These are the expenses which come under the Grain loans, festival loans,
deposits and advances. They have been contributing around 9% at an average
over the four year period.
Consultancy Division
P a g e | 84 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Other Miscellaneous
These are the expenses incurred under telephone, electricity and fuel expenses.
The major contributor is electricity which is 90% of these expenses. They have
been increasing considerably from 65% to 90% in the four years.
The capital expenditures incurred for Ratlam Municipal Corporation are being
shown as the Important Development works (Mission works) and public welfare
works (Vision works) in the Budget.
Following capital project are considered under the important development works
(Mission Works):
Water works- major water supply related projects like construction of
sump wells, purchasing and laying of pipelines, construction of OHTs etc.
Public facilities- construction of public facilities like public toilets, provision
of toilets facilities, recreational spaces etc.
Residential colonies- land acquisition and development
City beautification- road and bridge widening, beautification of religious
spaces.
Transport nagar- transport nagar land acquisition and development
Commercial complex- land purchasing and construction of shops
Development of Vegetable market- development of hawkers zone and
market places.
Following capital project are considered under the public welfare works (Vision
Works):
Public works- government school maintenance and public works
City sanitation- MPUSP (Utthan) projects, well and lake maintenance and
cleaning, construction of landfill site and treatment plant.
Education and health-health campaign etc.
Child welfare-mid day meal, library and playing facility.
Builder promoters- new constructions under Municipal Corporation like
new community hall, bus stand, staff quarters etc.
Cultural events- expenditure on various religious fairs.
Sports and recreational facilities-national and state level sports
programmes.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 85
City Development Plan, Ratlam
Source: compiled from Municipal Accounts, Ratlam Municipal Corporation for 2008-09
Expenditure on capital works account for about 8% to 9% of the total municipal
expenditure of Ratlam Municipal Corporation for the year 2005-06 to 2008-09.
The capital expenditure incurred is towards road construction, water supply,
storm water drain, building works and slum rehabilitation. The break-up of
capital expenditure for the last five years is as follows:
The major sector wise expenditure incurred under the capital projects are
towards water supply, child welfare and city sanitation sector. However from the
four years capital expenditure scenario there has been variation in the sector
wise expenditure for the different projects. During the year 2008-09, the water
supply sector has contributed 42% in the overall capital expenditure.
Consultancy Division
P a g e | 86 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
The cost recovery for sanitation, street light and fire services obtained through
the consolidated taxes which are collected along with the Property Tax. From the
analysis it is clear that the cost recovery for the services is very less i.e. only
8.5% for the year 2008-09 and it has been decreasing from 32% earlier in the
year 2005-06.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 87
City Development Plan, Ratlam
Table 11-10: Cost Recovery for sanitation, street light & fire services in Rs. Lakhs
Operational expenses 2008-09 2007-08 2006-07 2005-06
Total operational expenditure 706.7 657.7 217.88 171.45
Consolidated tax 60 60 60 55
Cost recovery 8% 9% 28% 32%
Source: compiled from Municipal Accounts, Ratlam Municipal Corporation
Hence, in order to provide efficient service provision Ratlam Municipal
Corporation needs to impose separate taxes for street lighting, sanitation at
reasonable rates to ensure direct cost recovery for each of these services which
is now collected under consolidated taxes.
Figure 11-17 :cost recovery for street lights and fire fighting
11.5 Issues
Cost recovery is only 69% for water supply services and for other services it is
8% in the year 2008-09.
The operational expenses in terms of energy expenditure for water supply are
very high
There is need to revise the water pricing for the water supply services of the
Ratlam.
There is need to levy the separate tax for municipal solid waste management
services as the administration and overall operational expenditure are
maximum as compared to the other departments.
There is need to assess the properties in order to register the entire properties
under the Ratlam Municipal corporation.
Grants and transfers account for about 65% of the total revenue while
municipal taxes account for only 18% of the total revenue for the year 2008-
09. The share of municipal taxes to the total income need to be improved.
Consultancy Division
P a g e | 88 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
12 Institutional framework
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 89
City Development Plan, Ratlam
carries the functions like building housing colonies with efficient infrastructure.
Housing Board also constructs the commercial, retail and other types of
buildings for Health, Education and cultural activities. Madhya Pradesh Griha
Nirman Manal Regulation, 1998, State Housing and Habitat Policy 2007 are the
major act and policy which govern department.
Consultancy Division
P a g e | 90 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
12.2 Organization
The Executive wing is headed by the Municipal Commissioner. There are 11
Departments under which Mayor in Corporation (MICs) has been formed in
Ratlam Municipal Corporation. They are:
Housing and environment
Revenue Department
Accounts and General Administration Department
Planning and Rehabilitation Department
Public Works Department
Water Works Department
Health and Medicine Department
Market (Bazaar) Department
Education Department
Women and Child Welfare Department
Food and civil supplies Department
Apart from above departments formed under MICs, there are other department
existing under the Municipal Corporation are:
Fire department
Workshop
Street light department
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 91
City Development Plan, Ratlam
1 General Administration 9 6 3
2 Accounts 14 6 8
3 Revenue Department 44 27 17
4 Fire Department 22 10 12
5 Lok Nirman (PWD) 66 56 10
6 Water Supply Department 46 28 18
7 Health Department 26 15 11
8 Sweepers 396 264 132
9 Others 225 188 37
Total 848 600 248
Source: compiled from data collected from Ratlam Municipal Corporation
The post for the Deputy Municipal commissioner is vacant for the
administrative purpose which required to be filled immediately in order to
administer the corporation in absence of the municipal commissioner. Also
revenue department and water works department has the significant number of
the vacant posts.
Consultancy Division
P a g e | 92 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 93
City Development Plan, Ratlam
Consultancy Division
P a g e | 94 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
have been explained under the section of reforms and resource mobilization
under section 17.5 explained in subsequent chapters.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 95
City Development Plan, Ratlam
Consultancy Division
P a g e | 96 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 97
City Development Plan, Ratlam
Consultancy Division
P a g e | 98 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
13 Identification of issues
Strength Weakness
Ratlam is the major Railway junction Inefficient water supply with low
hence it provides the strong pressure
connectivity across the country. City has no comprehensive water
One of the major commercial market supply and sewerage system as on
in terms of Sarees and Gold today.
ornaments Ratlami shev famous and City lacks proper collection,
sold across the country. processing and treatment facilities
District headquarters, all the major for solid Waste management.
governmental offices are in Ratlam Poor financials deters Municipal
city. Corporation from taking Capital
Ratlam is located near Ujjain and the Intensive projects
city itself is famous for its Kalika Mata Poor city road network and city
temple, hence occupying an important transport facilities.
place in religious map of the State.
Nagda- Ratlam industrial region has
The city has few attractive locations been classified as Critically Polluted
for recreation like City palace, Barbad Area.
lake.
Opportunities Threats
Commercial and industrial
opportunities in terms of skilled labor Burgeoning Slums a major
and existing industrial area. concerns for Ratlam
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 99
City Development Plan, Ratlam
Consultancy Division
P a g e | 100 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
SECTORS ISSUES
City has staff inadequacy & most of the conservancy workers are
temporary workers
Traffic and Congestion at major road junctions in the city area, e.g. Sailana
Transportation road junction, Javara road crossing (Gulmohar Chauk) and Do batti,
Daat ki pool area.
Encroachments at the commercial areas causing the congestion at
major market places like Chandani chauk, Ghas Bazar.
Congestion at the major roads connecting to the city area, like
Indore road, Mahu road, Mandsaur Road and Nagda Road.
Most of the Slum areas do not have proper roads and connectivity.
Some of the roads are kuchha and result in water logging.
Illegal bus stands at Sailana and Javra roads due lack of space
availability.
Signals at the major junctions are not in operational stage.
Urban Poverty Documentation of slums has been done and IHSDP project report
And Slums has been prepared but it has not been approved yet.
Direct Household water connection coverage is less leading to the
illegal connections hence accounting to the Non-revenue Water.
Sanitation facility in slum area is very deprived affecting the health
of the urban poor of the Ratlam.
City economic Lack of diversified economy. Absence of employment generating
Development activities
Increasing poverty level and slums
Inadequate and sub-standard urban infrastructure and services
likely to discourage opportunities for future economic development
Urban Waste management is not as per SWM handling rules causing
Environment pollution.
Recreational spaces are inadequate
Public health is under threat due to absence of infrastructure
facilities related to the pandemic disease.
Depletion of drinking water sources
Municipal Cost recovery is only 69% for water supply services and for other
Finance services it is 8% in the year 2008-09.
The operational expenses in terms of energy expenditure for water
supply are very high and there is need to have energy auditing for
the pumps provided for the water supply.
There is need to revise the water pricing for the water supply
services of the Ratlam.
Also there is need to levy the separate tax for municipal solid waste
management services as the administration and overall operational
expenditure are maximum as compared to the other departments.
There is need to assess the properties in order to register the entire
properties under the Ratlam Municipal corporation.
Grants and transfers account for about 65% of the total revenue
while municipal taxes account for only 18% of the total revenue for
the year 2008-09. The share of municipal taxes to the total income
need to be improved.
Capital expenditure is skewed towards road and water supply works
and other infrastructure services requiring investments need to be
considered.
Salary accounts for 40% of the total revenue expenditure and the
same need to be curtailed in the coming years.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 101
City Development Plan, Ratlam
Consultancy Division
P a g e | 102 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 103
City Development Plan, Ratlam
14.1 Barcelona
No one can survive merely by conservation. If there is no new construction,
the city cannot stand; not even the old will endure. Each city must find its own
formula for combining existing symbols with new ones. Without the latter,
antiquity becomes mere repetition.
Pasqual Maragall, Mayor of Barcelona 1982-97
Barcelona is now widely recognized as one of the most successful cities in the
world, internationally acclaimed for its innovative urban planning. It has
survived the economic, environmental and social changes of the last decades
by focusing on the provision of knowledge-based and information services to
place itself in the forefront of a new urban wave, in which city planning
provides high-quality opportunities for people to live and work. In short,
Barcelona has been transformed into a city that provides a highly impressive
urban environment to all those who visit it.
The foundation for Barcelona's transformation has been the city's Eixample
District, a garden city expansion of 520 street blocks planned as long ago as
1859. Its high quality architecture, egalitarian design and ease of access have
stood the test of time and it provides the model for modern city developments
today.
Consultancy Division
P a g e | 104 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
14.2 Chandigarh
The Union Territory of Chandigarh has a total area of 114 sq. kms and has
witnessed decennial population growth (1991-2001) of 44.33%. It had a
population of 9, 00,914 in the last census. Chandigarh is unique, because it is
the capital of two state governments, Punjab and Haryana. Chandigarh is a
planned city, with a high standard of civic amenities.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 105
City Development Plan, Ratlam
Chandigarh's
infrastructure was
originally planned
for a population of
5 lakh, but the city
has expanded
rapidly over the
last three decades
and faces problems
common to other
growing cities in
India, including the
proliferation of
slums and squatter
settlements. Despite these problems, Chandigarh ranks first in India in the
Human Development Index, quality of life and e-readiness.
Keeping in view the need for the investment of investible surplus, a number of
major initiatives were undertaken to upgrade the infrastructure in Chandigarh
to boost economic growth in the region. Chandigarh is emerging as a regional
hub in the areas of service industry, education, health, information technology,
food and vegetable processing etc. Chandigarhs plan clearly focuses on the
targets and objectives contained in the National Common Minimum
Programme.
Chandigarhs economy is changing in character as the knowledge revolution
sweeps the country. In the last decade, the traditional industrial activity has
not seen that rapid an increase as was seen in the activities relating to the
services sector.
Right from the day the foundation of the city was laid in 1952, the
Administration has been successful in transforming this city into a world class
city, which can be depicted by the following Fact File:
Number 1 in the country in terms of Human Development Index
Chandigarh has been rated as the Wealthiest City of India. In terms of
family wealth, it was rated as the sixth most prosperous city.
Good Governance- A compact, efficient Administration having Quick Decision
making system
Bank Deposits- USD 4 billion with 227 branches
Education: Seat of the prestigious Punjab University from where 145 Ph.D
pass out in various disciplines, with 2 prestigious Engineering Colleges with
400 Engineers passing out every year. PGI ME&R- Prestigious Medical
Research Institute of the country is situated in this city. Apart from various
Colleges in the Science, Commerce and Humanities fields, 1 Architecture
College and one College of Fine Arts add to the high value education
institutes of the city.
Health: 5 large Government Hospitals in the City; PGI, General Multi-
Speciality Hospital, General Medical College & Hospital, One Hospital each in
Consultancy Division
P a g e | 106 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
the field of Homeopathy & Ayurveda. Apart from these, there are various
other Hospitals in the private sector.
Research Institutes: IMTECH, CSIO, NIPER all add to the value added
Research facilities provided by the city.
Gross Domestic Product (GDP) grew at 16.06% in the year 2004-05 against
all India GDP growth of 8.2%.
Rajiv Gandhi Chandigarh Technology Park (RGCTP) has been conceived with
the idea of creating employment and it is expected that once RGCTP is
completed more than 25000 professionals would be working here. Already
4500 professionals are working in RGCTP at present. As a natural corollary to
creation of a single job in the IT sector, 3 other indirect jobs are created and as
such 15000 jobs were created indirectly.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 107
City Development Plan, Ratlam
Consultancy Division
P a g e | 108 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
A new state of the art Education City is expected to come up, which will have
world class educational faculty and excellent infrastructure.
Punjab Engineering College (PEC) which is an autonomous deemed University
will be soon upgraded to IIT status, enabling delivery of more value added
education.
It is proposed to set up an IIM-level Management Institute and a branch of
the National Institute of Design in the city
Partnership with private sector is being explored for providing IT education to
young students. Infosys has already launched the programme Catch Them
Young whereby entrance test is conducted in all the schools of the city and
the students selected are given free of cost in-house training in Infosys. Intel
Learn is providing IT education to teachers of Government schools, which will
in turn provide IT education in the rural areas. The Administration is also in
the process of upgrading select Government schools as Smart Schools,
where IT programmes would be launched for the betterment of school going
children.
C-TOSS, a programme for upgrading the soft skills for urban and rural areas
enhancing employability of students under PPP model is being considered by
the Administration.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 109
City Development Plan, Ratlam
Consultancy Division
P a g e | 110 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Chandigarhs plan clearly focuses on the target and objectives contained in the
National Common Minimum Programme. The Administration is aiming at three
areas i.e. Human Development, Infrastructure, and Environment Upgradation &
Protection. Despite facing many challenges, Chandigarh Administration is
constantly working towards improving the quality of life of the residents and
preserving the unique character of the city of Chandigarh.
Development Infrastructure
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 111
City Development Plan, Ratlam
in lieu of this land. This will augment the physical connectivity of Chandigarh
to the world and fulfill a long term need and considerably enhance export
potential of the region.
Nehru Centre for Performing Arts is being set up in Sector 34, Chandigarh
which will also have the facility of an International Convention Centre and
theatres.
Rejuvenation of the City Centre in Sector 17 is being undertaken by provision
of multi level parking, relaying of the floors of main plaza, provisioning of
tourist information centre etc.
Completion of Sub City Centre in Sector 34 will further boost the commercial
activity of the city.
Botanical Garden is being developed on an area of 178 acres in village
Sarangpur, which will consist of 15 botanical sections and other features to
promote eco tourism.
Second state library is being completed in Sector 34.
14.3 Surat
The city of Surat is located in southern Gujarat, on the banks of the river Tapi.
It is Indias twelfth most-populous city. As in all cities, the rapid growth of
population and urbanization resulted in the growth of slums, garbage, and
overflowing drains. The situation would have been taken for granted had Surat
not been struck by an outbreak of pneumonic plague in September 1994. The
city, till then famous for its diamond merchants, came into the news for the
wrong reasons. The plague became an issue of global concern. Close to 200
deaths were linked to the outbreak. The disease created widespread panic and
led to a mass exodus from the city.
Apart from the human tragedy, it was a severe blow to not only Surats
economy which suffered a loss of several million rupees every day, but also to
the nations economy. The outbreak had an impact on industrial production,
tourism, export, and many other areas. International flights to India were
temporarily suspended, and export of food grains from Surat was banned.
The precipitating factor for the outbreak of plague in Surat was constant rain
which lashed the city for more than two months, and led to flooding and large-
scale water-logging in low-lying areas. The primary reason for this was the
faulty drainage system. Hundreds of cattle and other animals died due to flood
and water-logging. The floods, in fact, only brought to a crisis point, the
dangers inherent in inadequate waste management systems.
Consultancy Division
P a g e | 112 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 113
City Development Plan, Ratlam
It seems as routine exercise for them. It should be realized that effective billing
collection is the only source of revenue and cost recovery mechanism for the
provider. There is need for proactive attitude towards it. Ultimately it affects its
poor service level and hence further revenue reduction in terms of customer
accountability. Also ultimately it losses creditworthiness to the bankers and
affects the rise of capital for further investments.
Consultancy Division
P a g e | 114 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Outsourcing the billing and collection functions incentives for meter readers,
e.g. Employee Incentives in Hyderabad and Bangalore. Monthly and daily
targets are given, resolving customer grievances,
Also connecting poor populations are also the important strategy adopted by
the city of Bangalore through AusAID, and also they are getting revenues
through regular bill collection as poor population is ready to pay for safe and
reliable water services.
Credible disconnection policy adopted by Manila, Bangkok, Bangalore, and
Hyderabad cities for customers by warnings, legal notices, penalties and
disconnection.
One time settlement schemes for the customers who had huge arrears in their
bills. This was practiced in Hyderabad.
Hyderabad:
Consumers in Hyderabad today have the convenience of paying water bills
either through e-seva or through the Hyderabad Metro Water Supply and
Sewerage Boards collection counters. It is an e-governance initiative that
provides citizens with an easy and hassle-free way of paying their utility bills.
Currently, about 70 percent of the Boards water bills are received through e-
seva. Also there are integrated service delivery centres through e-seva which
provides customer with the objective of simplifying collection procedures by
providing citizens with a onestop shop for a variety of Government to Citizen
and Business to Citizen Services.
Bangalore:
In Bangalore, the water utility Bangalore Water Supply and Sewerage Board
has created customer conveniences where consumers can pay bills through a
variety of options such as water kiosks, Electronic Clearing Service systems,
and household e-banking facilities. It is one of the first cities in the country to
install 70 kiosks to help consumers pay their bills.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 115
City Development Plan, Ratlam
certain banks approved by the company or through 180 payment centres such
as.
A customer service call centre has also been set up for systematic customer
feedback process. The call centre normally receives an average of
approximately 1,400 calls per month for complaints including lack of water,
leaks, and billing queries.
Metropolitan Waterworks Authority is the municipal utility that serves 1.7
million customers in Bangkok. Bills are generated on a monthly basis and meter
readers have been appointed to read meters through the use of handheld
meter reading devices with portable printers, thus providing the facility of an
instant bill. This enables the customer to check the amount of water charges
right away after the meter has been read. The data are transmitted through
the handheld meter reading device to the Authoritys server. Once the meter is
read, the meter reader enters the data, checks the data entered, and then
prints an invoice for the customer. The invoice is checked to see if the
consumed water amount is different, that is, if it is more than 30 percent of a
three-month average. If it is not, the invoice is handed over to the consumer,
otherwise it is returned to the office for further investigation.
The Public Utilities Board is Singapores national water authority. Over the
years, it has shown impressive performance improvementsunaccounted-for
water of 4.8 percent, coverage of 100 percent, staff- connection ratio of only
2.95 per 1,000, and accounts receivable outstanding at less than one month.
One of the key areas of focus for improved commercial operations has been
billing and collection practices. The Board currently has approximately 1.2
million utility accounts (96 percent domestic and 4 percent non-domestic)all
accounts are metered. The meters used comply with ISO 4064/1 Class C
standards and are within 3 percent of accuracy. Domestic meters are placed at
the entrance of the house to facilitate easier accessibility for their reading and
maintenance. The Board has a meter workshop where regular maintenance,
including servicing, reconditioning, and testing of meters, is undertaken.
Consultancy Division
P a g e | 116 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
The DMA approach is a way to study problem affecting a large area by dividing
it into smaller ones. In a sense, it means breaking down a big network into
more numerous but smaller areas, the District Metered Areas. Then, for each
area the total net inflows and the volume of water billed are measured and the
NRW is calculated as the difference between the two figures. Once this is done,
areas where NRW levels are higher than desired are analyzed to determine the
appropriate solutions and implement them according to a prioritized program.
District metered area approach has been practiced in Jamshedpur and
Bangalore.
Water utilities will need to provide incentives their staff to undertake better
billing practices, not only checking for illegal or bypass connections but also for
connections with meter inaccuracies. Improving the metering practices by
replacing the old meters with the new ones, applying better technology for
collection of bills, 100% metering of supply areas even though some water
connections are authorized unbilled it is important to provide the meters so
that we can understand the actual consumption for that consumers. Also we
can provide bill copy to the consumers even though they are not liable to pay it
just to realize them amount of water they are consuming. Any non-revenue
water management program should ensure that incentives are aligned with the
objectives of developing an efficient and reliable service provider that meets
the needs of all consumers.
E.g. incentive-based performance contracts in Senegal, Uganda.
Approach to reducing and managing NRW goes beyond technical solutions.
Those are addressing the institutional, Organizational, and Regulatory
Arrangements for Creating a Suitable Environment for controlling NRW. E.g.
decentralizing service delivery in Haiphong, Vietnam, those involve technical
and administrative unbundling at ward level involving the community for
operation and maintenance. The ward level offices undertook meter reading,
maintenance and revenue collection once the network was rehabilitated and
established.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 117
City Development Plan, Ratlam
Consultancy Division
P a g e | 118 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
15 Stakeholders consultation
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 119
City Development Plan, Ratlam
Consultancy Division
P a g e | 120 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
1. The project which have been proposed under DMIC should be given due
importance and a development in line with the proposed projects should be
considered.
2. Importance of Stakeholders participation for the development of city.
Hon.Mayor
1. Need to find out different sources of water apart from the Dholawad Dam
scheme.
Suggestions from different stakeholders
1. The vacant land available within the District Hospital should be utilized for
a medical College.
2. The surrounding cities provide trade opportunities; also they bring different
sources of the revenue for Ratlam city. City should provide proper
connectivity to these regions through proper public transport services.
3. As future plans, Railway stations should be provided at Javra Road and
Pritam Nagar Proposal for Javra road and pritam nagar railway line coming
future plan expansion.
4. CDP should provide viable solutions for Heavy traffic and movement
management.
5. Include provision of parking facilities at various places in the CDP
6. Dedicated area demarcation for Organized Businesses. Sajjan Mill
compound and ITI ground could be possible options.
7. Proper connectivity should be provided between the nearby villages and
APMC market.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 121
City Development Plan, Ratlam
Consultancy Division
P a g e | 122 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 123
City Development Plan, Ratlam
Consultancy Division
P a g e | 124 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
During the third workshop stakeholders provided their opinions regarding the
key priority projects required for Ratlam city development.
Following suggestions provided from the key stakeholders during third
stakeholders workshop:
Dr.Rajesh Sharma, President, district congress committee Ratlam
Provision of commercial complexes in different parts of the city.
Generating awareness related to rain water harvesting and conservation
Provisions for resettlement of the encroached commercial and residential
properties
Mr.Jayant Vohra, President, Industrial Association
Development and support for small scale industrial activities.
Decongestion at Manek Chauk and Ram madir region
Ms.Yasmin Sherani, Councillor
Provision of tenure to the slum dwellers in Arjun Nagar and Dilip Nagar
Slum free and garbage free city planning
Mr.Pawan Somani, MIC memeber
Conservation of heritage structures.
Planning according to the population projection
Ms. Aditi Davesar, Councillor
City planning with environmental management and awareness programmes
for the same
Mr.Govind Kakani, MIC member
Provision of shopping complexes and commercial hubs at different part of the
city.
The proposal suggested by the stakeholders during third workshop has been
enclosed in the annexure of the report.
Figure 15-2 :second steering committee meeting
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 125
City Development Plan, Ratlam
Stakeholders present in 4th Workshop Stakeholders present in 4th Workshop
Consultancy Division
P a g e | 126 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Consultants Presenting to Stakeholders
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 127
City Development Plan, Ratlam
Consultants from Darashaw & Co. presented the projects and costing for
Ratlam City Development in presence of Steering committee members. The
consultants discussed required reforms and action plan about all infrastructure
developments. Reforms for development and funding contain three major
scenarios, Base Case Reform, Full Reforms and Partial Reforms which were fully
discussed by consultants. The consultants explained this on the basis of Capital
investment plan, phasing and prioritization of projects and Financial Operating
Plan to sustain the finances of Municipal Corporation.
Mr. Pawan Somani, MIC Member inquired about provision and costing of Strom
water drainage. In response of his query, consultant cleared all related
identified projects and costing for provisions.
The steering group members found the consultants report satisfactory and
acceptable for the Finalisation of Ratlam City Development Plan.
Attendance sheet for the Steering Group Meeting has been included in the
annexure.
Consultancy Division
P a g e | 128 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 129
City Development Plan, Ratlam
City Vision
This vision would drive the development of Ratlam as the destination of choice
for all who want to invest, work and live, in and around the State of Madhya
Pradesh. The sustainability of the city is based on a concrete plan of actions
with the required proof points to aid and maintain credibility.
The citys vision will deliver state-of-the-art infrastructure and processes that
will redefine and showcase new standards around the globe. Seamless
integration of this infrastructure and advanced technology with business and
public services will create a community that is totally self-supporting and
accessible to all.
Consultancy Division
P a g e | 130 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
To ensure adequate, safe and treated water supply to all the citizens of
Ratlam.
the basis of number of households and the registered connections. Hence the
coverage has been estimated on the basis of direct water supply connection.
However in many parts of the city corporation have provided handpumps and
tubewells for the purpose of drinking water supply.
Considering the above challenges, the following goals for different horizon
years have been identified in the following table.
Table 16-2: Goals & Service Outcomes for Different Horizon Years
Sr. Horizon Period
Component
No. 2015 2020 2025
1 Network Coverage 100% 100% 100%
2 Extent of metering - 100% 100%
3 Per Capita Supply 135 135 135
4 Hours of Supply 4 hours daily 24 hours daily 24 hours daily
5 24x7 Water Supply - 49 wards -
As per WHO / As per WHO / As per WHO /
6 Quality of Water CPHEEO CPHEEO CPHEEO
Standards Standards Standards
7 Non Revenue Water 15% 15% 15%
Strategies
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 131
City Development Plan, Ratlam
O & M maintenance plan can be prepared for regular routine system with
consideration of emergency maintenance situations.
Tariff revision: in order to achieve O & M cost recovery, Ratlam Municipal
Corporation has to adopt the phase wise tariff revision policy with less
political intervention.
Water auditing and awareness campaign:
Water auditing may involve the leak detection studies apart from systems on
quality and quantity of water drawl at consumer end which will help to
achieve the effective water supply system.
Apart from the technical provisions, ULB need to broaden the awareness
campaign to reduce the illegal connections and water losses.
Streamlining institutional responsibilities:
Development of Information management system for Asset records and
management of water supply system.
Provision of Effective customer grievance system with innovative and
effective redressal provisions in the forms of online complaint services,
Water Adalats etc.
Rainwater harvesting:
Ratlam Municipal Corporation has already mandated the rain water
harvesting system for all new construction development under its
jurisdiction.
To enhance the coverage of safe sanitation facilities, following goals have been
identified for different horizon years.
Table 16-3: Goals & Service Outcomes for Different Horizon Years
Sr. Horizon Period
Component
No. 2015 2020 2025
1 Network Coverage (Access) 80% 100% 100%
2 Treatment and Disposal 100% 100%
3 Recycle and Reuse 20% 20%
4 Recovery of O&M Costs 100% 100% 100%
Consultancy Division
P a g e | 132 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 133
City Development Plan, Ratlam
Strategies
Consultancy Division
P a g e | 134 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Table 16-5: Goals & Service Outcomes for Different Horizon Years
Sr. Horizon Period
Component
No. 2015 2020 2025
Coverage of storm water
1 80% 100% 100%
drainage
2 Incidence of water logging Zero Zero Zero
Strategies
Infrastructure refurbishment and augmentation
Provision of stormwater drainage network
Nallah restructuring with de-silting and alignment of existing drains.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 135
City Development Plan, Ratlam
Table 16-6: Goals & Service Outcomes for Different Horizon Years
Sr. Horizon Period
Component
No. 2015 2020 2025
1 Road network as a % of total area 10% 15% 15%
2 Share of Public Transport 50% 75% 100%
Traffic Management with signal
3 100% 100% 100%
provisions
Sidewalks length to Total 50% of the 75% of the 100% of the
4
road length requirement requirement requirement
25% of the 60% of the 100% of the
5 Effective Parking policies
requirement requirement requirement
Consultancy Division
P a g e | 136 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Strategies
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 137
City Development Plan, Ratlam
Community empowerment
Linking livelihoods to citys economy
Development of housing through partnerships PPP
Formulation of Notification and Denotification Policy
Consultancy Division
P a g e | 138 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
To ensure green, safe and livable city for present and future generations.
headquarters has been attracting work force population throughout years. But
this uneven rise in emigrant population has resulted in haphazard and
unplanned growth of the City. The formation of Ratlam Development authority
would provide the much needed impetus in planned growth management of the
city. The sectoral vision for Ratlam is To ensure green, safe and livable city for
present and future generations.
As part of total City Development Programme, other sectors apart from the
above mentioned core sectors have been identified and vision and strategies
have been assigned. These are as follows:
Housing
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 139
City Development Plan, Ratlam
Economic Development
Strategies
Strategies
Initiate and implement e-governance in first phase i.e within the year
2015.
Capacity building through training programmes to improve efficiency and
accountability in the service delivery.
Property mapping of the existing development and updation from time to
time. GIS mapping of properties for registration and assessment process.
GIS mapping of infrastructure services like water supply, Underground
sewer services after its implementation.
Urban Finance
Table 16-7: Goals & Service Outcomes for Different Horizon Years
Sr. Horizon Period
Component
No. 2015 2020 2025
Collection efficiency of
1 80 100% 100%
property tax
2 Dependancy on Grant 50% 30% 10%
Consultancy Division
P a g e | 140 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Strategies
Strategies
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 141
City Development Plan, Ratlam
The capital investment plan has been designed for next 30 years but projects
have been prioritized for the next 15 years and accordingly the financial
operating plan has been prepared in order to sustain the capital investment
occurred during the period.
The demand assessment has been done to identify the requirements with the
projected population till the year 2040. Accordingly the capital investment plan
for next 15 years with project prioritization has been provided with the financial
operating plan which has been provided in the next chapter. For physical and
social infrastructure sectors, the projects have been identified on rationale of
infrastructure augmentation and refurbishment.
The stakeholders workshops and focus group discussions have been conducted
at different stages of the CDP process. Stakeholder provided their suggestion
and accordingly projects have been incorporated in the City Development Plan.
Stakeholders suggested that the project identification should be such that it
will provide the inclusive development with focus on the urban poor.
Projects identified
Following projects have been identified to strengthen the existing water supply
system:
Implementation of proposed water supply scheme under UIDSSMT:
It includes the construction of water treatment plant with overall capacity of
60.5 MLD. It has been provided into two phases of 15 years with 24.5 MLD in
the first phase till 2025 and 36 MLD in the second phase to cater the demand
till the year 2040.
Consultancy Division
P a g e | 142 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Following table provides the information on the capital investment required for
water supply sector of Ratlam.
Table 17-1: Capital Investment required for water supply Rs. In Lakhs
Estimated Estimated
Sr.
Project list Cost Cost for
No
for 2025 2040
Construction of WTP of 24.5 MLD for 2025 before
2015 for 1st Phase (Under construction in UIDSSMT
1 scheme) 3265.10 Lakhs 0.00 0.00
Provision of WTP of 36 MLD for 2040 after 2025-
2 2026 and before 2030 for 2nd phase 0.00 900.00
Provision of raw water pumping main of 800mm dia
of 13km form Source to WTP during 2025-2030 for
3 2nd phase 0.00 1880.00
Provision of clear water pumping main of 800mm dia
of 8km form WTP to Ratlam city during 2025-2030
4 for 2nd phase 0.00 1157.00
provision of water distribution lines of 363 km during
5 2011-2015 for 100% coverage 13090.00 13090.00
provision of water distribution lines of 29 km during
6 2016-2020 830.00 830.00
provision of water distribution lines of 30 km during
7 2021-25 858.00 858.00
provision of water distribution lines of 32 km during
8 2026-2030 0.00 915.00
provision of water distribution lines of 33 km during
9 2031-2035 0.00 944.00
provision of water distribution lines of 35 km during
10 2036-2040 0.00 1001.00
11 provision of 54081 nos of meters during 2011-2015 811.22 811.22
12 provision of 3830 nos of meters during 2016-2020 57.45 57.45
13 provision of 4034 nos of meters during 2021-2025 60.51 60.51
14 provision of 4237 nos of meters during 2026-2030 0.00 63.56
15 provision of 4441 nos of meters during 2031-2035 0.00 66.62
16 provision of 4645 nos of meters during 2039-2040 0.00 69.68
energy auditing of pumps at regular interval ( 5
17 years) 28.00 58.00
18 utility mapping using GIS 40.09 49.59
Total for Water Supply Works 15775.27 22811.61
Source: Analysis from the consultants
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 143
City Development Plan, Ratlam
Projects identified
The following projects have been identified for waste water services in Ratlam.
Comprehensive underground sewer service which will consist of
In order to facilitate sewer services, entire city can be divided into two zones
taking into consideration of topography and railway line passing through the
city. Provision of two sewage treatment plants with capacity of 32 MLD and 12
MLD respectively in order to cater demand till the year 2040. In order to
facilitate sewer services, entire city can be divided into two zones taking into
consideration of topography and railway line passing through the city.
Provision of underground sewer network in order to provide the household
level sewer connection
Utility mapping using GIS
Purchasing sullage lorry
Rehabilitation and development of existing community toilets
Provision of community toilets at Sheranipura ward no.36 (six no.) ward
no.29, Bhaktan ki Bawdi, Manek Chowk, Sabji mandi etc
65 Nos. of community toilets estimated for other slum areas.
Following table provides the information on the capital investment required for
waste water sector of Ratlam.
Table 17-2: Capital Investment required for waste water services
Sr. Estimated Cost Estimated
Project list
No, for 2025 Cost for 2040
Construction of STP of 32 MLD for zone-1
1 before 2015-16 for the year 2040. 2560.00 2560.00
construction of STP of 12 MLD for zone-2
2 before 2015-16 for the year 2040 960.00 960.00
provision of sewerage network of 345km with
3 80% coverage during 2010-2015 13310.00 13310.00
provision of sewerage network of 24.5 km to
4 achieve 100% during 2016-2020 861.00 861.00
provision of sewerage network of 26.0 km to
5 achieve 100% during 2021-2025 910.00 910.00
provision of sewerage network of 27.0 km to
6 achieve 100% during 2026-2030 0.00 935.00
provision of sewerage network of 29.0 km to
7 achieve 100% during 2031-35 0.00 1000.00
provision of sewerage network of 30.0 km to
8 achieve 100% during 2036-2040 0.00 1033.00
9 purchasing sullage lorry for waste collection 10.00 10.00
10 utility mapping using GIS 39.55 48.15
Total for Sewerage Schemes 18650.55 21627.15
Consultancy Division
P a g e | 144 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Projects identified
Ratlam Municipal Corporation has already prepared the DPR for upgradations
of nallah with channelization with cement concrete lining.
Apart from nallah upgradation, provision of drainage network has been
incorporated for priority actions in the city investment plan.
There has been proposal for Provision of storm water drainage network across
the city in order to provided proper drainage network as well as to avoid
water logging in the flood prone areas
Projects identified
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 145
City Development Plan, Ratlam
Consultancy Division
P a g e | 146 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Estimated Estimated
Sr.
Project list Cost Cost for
No,
for 2025 2040
provision of refuse compactor wheely bins of 1100
14 0.00 3.00
litres 20 nos till 2040-41
provision of refuse compactor wheely bins of 600
15 13.00 13.00
litres with 130 nos till 2015-16
provision of refuse compactor wheely bins of 600
16 1.00 1.00
litres with 10 nos till 2020-21
provision of refuse compactor wheely bins of 600
17 1.00 1.00
litres with 10 nos till 2025-26
provision of refuse compactor wheely bins of 600
18 0.00 1.50
litres with 15 nos till 2030-31
provision of refuse compactor wheely bins of 600
19 0.00 1.50
litres with 15 nos till 2035-363
provision of refuse compactor wheely bins of 600
20 0.00 2.00
litres with 20 nos till 2040-41
provision of 4.5 m3 dumper placer container for bulk
21 6.80 6.80
storage 8 nos till 2015
provision of 4.5 m3 dumper placer container for bulk
22 0.85 0.85
storage 1 nos till 2025-26
provision of 4.5 m3 dumper placer container for bulk
23 0.00 1.70
storage 2 nos till 2035-36
provision of 4.5 m3 dumper placer container for bulk
24 0.00 1.70
storage 2 nos till 2040-41
provision of construction and demolition of waste
25 storage container with capacity of 7.5 m3 of 2 nos 2.60 2.60
by 2015-16
provision of construction and demolition of waste
26 storage container with capacity of 7.5 m3 of one nos 1.30 1.30
by 2025-26
provision of protective gears 1034 nos once in 2
27 253.33 542.85
years
Total for Solid Waste Management Schemes 3929.26 4241.28
Source: Analysis from the consultants
Projects identified
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 147
City Development Plan, Ratlam
Following table provides the information on the capital investment required for
roads and transportation of Ratlam.
Table 17-5: Capital Investment required for Roads and transportation
Sr Estimated Estimate
N Project list Cost d Cost
o for 2025 for 2040
1 construction of new roads of 208 km till 2015-16 6240.00 6240.00
2 construction of new roads of 29 km between 2016 to 2020 870.00 870.00
3 construction of new roads of 31 km between 2021 to 2025 930.00 930.00
4 construction of new roads of 32 km between 2026 to 2030 0.00 960.00
5 construction of new roads of 34 km between 2031 to 2035 0.00 1020.00
6 construction of new roads of 35 km between 2036 to 2040 0.00 1050.00
relaying of existing roads ( considering 50% roads are cc
7 roads) of 99 km length till 2015-16 396.00 396.00
8 relaying of existing roads of 217 km length till 2020-21 868.00 868.00
9 relaying of existing roads of 233 km length till 2025-26 932.00 932.00
10 relaying of existing roads of 248 km length till 2030-31 0.00 992.00
11 relaying of existing roads of 265 km length till 2035-36 0.00 1060.00
12 relaying of existing roads of 282 km length till 2040-41 0.00 1128.00
13 road widening in central commercial regions 100.00 100.00
14 provision of parking spaces on PPP basis 40.00 40.00
construction of bust stand on Mhau-Nimach road on PPP
15 basis 50.00 50.00
provision of pick up station at Jawra Fatak, Sailana Over
16 bridge, Forest office (Bajna Road) 10.00 10.00
16646.0
Total for Roads & Transportation Facilities 10436.00 0
Source: Analysis from the consultants
Projects identified
Consultancy Division
P a g e | 148 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Following table provides the information on the capital investment required for
street lighting of Ratlam.
Table 17-6: Capital Investment required for street lighting
Estimated Estimated
Sr.
Project list Cost Cost for
No
for 2025 2040
replacing of existing tube lights with 6570 nos energy
1 saving lights (28W T5 Lamps) by 2015-16 78.84 78.84
provision of additional energy efficient street lights
2 6244 nos by 2015-16 74.93 74.93
provision of additional energy efficient street lights
3 957 nos by 2020-21 11.48 11.48
provision of additional energy efficient street lights
4 1008 nos by 2025-26 12.10 12.10
provision of additional energy efficient street lights
5 1059 nos by 2030-31 0.00 12.71
provision of additional energy efficient street lights
6 1110 nos by 2035-36 0.00 13.32
provision of additional energy efficient street lights
7 1161 nos by 2040-41 0.00 13.93
Total for Street Lights 177.35 217.31
Source: Analysis from the consultants
Projects identified
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 149
City Development Plan, Ratlam
Projects identified
Following table provides the information on the capital investment required for
socio-economic infrastructure of Ratlam.
Consultancy Division
P a g e | 150 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Projects identified
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 151
City Development Plan, Ratlam
There have been unidentified and neglected heritage sites within the Ratlam
city area which need to be listed for heritage conservation in order to restore
the heritage richness of the city. There is need for detailed project report for
identification of heritage sites and action plan for the same.
Projects identified
However in order to cover the entire slum areas under the municipal
corporation jurisdiction, the urban local body can implement the Rajiv Awas
Yogana for urban poor in Ratlam. As mentioned in the sectoral analysis, the
IHSDP report of RMC has been rejected by state government due to lack of
data and other applicable issues in the report. In order to provide the services
at micro level and to assess the funds as well as technical assistance from
central and state government Rajiv Awas Yogana (RAY) for slum free city
planning will be constructive approach for urban local body.
Following projects have been proposed under urban poor sector of Ratlam:
Rajiv Awas Yogana for Slum Free City Planning
Provision of community toilets at wards no.39, ward no.1 and Chandani Chauk
region. (As per stakeholders requirement)
Provision of 65 nos. of community toilets in the slum regions (estimated under
slum analysis)
Consultancy Division
P a g e | 152 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Following table provides the information on the capital investment required for
urban poor of Ratlam.
Table 17-11: Capital Investment required for Urban Poor
Estimated Estimated
Sr.
Project list Cost Cost for
No
for 2025 2040
1 slum free city planning like Rajiv Awas Yogna etc 6070.80 6070.80
provision of public toilets public toiltes at chandani
chauk (1 nos), sherani pura slum area (6 nos), ward
no.39 Dalu moti bazar (1 nos), Ward no.29 Bhaktan ki
2 Bawdi (1 nos), 9.00 9.00
3 provision of community toilets in slum regions (65 nos) 65.00 65.00
Total for Service to Urban poor 6144.80 6144.80
Projects identified
Following table provides the information on the capital investment required for
urban governance and institutional development of Ratlam.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 153
City Development Plan, Ratlam
The costing for the projects identified above has been included in each of the
sector respectively.
Consultancy Division
P a g e | 154 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Following table provides the priority listing of the projects in accordance with
the sectors.
Table 17-13: Prioritized City Investment for Ratlam
Investment
Sr.No. Sector wise investment for first phase without inflation
in Rs.lakh
1 water supply 15775.26
2 sewer services 18650.55
3 storm water drainage 13565
4 solid waste management 3929.26
5 roads and transportation 104.36
6 street lights 177.35
7 Industries and economic development 45.00
8 Socio-Economic Infrastructure 370
9 Environment Protection and Management 1821.50
10 Urban Heritage 20.00
11 services to urban poor 6144.80
12 Urban Governance and institutional development 75.00
Total 71009.72
The water supply sector has been given Figure 17-1 : Capital Investment Rs.in Lakhs
the top most priority in order to achieve
Investment in Rs.lakh
the source augmentation and provide
100% household coverage to the citizens Services to urban
Environment
of Ratlam. Municipal Solid Waste has
poor
Protection, 9%
Management
been prioritized followed by the water 3% Water supply
22%
supply sector in such away that Ratlam Socio-Economic
Infrastructure
municipal corporation will follow the 1%
to restrict the further slum formation in the city may be because of immigration or
lack of economic development within the city. The underground sewer and drainage
services can be followed after urban poor sector, which may require high capital
investments but required to be implementation subsequently in order to achieve
proper sanitation services for the city. After following the physical infrastructure
prioritization of social infrastructure can be given in terms of provision for
recreational spaces, lake development etc. At last but not the least the institutional
strengthening and capacity building is very important aspects in terms of
recruitment of skilled staff and training to the existing employees in order to
improve the efficiency in service delivery.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 155
City Development Plan, Ratlam
Projects identified
Apart from the above projects, following projects of the Capital investment plan
have been proposed under public private partnership.
Table 17-14: Prioritized projects under PPP
Sr. ESTIMATED
TYPE OF PROJECT UNDER PPP
No COST RS.LAKHS
1 Total for Solid Waste Management Schemes 4241.28
2 provision of parking spaces on PPP basis 40.00
3 construction of bust stand on Mhau-Nimach road on PPP basis 50.00
4 construction of two recreation parks for RMC on PPP basis 100.00
Development of vegetable market at Manek Chauk on PPP
5 50.00
basis
6 Redevelopment of Library on PPP basis 15.00
7 Development of Amrut Sagar Lake on PPP basis 1400.00
8 Development of Barbad lake on PPP 371.50
Development of public gardens (can be taken on PPP)
9 20.00
Kalika mata garden and Amrut Sagar garden
Total under Public Private Partnership 6287.78
PPP projects for the implementation period (2010-2025) 5975.76
Source: Analysis from the consultants
Consultancy Division
P a g e | 156 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
18.1 Overview
Urban reforms are the main focus of good governance and service delivery to
the inhabitants of the urban area. Several initiatives and reforms have been
taken up at the national level and state level. These reforms need to be
replicated and implemented by the ULBs completely in a time bound manner.
Under the Urban Local Bodies level, reforms viz., E-Governance, shift to Accrual
based double entry accounting, property tax reforms should be proposed to be
achieved by 2015. The 100% cost recovery for water supply and solid waste
services have been proposed to achieved in the year 2020-21. Internal
earmarking of funds for services to Urban Poor and provision of Basic services
to urban poor should be planned to be achieved in the year 2021. Public Private
Partnership should be encouraged through outsourcing in solid waste
management, street light maintenance, STP maintenance and hiring of
vehicles. Few of the suggested reforms have been implemented to some extent
though at the ULB level further refinement and qualitative implementation
needs to be carried out.
Implementation of Reforms is critical for achieving self sustainability for the
ULB and hence mandatory and optional reforms need to be implemented in a
phased manner within the scheme period. Some of the reform initiatives are
already underway in the ULB with assistance from the State Government. The
present status of the reforms is elaborated in this chapter.
Financial Reforms:
As a part of financial reforms, tax mobilization reforms in tax and non tax
collection needs to be taken up for improving the financial position of the
Corporation. The reform process of tax collection should be comprehensive and
should focus on structural and systematic changes so that the increase in
efficiency is sustained. This is vital for achieving self-sufficiency and improving
its financial health to make it possible for the ULB to undertake various projects
for the welfare of the people.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 157
City Development Plan, Ratlam
Consultancy Division
P a g e | 158 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 159
City Development Plan, Ratlam
Consultancy Division
P a g e | 160 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
should provide the necessary support in order to bring the capacity building for
the Ratlam Municipal Corporation.
It is recommended that the periodicity of the training shall be coupled with
more qualitative in-depth focus on the type of training offered. This would
result in increased awareness among the administrative staff on various issues
there by enhancing their productivity and creating awareness about their
responsibility towards the public. For both elected and administrative members
educational and awareness tours can be organized to understand the best
practices in various services of other ULBs.
Source: Framework for effective consumer grievance redressal system, MOUD, GOI
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 161
City Development Plan, Ratlam
Consultancy Division
P a g e | 162 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Currently only property tax is the only direct income for Ratlam municipal
Corporation. The water tax is collected only from the bulk supply through
tankers to several parts of the city. For implementing the new project there will
be necessary to revise the user charges for the respective services, in order to
sustain and maintain the operation of the services.
In the light of the above limitations, the ULB needs to explore the option of
introducing user charges in other areas too. For the proposed UGD collection of
user charges for meeting O & M expenses becomes imperative. Some of the
suggested areas are user charges from commercial entities and institutions for
solid waste management to be extended to residential areas in phases after
proper awareness is created at all levels.
18.5.5 E-governance:
E-governance is the application of information & communication technologies to
transform the efficiency, effectiveness, transparency and accountability of
informational & transactional exchanges with in government, between govt. &
govt. agencies of National, State, Municipal & Local levels, citizen & businesses,
and to empower citizens through access & use of information.
At ULB level, an e-governance shall serve the following three basic
requirements in a user friendly manner
Information to the office bearers for their effective discharges of their duties,
safeguard the assets of the Corporation and for future planning and
development of their city.
Information to councilors to do effective service delivery to their constituents.
Information to public to pay their duty, update the information on assessment
and to get the right services of the ULB in time.
Present Status:
Unlike other municipal corporations of Bhopal, Gwalior and Indore, Ratlam
municipal corporation doest not have its website for the provision of the
information and e-governance services to the citizens.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 163
City Development Plan, Ratlam
Figure 18-3: Possible approach of the Reforms for the User charges.
Consultancy Division
P a g e | 164 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
E Governance
Computerisation of all
records and departments
Computerisation of Records No Computerisation. to be taken up. Staff to be
trained. Even accounts are
not computerized.
Considering the low level
E-Procurement Nil of personal computer
penetration and internet
users in Ratlam, E
procurement and online bill
payment can be
Online payment of bills Nil considered for long term
goals.
Accounting Reforms
Valuation of assets and Need to be taken up as
Nil
liabilities immediate priority.
Migration to double entry
shall be taken up as short
Migration to Double Entry
term goal with plan for
Accounting System
implementation within the
next five years.
Revamp of the Public
Assistance and training to
Financial Management
Nil be provided by the state
(PFM) cycle, which includes
government.
internal controls
Financial Management
Review of Rentals from
Municipal Properties and Assistance and training to
Fees for various services in Nil be provided by the state
line with the prevailing government.
market rates
Assistance and training to
Monitor and Control of
Nil be provided by the state
Revenue Expenditure
government.
Prioritisation of expenditure Assistance and training to
on capital works in line with Nil be provided by the state
the infrastructure needs of government.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 165
City Development Plan, Ratlam
Consultancy Division
P a g e | 166 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
The Financial Operating Plan (FOP) assesses the financial strength of the
Corporation to implement the identified projects. The Financial Operating Plan
(FOP) will forecast the municipal finances on the basis of certain assumptions
on income and expenditure. The primary objective of the FOP is to ascertain
the investment sustenance capacity of the corporation to undertake various
projects. There are three scenarios created for financial operating plan. They
are as follows:
Base case scenario: All the projected implemented without any reforms and
financial projection done on the basis of past growth rate of the taxes.
Partial reforms: Projects implemented with partial reforms in certain sectors
like property tax, water tax and other services.
Full reforms scenarios: projects implementation with realization of all the
reforms and iterated against the revenue income and the expenditure pattern
of Municipal Corporation.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 167
City Development Plan, Ratlam
Consultancy Division
P a g e | 168 Darashaw & Company Pvt Ltd.
Table 19-2: Financial statements under no reforms scenario
2008 2010 2011 2012 2013 2015 2016 2017
No. Particulars 200506 200607 200708 09 200910 11 12 13 14 201415 16 17 18 201819 201920 202021 202122 202223 202324 202425
i Income
A MunicipalTaxesandrates
1 PropertyTax
a current 39.4 34.3 38.5 44.7 46.7 48.7 50.8 53.0 55.3 57.7 60.2 62.8 65.5 68.3 71.3 74.4 77.6 81.0 84.5 88.1
Consultancy Division
b arrears 51.5 75.4 75.2 77.9 81.8 85.9 90.2 94.7 99.4 104.4 109.6 115.1 120.9 126.9 133.2 139.9 146.9 154.2 162.0 170.1
2 propertytaxothers
3 CityDevelopmentCess 38.4 50.7 58.0 60.6 70.9 83.0 97.1 113.6 132.9 155.5 181.9 212.8 249.0 291.3 340.9 398.8 466.6 545.9 638.8 747.3
4 ConsolidatedTax 47.7 48.3 53.7 61.2 66.7 72.7 79.2 86.4 94.1 102.6 111.8 121.9 132.9 144.8 157.9 172.1 187.6 204.5 222.9 242.9
E Extraordinary(Suspense) 360.7 350.6 321.7 388.4 398.1 408.1 418.3 428.7 439.4 450.4 461.7 473.2 485.0 497.2 509.6 522.3 535.4 548.7 562.4 576.5
income
TotalIncome 2570.0 2675.2 3454.2 3423.1 3691.6 3986.4 4310.4 4666.5 5058.1 5488.9 5963.0 6485.2 7060.4 7694.4 8393.5 9164.6 10015.6 10955.3 11993.3 13140.5
P a g e | 169
City Development Plan, Ratlam
2008 2010 2011 2012 2013 2015 2016 2017
No. Particulars 200506 200607 200708 09 200910 11 12 13 14 201415 16 17 18 201819 201920 202021 202122 202223 202324 202425
ii Expenditure
P a g e | 170
1 Mission2009/08/07/06 107.3 61.3 29.4 128.6 136.6 145.1 154.1 163.7 173.9 184.7 196.2 208.4 221.3 235.1 249.7 265.2 281.7 299.3 317.9 337.6
Important
2 Vision2009/08/07/06 76.7 122.1 118.8 129.0 139.3 150.5 162.5 175.5 189.6 204.7 221.1 238.8 257.9 278.5 300.8 324.9 350.9 378.9 409.2 442.0
PublicWelfareworks
3 SalaryExpenses
A Establishmentexpenses( 821.9 867.6 1020.1 1130.1 1256.7 1397.5 1554.0 1728.1 1921.6 2136.9 2376.2 2642.4 2938.4 3267.5 3633.5 4040.5 4493.0 4996.3 5556.0 6178.3
Permanent)
B Establishmentexpenses( 123.5 130.4 157.8 172.0 192.0 214.5 239.5 267.5 298.7 333.6 372.6 416.1 464.7 518.9 579.5 647.2 722.8 807.2 901.4 1006.7
Temporary)
City Development Plan, Ratlam
4 Fuelexpenses(Diesel/ 33.7 49.8 50.4 45.2 49.9 55.1 60.8 67.0 73.9 81.6 90.0 99.3 109.5 120.9 133.3 147.1 162.3 179.0 197.5 217.9
Petrol)
5 Telephoneexpeses 5.1 5.4 4.0 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
6 Eletricityexpenses 336.3 288.1 355.6 461.2 512.4 569.3 632.5 702.7 780.7 867.4 963.7 1070.7 1189.5 1321.6 1468.3 1631.3 1812.4 2013.6 2237.1 2485.4
7 Differentsmallexpenses 3.9 7.4 5.0 4.2 4.4 4.5 4.6 4.7 4.8 5.0 5.1 5.2 5.4 5.5 5.7 5.8 6.0 6.1 6.3 6.4
8 Corporationoffice 6.1 8.8 4.4 8.4 8.8 9.2 9.7 10.2 10.7 11.2 11.8 12.4 13.0 13.7 14.3 15.1 15.8 16.6 17.4 18.3
9 Commissioneroffice 0.7 0.7 2.0 1.9 2.0 2.1 2.2 2.3 2.5 2.6 2.7 2.8 3.0 3.1 3.3 3.5 3.6 3.8 4.0 4.2
10 Accountsdepartment 43.8 38.3 65.8 49.0 50.8 52.7 54.7 56.8 58.9 61.1 63.4 65.8 68.2 70.8 73.5 76.2 79.1 82.1 85.2 88.4
11 Developmentdepartment 24.1 1.2 2.8 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4
12 Stores 16.0 17.1 22.7 9.9 9.9 9.9 9.9 9.9 9.9 9.9 9.9 9.9 9.9 9.9 9.9 9.9 9.9 9.9 9.9 9.9
13 Streetlights 41.2 23.7 17.1 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0
14 Pubilcworks 294.2 489.4 505.9 602.1 602.1 602.1 301.1 301.1 301.1 301.1 301.1 301.1 301.1 301.1 301.1 301.1 301.1 301.1 301.1 301.1
15 Waterworks 61.0 113.3 160.3 116.1 116.1 116.1 58.0 58.0 58.0 58.0 58.0 58.0 58.0 58.0 58.0 58.0 58.0 58.0 58.0 58.0
16 Workshop 6.8 20.1 9.0 5.6 6.1 6.6 7.1 7.7 8.3 8.9 9.7 10.4 11.3 12.2 13.1 14.2 15.3 16.5 17.9 19.3
17 PublicRelation 11.3 9.7 14.2 14.0 15.1 16.3 17.5 18.9 20.3 21.9 23.5 25.4 27.3 29.4 31.6 34.1 36.7 39.5 42.5 45.8
18 FinanceDepartment 1.0 1.0 2.0 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3
19 Taxcollection 0.3 0.3 0.4 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
Department
20 ExtraordinarySuspense 388.6 292.9 244.6 331.2 331.2 331.2 331.2 331.2 331.2 331.2 331.2 331.2 331.2 331.2 331.2 331.2 331.2 331.2 331.2 331.2
Expenses
21 loansandinterest 169.6 83.3 136.8 263.6 276.8 290.6 305.1 320.4 336.4 353.2 370.9 389.4 408.9 429.3 450.8 473.3 497.0 521.9 547.9 575.3
TotalExpenditure 2572.9 2631.8 2929.0 3497.6 3735.6 3998.5 3929.9 4251.0 4605.9 4998.3 5432.4 5912.6 6443.9 7032.0 7683.0 8403.8 9202.1 10086.3 11065.9 12151.2
Surplus/DeficitRsinlakhs 3.0 43.4 525.2 74.5 44.0 12.1 380.5 415.5 452.2 490.6 530.7 572.6 616.5 662.4 710.5 760.8 813.5 869.0 927.5 989.3
The administration expenses like Salary expenses for Corporation or, others in
administrative department, have been assumed to be growing at the CAGR of
11.20%.
Electricity expenses are growing at the rate of 11.10% hence it has been
projected with the same CAGR.
Other departmental expenses have been decreasing apart from the PWD and
water works. These have been considered same as of the last year i.e 2008-
09 as a base year.
The CAGR for the fuel expenses has been 10.3 % hence projected with the
same rate.
Under Public conveniences and facilities fire fighting and street lighting are
assumed the growth rate of 7% and 10% respectively as the financial
information is available only for two years.
Under Water Works Department, Purchases and Maintenance have been
assumed to be growing at 5%.
Table 19-3: Growth rate for revenue expenditure
Projected Growth
Particulars CAGR-(%)
Rates (%)
Establishment Expenses 11.2% 11%
Electricity Expenses 11.1% 11.10%
Public works 26.96% 0%
Water works 23.93% 0%
Accounts department 3.76% 3.76%
Public relation 7.66% 7.66%
Finance department -30.43% 0%
Tax collection department -4% 0%
Public relation 7.66% 7.66%
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 171
City Development Plan, Ratlam
Phasing of the identified projects is done based on demand supply gap analysis,
project prioritization based on stakeholder consultation and financial
sustainability for taking up the projects. The summary of capital costs for the
phase i.e 2011-12 to 2024-25 and the phasing is presented below:
Table 19-4: Capital Investment for first phase of Ratlam CDP
2010-11 2015-16 2020-21
to 2014- to 2019- to 2024-
Sector Total 15 20 25
water supply 15775.27 13945.70 900.21 929.36
sewer services 18650.55 16874.50 863.45 912.60
storm water drainage 13565.00 12040.00 742.00 783.00
solid waste management 3929.26 3773.51 76.80 78.95
roads and transportation 10436.00 6836.00 1738.00 1862.00
street lights 177.35 153.77 11.48 12.10
Industries and economic development 45.00 45.00 0.00 0.00
Socio-Economic Infrastructure 370.00 370.00 0.00 0.00
Environment Protection and
Management 1821.50 1821.50 0.00 0.00
Urban Heritage 20.00 20.00 0.00 0.00
services to urban poor 6144.80 6144.80 0.00 0.00
Urban Governance and institutional
development 75.00 75.00 0.00 0.00
Total 71009.72 62099.78 4331.94 4578.01
Consultancy Division
P a g e | 172 Darashaw & Company Pvt Ltd.
Table 19-5: O&M required for Capital ivestment
O&M
Sector - Physical as % 2011- 2012- 2013- 2018- 2020- 2021- 2022-
Infrastructure of 12 13 14 2014-15 2015-16 2016-17 2017-18 19 2019-20 21 22 23 2023-24 2024-25 2025-26
watersupply 6% 527.3 720.9 924.2 937.8 952.2 967.3 983.1 999.7 1017.7 1036.7 1056.6 1077.5 1099.4
Consultancy Division
sewerservices 4% 417.5 570.8 731.8 740.6 749.9 759.6 769.8 780.5 792.4 804.9 818.0 831.8 846.2
stormwaterdrainage 4% 303.7 415.2 532.2 539.8 547.8 556.1 564.9 574.1 584.3 595.0 606.3 618.1 630.5
solidwaste
The O&M expenditure for social infrastructure is assumed to be met by the revenues from the same.
P a g e | 173
City Development Plan, Ratlam
City Development Plan, Ratlam
O&M for the new projects for 15 years 39964.13 Rs. Lakhs
Consultancy Division
P a g e | 174 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Revision in Water Charges Rs.90 per month for 15% increase every 3 years
residential
Rs.180 per month for
commercial
Revision in Initial Deposit for No UGD currently Rs.4000 for residential and
New UGD Connections Rs.7000 for commercial
as advance deposit with
15% increase every 3 years
for each new connection
Revision in monthly user No UGD currently consolidated in the
charges for UGD integrated tax
Revision in User charges Rs.180 collected per annum. 15% increase every 3 years
towards Sanitation, Street Adhoc revision
Lighting and Fire Fighting
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 175
City Development Plan, Ratlam
Property Taxes
Table 19-9: Key assumptions for forecasting income from property tax
Current Partial Reforms
Description Full Reforms Scenario
Level Scenario
Annual Growth in
No data Increase with 5 %
Number of Increase with 5 % per year
available per year
Assessment
Average tax Rs
Average tax Rs 1200 and
Property Tax Area base 1200 and minimum
minimum tax of Rs.400 per
charges method tax of Rs.400 per
properties
properties
Periodic Increase in
15% increase in 15% increase in every 3
Average Revenue ----
every 3 years years
per property (%)
Gradual increase in
Collection efficiency 60% assumed for collection efficiency to
60%
(%) the 15 years 85% by 2015-16 and then
continuous assumed.
Water Charges
Table 19-10: Key assumptions for forecasting income from water tax
Partial Reforms Full Reforms
Description Current Level
Scenario Scenario
Consultancy Division
P a g e | 176 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Sewerage Charges
Table 19-11: Key assumptions for forecasting income from sewer tax
Partial Reforms Full Reforms
Description Current Level
Scenario Scenario
100% of Total 100% of Total
Number of UGD
Nil Number of Property Number of Property
Connections
tax assessment tax assessment
Assumed Ratio of
Domestic and Non-
Nil 90:10 90:10
Domestic to the total
UGD Connections
MONTHLY USER CHARGES
(Note: Monthly User charges would be collected after the UGD Project is completed)
Domestic (Rs./Year.)
2008-09 Nil
After Sewer scheme
Rs.90 Rs.90
implementation
15% increase every 15% increase every
Rate of increase
3 years 3 years
Non-Domestic (Rs./Year.)
2008-09 Nil
After Sewer scheme
Rs.180 Rs.180
implementation
15% increase every 15% increase every
Rate of increase
3 years 3 years
DEPOSIT FEE /CONNECTION
Domestic (Rs.) Nil Rs.1050 Rs.4000
15% increase every 15% increase every
Rate of increase
3 years 3 years
Non-Domestic (Rs.) Nil Rs.2050 Rs.7000
15% increase every 15% increase every
Rate of increase
3 years 3 years
SEWER CHARGES COLLECTION EFFICIENCY
Collection efficiency 80% 90%
Nil
sewer charges
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 177
City Development Plan, Ratlam
Consultancy Division
P a g e | 178 Darashaw & Company Pvt Ltd.
Table 19-12: Projected Financial Statement for Partial Reforms Scenario (Rs. In Lakhs)
No. Particulars 200506 200607 200708 200809 200910 201011 201112 201213 201314 201415 201516 201617 201718 201819 201920 202021 202122 202223 202324 202425 202526
i Income
A MunicipalTaxesandrates
1 PropertyTax
a current 39.4 34.3 38.5 44.7 448.9 471.4 494.9 567.4 627.5 658.9 755.3 835.4 877.2 1005.5 1112.1 1167.7 1338.6 1480.6 1554.6 1782.1 1971.0
Consultancy Division
b Arrears 51.5 75.4 75.2 77.9
2 propertytaxothers
3 CityDevelopmentCess 38.4 50.7 58.0 60.6 118.8 122.4 126.0 129.8 133.7 137.7 141.9 146.1 150.5 155.0 159.7 164.5 169.4 174.5 179.7 185.1 190.6
4 ConsolidatedTax 47.7 48.3 53.7 61.2 92.7 97.3 111.6 123.4 129.6 148.5 164.3 172.5 197.8 218.7 229.7 263.3 291.2 305.7 350.5 387.6 407.0
5 Others 58.0 60.9 61.8 71.4 77.8 84.8 92.4 100.7 109.8 119.7 130.5 142.2 155.0 168.9 184.1 200.7 218.8 238.5 259.9 283.3 308.8
P a g e | 179
City Development Plan, Ratlam
2018
No. Particulars 200506 200607 200708 200809 200910 201011 201112 201213 201314 201415 201516 201617 201718 19 201920 202021 202122 202223 202324 202425 202526
ii Expenditure
P a g e | 180
Mission2009/08/07/06
Important
1 developmentworks 107.31 61.28 29.44 128.6 135.03 141.78 148.87 156.31 164.13 172.34 180.95 190 199.5 209.48 219.95 230.95 242.49 254.62 267.35 280.72 294.75
Vision2009/08/07/06
2 PublicWelfareworks 76.67 122.12 118.77 129.01 135.46 142.23 149.35 156.81 164.65 172.89 181.53 190.61 200.14 210.14 220.65 231.68 243.27 255.43 268.2 281.61 295.69
3 SalaryExpenses
Establishmentexpenses(
A Permanent) 821.86 867.59 1020.12 1130.12 1220.53 1318.17 1423.63 1537.52 1660.5 1793.36 1936.83 2091.77 2259.12 2439.8 2635.03 2845.83 3073.5 3319.38 3584.93 3871.73 4181.46
Establishmentexpenses(
B Temporary) 123.46 130.44 157.79 171.96 185.72 200.57 216.62 233.95 252.67 272.88 294.71 318.29 343.75 371.25 400.95 433.02 467.67 505.08 545.49 589.13 636.26
Fuelexpenses(Diesel/
City Development Plan, Ratlam
4 Petrol) 33.69 49.83 50.38 45.24 48.86 52.77 56.99 61.55 66.47 71.79 77.53 83.74 90.43 97.67 105.48 113.92 123.04 132.88 143.51 154.99 167.39
5 Telephoneexpeses 5.05 5.42 3.98 4.47 4.47 4.47 4.47 4.47 4.47 4.47 4.47 4.47 4.47 4.47 4.47 4.47 4.47 4.47 4.47 4.47 4.47
6 Eletricityexpenses 336.32 288.09 355.62 461.22 493.51 528.05 565.01 604.57 646.88 692.17 740.62 792.46 847.93 907.29 970.8 1038.76 1111.47 1189.27 1272.52 1361.6 1456.91
7 Differentsmallexpenses 3.92 7.4 4.98 4.24 4.37 4.5 4.63 4.77 4.92 5.06 5.21 5.37 5.53 5.7 5.87 6.05 6.23 6.41 6.61 6.8 7.01
8 Corporationoffice 6.14 8.75 4.37 8.38 9.05 9.77 10.56 11.4 12.31 13.3 14.36 15.51 16.75 18.09 19.54 21.1 22.79 24.61 26.58 28.71 31.01
9 Commissioneroffice 0.7 0.73 2.04 1.92 1.98 2.04 2.1 2.16 2.23 2.29 2.36 2.43 2.51 2.58 2.66 2.74 2.82 2.9 2.99 3.08 3.17
10 Accountsdepartment 43.83 38.27 65.8 48.96 50.92 52.96 55.07 57.28 59.57 61.95 64.43 67.01 69.69 72.47 75.37 78.39 81.52 84.78 88.17 91.7 95.37
11 Developmentdepartment 24.1 1.16 2.75 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41
12 Stores 15.97 17.13 22.73 9.88 9.88 9.88 9.88 9.88 9.88 9.88 9.88 9.88 9.88 9.88 9.88 9.88 9.88 9.88 9.88 9.88 9.88
13 Streetlights 41.2 23.68 17.13 19.95 19.95 19.95 19.95 19.95 19.95 19.95 19.95 19.95 19.95 19.95 19.95 19.95 19.95 19.95 19.95 19.95 19.95
14 Pubilcworks 294.23 489.42 505.91 602.09 602.09 602.09 301.05 301.05 301.05 301.05 301.05 301.05 301.05 301.05 301.05 301.05 301.05 301.05 301.05 301.05 301.05
15 Waterworks 60.98 113.3 160.28 116.07 116.07 116.07 58.04 58.04 58.04 58.04 58.04 58.04 58.04 58.04 58.04 58.04 58.04 58.04 58.04 58.04 58.04
16 Workshop 6.84 20.08 8.98 5.63 5.63 5.63 5.63 5.63 5.63 5.63 5.63 5.63 5.63 5.63 5.63 5.63 5.63 5.63 5.63 5.63 5.63
17 PublicRelation 11.25 9.68 14.16 14.04 15.16 16.38 17.69 19.1 20.63 22.28 24.06 25.99 28.07 30.31 32.74 35.36 38.18 41.24 44.54 48.1 51.95
18 FinanceDepartment 0.98 0.95 2.01 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33
19 TaxcollectionDepartment 0.26 0.27 0.37 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23
ExtraordinarySuspense
20 Expenses 388.59 292.91 244.61 331.23 331.23 331.23 331.23 331.23 331.23 331.23 331.23 331.23 331.23 331.23 331.23 331.23 331.23 331.23 331.23 331.23 331.23
21 loansandinterest 169.58 83.28 136.8 263.57 276.75 290.59 305.12 320.37 336.39 353.21 370.87 389.41 408.88 429.33 450.79 473.33 497 521.85 547.94 575.34 604.11
TotalExpenditure 2572.93 2631.78 2929.02 3497.55 3667.62 3850.1 3686.84 3897 4122.6 4364.72 4624.68 4903.79 5203.5 5525.4 5871.04 6242.34 6641.19 7069.67 7530.04 8024.71 8556.29
Surplus/DeficitRsinlakhs 35.73 3.96 486.68 109.61 282.35 284.55 651.82 701.28 1701.5 2121.52 2127.4 2474.67 2573.88 2744.6 2879.14 3328.87 3551.85 3727.45 3872.56 4618.18 4850.98
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 181
Table 19-14: Projected Financial Statement for Full Reforms Scenario (Rs. In Lakhs)
Sr. 2017 2018 2019 2020 2021 2022 2023 2024 2025
P a g e | 182
No. Particulars 200506 200607 200708 200809 200910 201011 201112 201213 201314 201415 201516 201617 2018 2019 2020 2021 2022 2023 2024 2025 2026
i Income
A MunicipalTaxesandrates
1 PropertyTax
a current 39.4 34.3 38.5 44.7 448.9 471.4 570.6 613.5 665.6 700.5 797.1 847.6 889.9 1061.2 1128.3 1184.7 1412.7 1502.1 1577.2 1880.7 1999.7
b arrears 51.5 75.4 75.2 77.9
2 propertytaxothers
3 CityDevelopmentCess 38.4 50.7 58.0 60.6 118.8 122.4 157.5 173.1 189.4 206.6 212.8 219.2 225.7 232.5 239.5 246.7 254.1 261.7 269.5 277.6 286.0
4 ConsolidatedTax 47.7 48.3 53.7 61.2 92.7 97.3 129.6 130.6 137.4 163.4 166.7 175.0 208.7 221.9 233.0 277.8 295.4 310.2 369.9 393.3 412.9
5 Others 58.0 60.9 61.8 71.4 77.8 84.8 92.4 100.7 109.8 119.7 130.5 142.2 155.0 168.9 184.1 200.7 218.8 238.5 259.9 283.3 308.8
a WaterTax 228.0 242.6 228.9 232.8 234.5 236.1 237.8 239.4 667.0 823.9 865.1 1044.6 1096.8 1151.7 1209.2 1460.1 1533.2 1609.8 1690.3 2041.1 2143.1
City Development Plan, Ratlam
7 watertaxothers 10.2 11.0 10.6 10.3 10.3 10.3 10.4 10.4 10.4 10.5 10.5 10.5 10.6 10.6 10.6 10.7 10.7 10.7 10.8 10.8 10.8
8 LicenseFees 7.1 9.6 9.6 10.4 11.8 13.3 15.1 17.2 19.5 22.1 25.0 28.4 32.2 36.5 41.4 47.0 53.3 60.4 68.5 77.7 88.2
OtherLicenseFeesand
9 otherfees 43.4 36.7 46.0 61.8 69.5 78.2 88.1 99.1 111.5 125.5 141.2 158.9 178.8 201.2 226.5 254.9 286.8 322.7 363.2 408.7 460.0
10 OtherTaxes 1.3 2.0 2.1 1.0 1.1 1.1 1.2 1.2 1.3 1.3 1.4 1.5 1.6 1.6 1.7 1.8 1.9 2.0 2.1 2.2 2.3
B OtherIncome 176.8 120.6 138.6 140.1 147.1 154.4 162.1 170.2 178.7 187.7 197.1 206.9 217.3 228.1 239.5 251.5 264.1 277.3 291.2 305.7 321.0
IncomefromDifferent
C Schemes 39.5 37.3 40.9 22.3 24.0 26.0 28.0 30.3 32.7 35.3 38.2 41.2 44.5 48.1 51.9 56.1 60.5 65.4 70.6 76.3 82.4
D GrantsandContribution 1435.3 1555.7 2330.2 2205.2 2315.5 2431.2 2552.8 2680.5 2814.5 2955.2 3103.0 3258.1 3421.0 3592.1 3771.7 3960.2 4158.3 4366.2 4584.5 4813.7 5054.4
Extraordinary(Suspense)
E income 360.7 350.6 321.7 388.4 398.1 408.1 418.3 428.7 439.5 450.5 461.7 473.3 485.1 497.2 509.6 522.4 535.4 548.8 562.6 576.6 591.0
F sewertax 0.0 0.0 0.0 0.0 667.0 823.9 865.1 1044.6 1096.8 1151.7 1209.2 1460.1 1533.2 1609.8 1690.3 2041.1 2143.1
sewerconnection
G deposites 0.0 0.0 1397.5 823.8 111.1 631.1 165.7 174.0 210.1 220.6 231.6 279.6 293.6 308.4 372.3 390.9 410.5
TotalIncome 2537.2 2635.74 3415.7 3387.94 3949.97 4134.64 5861.32 5518.74 6155.3 7256.89 7180.8 7825.76 8273.98 8823.8 9287.9 10214.3 10911.9 11494 12182.8 13579.6 14314.2
ii Expenditure
Mission2009/08/07/06
Important
1 developmentworks 107.31 61.28 29.44 128.6 135.03 141.78 148.87 156.31 164.13 172.34 180.95 190 199.5 209.48 219.95 230.95 242.49 254.62 267.35 280.72 294.75
Vision2009/08/07/06
2 PublicWelfareworks 76.67 122.12 118.77 129.01 139.33 150.48 162.52 175.52 189.56 204.72 221.1 238.79 257.89 278.52 300.8 324.87 350.86 378.93 409.24 441.98 477.34
Consultancy Division
3 SalaryExpenses
Establishmentexpenses(
A Permanent) 821.86 867.59 1020.12 1130.12 1220.53 1318.17 1423.63 1537.52 1660.5 1793.36 1936.83 2091.77 2259.12 2439.8 2635.03 2845.83 3073.5 3319.38 3584.93 3871.73 4181.46
Establishmentexpenses(
B Temporary) 123.46 130.44 157.79 171.96 185.72 200.57 216.62 233.95 252.67 272.88 294.71 318.29 343.75 371.25 400.95 433.02 467.67 505.08 545.49 589.13 636.26
7 Differentsmallexpenses 3.92 7.4 4.98 4.24 4.37 4.5 4.63 4.77 4.92 5.06 5.21 5.37 5.53 5.7 5.87 6.05 6.23 6.41 6.61 6.8 7.01
8 Corporationoffice 6.14 8.75 4.37 8.38 8.8 9.24 9.7 10.19 10.7 11.23 11.79 12.38 13 13.65 14.33 15.05 15.8 16.59 17.42 18.29 19.21
9 Commissioneroffice 0.7 0.73 2.04 1.92 1.98 2.04 2.1 2.16 2.23 2.29 2.36 2.43 2.51 2.58 2.66 2.74 2.82 2.9 2.99 3.08 3.17
10 Accountsdepartment 43.83 38.27 65.8 48.96 50.92 52.96 55.07 57.28 59.57 61.95 64.43 67.01 69.69 72.47 75.37 78.39 81.52 84.78 88.17 91.7 95.37
11 Developmentdepartment 24.1 1.16 2.75 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41
12 Stores 15.97 17.13 22.73 9.88 9.88 9.88 9.88 9.88 9.88 9.88 9.88 9.88 9.88 9.88 9.88 9.88 9.88 9.88 9.88 9.88 9.88
13 Streetlights 41.2 23.68 17.13 19.95 19.95 19.95 19.95 19.95 19.95 19.95 19.95 19.95 19.95 19.95 19.95 19.95 19.95 19.95 19.95 19.95 19.95
14 Pubilcworks 294.23 489.42 505.91 602.09 602.09 602.09 301.05 301.05 301.05 301.05 301.05 301.05 301.05 301.05 301.05 301.05 301.05 301.05 301.05 301.05 301.05
15 Waterworks 60.98 113.3 160.28 116.07 116.07 116.07 58.04 58.04 58.04 58.04 58.04 58.04 58.04 58.04 58.04 58.04 58.04 58.04 58.04 58.04 58.04
16 Workshop 6.84 20.08 8.98 5.63 5.63 5.63 5.63 5.63 5.63 5.63 5.63 5.63 5.63 5.63 5.63 5.63 5.63 5.63 5.63 5.63 5.63
17 PublicRelation 11.25 9.68 14.16 14.04 15.16 16.38 17.69 19.1 20.63 22.28 24.06 25.99 28.07 30.31 32.74 35.36 38.18 41.24 44.54 48.1 51.95
18 FinanceDepartment 0.98 0.95 2.01 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33
19 TaxcollectionDepartment 0.26 0.27 0.37 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23
ExtraordinarySuspense
20 Expenses 388.59 292.91 244.61 331.23 331.23 331.23 331.23 331.23 331.23 331.23 331.23 331.23 331.23 331.23 331.23 331.23 331.23 331.23 331.23 331.23 331.23
21 loansandinterest 169.58 83.28 136.8 263.57 276.75 290.59 305.12 320.37 336.39 353.21 370.87 389.41 408.88 429.33 450.79 473.33 497 521.85 547.94 575.34 604.11
TotalExpenditure 2572.93 2631.78 2929.02 3497.55 3671.24 3857.81 3699.15 3914.49 4145.9 4394.49 4661.68 4948.85 5257.51 5589.3 5945.99 6329.47 6741.79 7185.15 7661.92 8174.67 8726.13
Surplus/DeficitRsinlakhs 35.73 3.96 486.68 109.61 278.73 276.84 2162.17 1604.26 2009.4 2862.4 2519.12 2876.92 3016.47 3234.5 3341.91 3884.86 4170.09 4308.84 4520.92 5404.95 5588.04
P a g e | 183
City Development Plan, Ratlam
City Development Plan, Ratlam
Consultancy Division
P a g e | 184 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Table 19-17: Financial Operating Plan for Full Reforms Scenario (Rs. In Lakhs)
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 185
City Development Plan, Ratlam
From the above it is clear that the Municipal Corporation will be able to fund 10%
of the project cost and also meet its O&M obligation under Full Reforms
scenario. Since public contribution is envisaged in funding water supply and
sewer scheme, PPP model can be considered for implementation and O&M.
Proven model that can be considered is the Water Supply Scheme under PPP
implemented in Khandwa city in Madhya Pradesh. The project cost of Khandwa
water supply scheme is Rs. 106.72 Crores of which the Central and the State
Government contributions are 80% and 10% respectively. The remaining 10% is
to be borne by the Concessionaire viz. Vishwa Infrastructure, Hyderabad. The
O&M shall be the responsibility of the Concessionaire and the Concession period
is 25 years.
Consultancy Division
P a g e | 186 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 187
City Development Plan, Ratlam
Consultancy Division
P a g e | 188 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Thriupur water supply and sewer project on Build Own Operate and Transfer
basis - Water supply infrastructure to draw raw water and distribute for
industrial and domestic users.
Alandur underground sewerage scheme Public participation in the scheme by
financial contribution in the form of upfront payment for service connections
Desalination Plant at Chennai to treat 100 MLD sea water by reverse osmosis
on Design Build Own Operate and Transfer basis for 25 years.
The above projects highlight the importance of private sector involvement in
implementation of various projects. The number PPP projects till date under
JNNURM in various sectors are as follows:
Table 19-19: PPP Projects implemented under JNNURM
Cost
Sector Number
(Rs. Crores)
Water Supply 3 (Project related) 246.61
Sewerage 1 (Project related) 31.47
Solid Waste Management 17 (Operation and 873.91
Maintenance)
MRTS 1 (Project related) 476.15
Source: JNNURM
PPP projects bring in the much required funds for the project, reduce project
delays, and improve operational efficiencies and quality of service delivery.
Further, municipal Corporations should not be involved in maintenance of parks,
schools, hospitals; recreational facilities as these facilities can be developed on
commercial formats successfully with private sector participation and the
Corporations shall focus its efforts towards provision of basic infrastructure
facilities. With PPP gaining importance even in the provision of basic
infrastructure, the municipal Corporations shall play the role of facilitator in
implementation of these projects.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 189
City Development Plan, Ratlam
From the 40 per cent land pool, 20 per cent is earmarked for development of
road network, five-eight per cent for garden and lake developments, another
five-eight per cent for construction of houses for economically weaker sections,
and the remaining five-eight per cent is auctioned by the urban development
authority. Money raised from the auctioned land helps cover infrastructure
development expenses like the cost of laying of roads, gardens, lakes, flyovers,
etc.
Consultancy Division
P a g e | 190 Darashaw & Company Pvt Ltd.
City Development Plan, Ratlam
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 191
Measures for making Ratlam
a Sustainable city-
Special Paper 1
The sea level is also projected to rise with cyclonic activities set to increase
significantly with warmer oceans. The continuous
warming and the changing rainfall pattern over the
Indian region may jeopardize Indias development
Climate change is
by adversely impacting the natural resources such recognized both as
as water forests, coastal zones, and mountains on a threat and a
which more than 70% of the rural population is challenge
dependent.
The physiographic features and the geographic location, which control the
climate of the country, bestows it with great wealth of its natural resources,
surface and ground water availability, forestry and vegetation. The region
abounds in very rich collection of flora and fauna, and some of these locations
exhibit a high degree of species endemism and constitute biodiversity
hotspots of the world. There is an ever increasing recognition of the need for
Consultancy Division
Darashaw & Company Pvt Ltd. Page |1
Special Paper Measures for making Ratlam a Sustainable cities
About 30% (285.35 million people, 2001 census) of the Indian population
resides in urban areas. In post-independence era while population of India has
grown three times, the urban population has grown five times. Urban areas
are heavily dependant on fossil fuels (often imported), for the maintenance of
essential public services, for powering homes, transport systems,
infrastructure, industry and commerce. The fossil fuels are increasingly
becoming more expensive due to scarcity of fuel and increase in demand. In
addition to this, the environmental and social impacts of the consumption of
fossil fuels are increasingly becoming a concern. These impacts include air
pollution, global warming, waste disposal problems, land degradation and the
depletion of natural resources.
Several Indian cities and towns are experiencing 15% growth in the peak
electricity demand. The local governments and the electricity utilities are
finding it difficult to cope with this rapid rise in demand and as a result most
of the cities/towns are facing severe electricity shortages. There is a need to
develop a framework that will encourage and assist cities in assessing their
present energy consumption status, setting clear targets for and preparing
action plans for generating energy through renewable energy sources and in
conserving energy utilized in conducting urban services.
Consultancy Division
Page |2 Darashaw & Company Pvt Ltd.
Measures for making Ratlam a Sustainable cities Special Paper
efficiency and promote healthy buildings for users. Traffic clogged city centers
are reclaimed for pedestrians, green spaces are preserved and expanded,
recycling schemes are promoted, and environment friendly buildings are
designed.
What our cities will look like in the future will depend on, how they are
planned or, much more important, whether they are planned at all. The key
point is that planning and management has a key role in ensuring
sustainability.
Many of the problems associated with our cities exist because they have not
been planned, or the planning has been ineffective or misdirected and
secondly due to due to inefficient management and governance of the cities.
Sustainable cities will look at the existing cities and aim at making policy
changes and indentify strategies which will improve the status of existing
cities and address environmental issues.
Consultancy Division
Darashaw & Company Pvt Ltd. Page |3
Special Paper Measures for making Ratlam a Sustainable cities
The Energy efficiency strategies for city can be broadly categorized under two
heads. Strategies and measures applicable at city level for provision of
services and strategies applicable at building level
For those bearing the financial responsibility for local public services,
efficiency in the provision of energy and water is one of the few cost-effective
options available for meeting growing demands for vital services such as
electricity, water and wastewater treatment. The budgets for these services
often lack funds to invest in improvements, and public entities are looking for
ways to finance energy efficiency projects. Among many possible options,
performance contracting offers a mechanism for municipalities and public
utilities to finance efficiency improvement projects without upfront
investment.
Consultancy Division
Page |4 Darashaw & Company Pvt Ltd.
Measures for making Ratlam a Sustainable cities Special Paper
The major energy loads in any are typically the water pumping systems,
street lighting, sewage treatment and handling, and electricity distribution.
Municipal buildings such as offices, hospitals, schools also contribute to the
high municipal energy bills. Therefore, the following systems are those most
commonly addressed by a municipal energy efficiency audit:
Street lighting
Water Pumping
Sewage pumping
Electrical distribution
Municipal Buildings
High mast tower lights of 400W, 250 W, 70 W are generally used for street
lighting in most of the ULBs which can be replaced with more energy efficient
LEDs of 125 W, 70 W and 28 W respectively. A 100% target to replace the
high mast tower lights can be set with year wise target. Ratlam Municipal
Corporation can adopt ESCO model financing for Energy Efficiency street
lighting projects.
Strategies
Ratlam has 7575 street lights positioned all over the municipal areas out of which 299
street lights are in not in working position. The details of different types of streetlight in
Ratlam are given below. There are 706 nos of CFL tube lights out of which 681 nos
are 72 watt CFL and 25 nos are of 85 watt CFL.
Consultancy Division
Darashaw & Company Pvt Ltd. Page |5
Special Paper Measures for making Ratlam a Sustainable cities
Automatic street lights ensure that energy is not wasted by lights turned on
during day time. Most of the ULBs predominantly follow manual switching of
street lights which results in labour costs, energy wastage and poor efficiency.
The best solution is to install automatic sensors.
Strategies
In Ratlam Municipal corporation it has been observed that the operating load for street
lighting remains same throughout the night. In order to reduce the energy load it is
suggested to install the multi tab ballast which varies the load of the lamp according to
the traffic load during the night.
Multitab ballast comes with a facility of setting the time for which the lamp will run up to
its full facility. So during the evening operating hours the timer is set for the full loading
of the lamp and during midnight onwards it will be set for 50% loading of the lamp.
Astronomical timer switch will help in reducing the wastage of lighting consumption as
due to seasonal variation the operating hours of street lighting does change. So the
switch doesnt allow street light to get on before the dusk and after the dawn.
Astronomical timer switch will be installed which will help in reducing the wastage of
lighting consumption as due to seasonal variation the operating hours of street lighting
does change. So the switch doesnt allow street light to get on before the dusk and
after the dawn
Consultancy Division
Page |6 Darashaw & Company Pvt Ltd.
Measures for making Ratlam a Sustainable cities Special Paper
Strategies
For the proposed water supply scheme, a detailed study should be conducted to
assess the volume of water to be pumped and height at which the pumps need to be
located.
The proper designing of the pumping system using the fluid flow analysis
softwares can bring out energy savings in running and maintenance of water
pump systems to the tune of 20%.
Major energy loss is caused due to the improper dimension and adjustments,
by properly adjusting the pump speed using variable speed drivers these
losses can be reduced.
Strategies
Strategies
The major energy saving measures that can have maximum impact are as follows.
Replacement of incandescent lamps with CFL
Replacing the conventional T-12 (40 Watt) copper ballast tube lights with the
energy efficient T-5 (28 watt) electronic ballast tube lights. The saving would be
around 42% per tube light.
Replacing the conventional ceiling fans which consumes (70-80watt) with energy
efficient fans (which consumes 50 watt). The savings will be 37% per fans.
Replacing the existing unitary air conditioners with the BEE star labeled air
conditioners.
The overall electricity savings can be achieved by implementing all the above
measures would be approximately more then 20% of the total consumption in
various sectors of the city.
Consultancy Division
Darashaw & Company Pvt Ltd. Page |7
Special Paper Measures for making Ratlam a Sustainable cities
In India there are two Building codes (policy frameworks) which deal with the
construction of buildings and with Energy efficient design of buildings - the
National Building codes 2005 (NBC 2005) and the new Energy conservation of
buildings codes 2006 (ECBC 2006). The national building codes only consider
regulations in building construction primarily for the purposes of regulating
administration , health and safety , materials and construction requirements
and building and plumbing services whereas the ECBC 2006 consider energy
conservation and energy efficiency in buildings to provide minimum
requirement for the energy efficient design and construction of buildings. The
NBC 2005 refers to a wide variety of building type and ownership whereas
ECBC 2005 only refers to commercial buildings and some building complexes.
The ECBC 2006 mainly considers administration and enforcement, the building
envelope, HVAC, service hot water and pumping, lighting and electric power
to encourage conservation of energy. These are considered during
construction of new buildings and while doing additions to existing buildings.
Consultancy Division
Page |8 Darashaw & Company Pvt Ltd.
Measures for making Ratlam a Sustainable cities Special Paper
Strategies
Green Building Implementation Framework Model for ULB
In order to propagate the energy efficient/ green building in the jurisdiction of Ratlam
Municipal Corporation the construction of commercial, industrial and residential
complexes / townships as per the green building standards can be made mandatory by
ULB or some special financial incentives such as property tax rebates or incentives in
electricity bills etc can be given by the ULB.
For the effective implementation of sustainable construction as per the LEED / GRIHA
criteria ULB should set up a Green Building cell which can be a subset of the JNNURM
cell, which will consist of members of town planning authority, PWD and ULB who will
be trained on Green Building concept and also seek the help of LEED AP or GRIHA
certified professionals.
This green building cell will be responsible for the approval of all plans in order to
ensure that it is as per the criteria of LEED / GRIHA which can also have a third party
inspection from LEED AP / GRIHA certified professionals who in turn will give the
certification report to town planning department advising them on any changes to be
Consultancy Division
Darashaw & Company Pvt Ltd. Page |9
Special Paper Measures for making Ratlam a Sustainable cities
Strategies
ULB can offer financial assistance for reduction in energy use in lighting systems
that go beyond the ASHRAE guidelines. This incentive allows energy efficient
lighting to be a cost effective measure, ULB can also offer subsidies for indoors
and outdoors solar lighting devices for community and individual users.
As of now there are no subsidies offered for most energy efficient HVAC
systems and for the use of natural water coolers. ULB can offer financial
incentives for more energy efficient HVAC systems. This encourages their use in
new buildings and when retrofitting existing buildings.
Financial assistance or subsidy can be given to solar heating systems in
particular which will be preferred option for the city as this technology being
suitable for the climate of the city.
ULB by notification in consultation with state government, BEE can amend the
energy conservation building codes to suit the conditions and factors prevailing
Consultancy Division
P a g e | 10 Darashaw & Company Pvt Ltd.
Measures for making Ratlam a Sustainable cities Special Paper
in Ratlam
Direct every owner or occupier of a building or building complex to comply with
the provisions of the energy conservation building codes.
Direct, if considered necessary for efficient use of energy and its conservation,
any consumer referred to get energy audit conducted by an accredited energy
auditor.
Take all measures necessary to create awareness and disseminate information
U for efficient use of energy and its conservation.
L
B Arrange and organize training of personnel and specialists in the energy
conservation techniques for efficient use of energy and its conservation.
Take steps to encourage preferential treatment for use of energy efficient
equipment and appliances.
ULB can also work out on possibility of establishing an energy conservation fund
with adequate contribution from State government, private entities in city etc in
order to enhance the financing of EE projects to be implemented.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 11
Special Paper Measures for making Ratlam a Sustainable cities
India has been dependant on fossil fuels such as coal, oil and gas for its
energy requirements. Today, more than 65% of its capacity is fossil fuel
dependant. Despite the recent discoveries of gas as well as initiatives to
develop coal reserves, it is likely that our dependence on fossil fuels will
continue in near future. The reserves of fossil fuels are constantly depleting.
Additionally in last couple of years, the price of fossil fuels has shown a
consistent upward trend.
Given this scenario, it is of paramount importance that the country develops
all possible domestic energy sources. India cannot afford to ignore any
source of energy just because those sources are currently expensive, since
economic loss due to non supply of electricity will be greater than the cost
of selected sources of energy. Minimising dependence on import of
conventional fuel and provision of energy to all at affordable prices should be
the main concerns for energy policy of India.
Consultancy Division
P a g e | 12 Darashaw & Company Pvt Ltd.
Measures for making Ratlam a Sustainable cities Special Paper
The use of 1000 SWHs of 100 litres capacity each can contribute to a peak load
saving of 1 MW.A SWH of 100 litres capacity can prevent emission of 1.5 tones
carbon dioxide per year.
Strategies
MNRE provides subsidy to the extent of 30% of the cost limited to RS 1500 per
cooker and based upon a detailed survey conducted among the household and
commercial establishments an annual target can be kept for installing solar cookers
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 13
Special Paper Measures for making Ratlam a Sustainable cities
Strategies
MNRE provides a subsidy of Rs 8000 for a 74 Wp system and based upon a detailed
survey conducted among the household and commercial establishments an annual
target can be kept for solar home lighting systems.
Strategies
Ratlam has regular powercuts everyday and large number of households and
commercial establishments are using invertors. A 250 Wp Solar PV, home invertor
system costs approximately Rs 30000 and based upon a detailed survey conducted
among the household and commercial establishments an annual target can be kept for
solar PV for home invertors
Strategies
Ratlam has regular powercuts everyday and large number of households and
commercial establishments are using invertors. A 250 Wp Solar PV, home invertor
system costs approximately Rs 30000 and based upon a detailed survey conducted
among the household and commercial establishments an annual target can be kept for
solar PV for home invertors
Consultancy Division
P a g e | 14 Darashaw & Company Pvt Ltd.
Measures for making Ratlam a Sustainable cities Special Paper
Strategies
Commissioners Office , Town Hall, City development Authority office can be take on
pilot basis and can be taken on priority to demonstrate success of such projects to
public and same could be replicated elsewhere. In large commercial establishments
like hotels, shopping complexes, theatres, hospitals etc and institutions like schools,
colleges and universities, roof top solar from 100 to 250 KW capacities might be
recommended.
Strategies
A target can be kept of installing certain nos of solar streetlights along the main road.
This could be financed by giving advertising rights to various MNCs who will in turn
install the lights with no financial implications on the city
Strategies
A target can be kept to make certain number of traffic lights solar powered. The cost of
a solar traffic light is approximately Rs 25000. MNRE gives subsidy up to 50% of the
cost of the system or Rs 2.5 Lakhs whichever is less
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 15
Special Paper Measures for making Ratlam a Sustainable cities
Strategies
A target can be kept to convert certain nos hoarding into solar hoardings. The
approximate cost of solar hoardings start form Rs 1 lakh onwards. MNRE gives ubsidy
to the extent of 50% of the cost or Rs 15000 per 100 Wp whichever is less.
Strategies
The project can be developed on PPP route where MNRE gives a subsidy subject to a
ceiling of RS 1.5 Crore per MW.
Consultancy Division
P a g e | 16 Darashaw & Company Pvt Ltd.
Measures for making Ratlam a Sustainable cities Special Paper
Strategies
The approximate cost of biomethanation projects from sewerage treatment plant is Rs
10 Crore per MW, for which MNRE is providing subsidy to the tune of Rs 3 Crore per
MW under the scheme of energy from urban & industrial waste.
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 17
Special Paper Measures for making Ratlam a Sustainable cities
Consultancy Division
P a g e | 18 Darashaw & Company Pvt Ltd.
Measures for making Ratlam a Sustainable cities Special Paper
The approximate cost of the park will around RS 1 Crore, which can be finalised
upon the preparation of the DPR. ULB should initially call for quotations for
preparation of DPR and concept plan for the park
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 19
Special Paper Measures for making Ratlam a Sustainable cities
Lack of adequate finance is one of the reasons that even being technically
and economically viable, many of the energy conservation or renewable
energy projects projects / programmes do not get implemented. The
financing of solar cities is quite challenging as the quantum of finance for
various strategies varies from few hundred rupees to several crores of
rupees. Therefore a variety of financing institutions and schemes has to be
integrated to evolve a feasible financing plan.
Consultancy Division
P a g e | 20 Darashaw & Company Pvt Ltd.
Measures for making Ratlam a Sustainable cities Special Paper
No matter which option is used to finance the project, the financing of the
project is ensured through two main types of contracts:
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 21
Special Paper Measures for making Ratlam a Sustainable cities
Under a shared savings structure the ESCo finances the project, usually by
borrowing money from one or
more third parties. This
structure is much less
common than the guaranteed
savings structure. In the case
of shared savings, the ESCo
assumes not only the
performance risk, but the
financial risk as well (including
the underlying customer credit
risk). The customer assumes
no financial obligation other than to pay a percentage of the actual savings
to the ESCo over a specified period of time. This obligation is not considered
debt and does not appear on the customers balance sheet. The portion of
savings paid to the ESCo is always higher for shared savings than the
guaranteed savings projects, reflecting the ESCos significantly greater risk
and expense for borrowing money.
Since the ESCO is a service company, it typically has few assets that it can
offer as a security to a lender. To add to this, the ESCO assumes the risk of
non-performance of the measures as well as the credit risk of the customer.
This makes borrowings by ESCOs expensive. As a commercial entity, the
ESCO has no option but to recover this cost from its customers, and this
results in higher share of the savings going to the ESCO: something not
quite in the customers best interest. For this reason this model was found to
be less attractive as ESCO markets matured. The Guaranteed Savings
system overcomes this hurdle.
Guaranteed Savings:
Consultancy Division
P a g e | 22 Darashaw & Company Pvt Ltd.
Measures for making Ratlam a Sustainable cities Special Paper
debt service, the ESCO pays the difference. If the savings exceed the
guarantee amount, the customer and the ESCO usually share the excess
savings. The size of the share and the method of calculation vary widely,
depending on the degree of risk assumed and the extent of services
provided by the ESCO.
It is important to note that in a typical guaranteed savings project, the ESCO
has no contractual relationship with the bank or leasing company. The
ESCOs guarantee is to the customer, and is a guarantee of performance
(that the project will result in enough cost savings to repay the loan
assumed to finance it), not a guarantee of payment. As a consequence, the
bank or leasing company confines its risk analysis to the customers general
credit standing. The financial institution may regard the performance
guarantee as a form of credit enhancement.
Energy efficiency in street lighting, water pumping, and cluster based
projects in industries are some of the projects that can be implemented in
ESCO mode.
Implementing Responsible
no Project Agency Stakeholder Financing Model
Solar water
heating IREDA Loans , MNRE
Solar Water manufacturers Subsidy , Carbon
Heating /distributors financing, rebate on
1 Systems ULB/ DISCOM electricity bills
Consultancy Division
Darashaw & Company Pvt Ltd. P a g e | 23
Special Paper Measures for making Ratlam a Sustainable cities
Implementing Responsible
no Project Agency Stakeholder Financing Model
ULB /State
Solar Cooker Nodal Agency/
manufacturers Private Carbon financing ,
2 Solar Cookers /distributors developer MNRE Subsidy
3 Solar Lanterns
Solar Home
Lighting
ULB/
4 Systems Solar
DISCOM/ Revolving fund, Carbon
5 Solar Hoardings Photovoltaic
State Nodal Financing
Solar Traffic Manufacturers
Agency
6 lights
Solar Street
7 lights
8 Solar Invertors
Renewable energy project
SPV Power Project finance, Carbon
developer (PPP)
9 Plants financing
Renewable energy project
MSW and STP developer (PPP) through Project finance, Carbon
10 Power Plant BOO/BOT basis financing
LED/CFLs
instead of Performance contract,
incandescent carbon financing,
11 bulbs ESCO ULB /DISCOM rebate on electricity bills
Energy efficient
electrical
appliances such Performance contract,
as fans , Bonds, carbon
refrigerators, air financing, rebate on
12 conditioners ESCO ULB/ DISCOM electricity bills
Performance contract,
Energy efficient Bonds, carbon
water pumping financing, rebate on
13 systems ESCO ULB/ DISCOM electricity bills
Consultancy Division
P a g e | 24 Darashaw & Company Pvt Ltd.
Special Paper 2
For those bearing the financial responsibility for local public services, efficiency in
the provision of energy and water is one of the few cost-effective options
available for meeting growing demands for vital services such as electricity,
water and wastewater treatment. The budgets for these services often lack funds
to invest in improvements, and public entities are looking for ways to finance
energy efficiency projects.
The major energy loads in any are typically the water pumping systems, street
lighting, sewage treatment and handling, and electricity distribution. Municipal
buildings such as offices, hospitals, schools also contribute to the high municipal
energy bills. Therefore, the following systems are those most commonly
addressed by a municipal energy efficiency audit:
Street lighting
Water Pumping
Sewage pumping
Electrical distribution
Municipal Buildings
This paper focuses on Energy efficiency strategies for Ratlam Municipal
Corporation.
Consultancy Division
Darashaw & Company Pvt Ltd. Page |1
Special Paper Energy Efficiency in Street Lighting-Ratlam
Consultancy Division
Page |2 Darashaw & Company Pvt Ltd.
Energy Efficiency in Street Lighting- Ratlam Special Paper
Increasing energy efficiency will assist the ULBs and municipalities in expanding
infrastructure and improving services for public (especially in context of energy
price increases), and shift activities to more sustainable directions. It generates
environmental benefits through reduced emissions of greenhouse gases and local
air pollutants. It also stimulates new services, creating value and local jobs.
Improving energy efficiency both by reducing quantities of energy consumed and
by changing processes, offers a powerful tool for achieving sustainable
development by reducing the need for investment in energy infrastructure and
by cutting fuel costs.
Consultancy Division
Darashaw & Company Pvt Ltd. Page |3
Special Paper Energy Efficiency in Street Lighting-Ratlam
Tubelight
LED 8 W
SN Type of Fixture Calculation Unit 40 W T5 28W
Total
Maintenance [12] x [13]/
14 Cost 100 Rs/12 Yrs 256800 38520 25680
Maintenance
15 Cost [14]/12 Rs/Yr 21400 3210 2140
Salvage Value
of HPSV Fixture
16 @ 50% [12A] x 0.5 Rs - 0
[10] + [12]
17 Net Investment [16] Rs 2568000 7707210 5136000
18 Net Saving [7] - [15] Rs/Annum - 616670.96 230315.36
12 x [17]/
19 Payback Period [18] Month - 149.98 267.60
[A] [B]
Hrs/ Day/
1 Working Hours/Day - Fixture 12 12
KW/ Day/
2 Power Consumption - Fixture 1.8 0.66
KW/
Annual Power Annum/
3 Consumption [2] x 365 Fixture 657 240.9
KW/
Annum/
4 Power Saving [A]-[B], [A]-[C] Fixture 0 416.1
Total Nos of
5 Fixtures Nos 174 174
KW/
6 Total Power Saving [4] x [5] Annum 0 72401.4
Rs/
7 Monetary Saving 2.75x [6] Annum 0 199103.85
8 Life of Lamp - Years 2.2 12
9 Cost of Lamp - Rs/lamp 0 -
10 Replacement Cost [5] x [9] x 12/ [8] Rs/12 Yrs 0
11 Cost of Fixture - Rs/Fixture 6000 15000
Total Cost of
5 Fixtures [5] x [11] Rs 1044000 2610000
13 Maintenance Cost - % 10 0.5
Total Maintenance
14 Cost [12] x [13]/ 100 Rs/12 Yrs 104400 13050
15 Maintenance Cost [14]/12 Rs/Yr 8700 1087.5
Salvage Value of
HPSV Fixture @
16 50% [12A] x 0.5 Rs - 0
Consultancy Division
Page |4 Darashaw & Company Pvt Ltd.
Energy Efficiency in Street Lighting- Ratlam Special Paper
Consultancy Division
Darashaw & Company Pvt Ltd. Page |5
Special Paper Energy Efficiency in Street Lighting-Ratlam
These services are included in the Projects cost and are to be met from the
savings generated.
The main features of the project besides saving of energy include installation of
a central computerized control room through which operation of control boxes
can be done remotely and the information of switched off lights, energy
readings of different central boxes can be known.
Consultancy Division
Page |6 Darashaw & Company Pvt Ltd.
Energy Efficiency in Street Lighting- Ratlam Special Paper
Contract Economics
During the contract period, the VMC will get Rs.12.00 lakhs per annum
as its share in savings and also save Rs.53.00 lakhs in maintenance per
annum. Therefore every year, the VMC would get a saving of Rs. 65.00
lakhs per annum. During the five year contract period, the VMC will save
Rs.3.25 cores. In addition, after the contract period, VMC will be left with
the energy saving equipment worth Rs. 3.00 crores. At the end of 5
years, VMC will get total benefit of Rs. 6.25 crores. Further, after the
contract period, the VMC will get annual saving of Rs.170 lakhs in
current charges for street lighting. Besides, for savings over and above
the assured 42.7%, the VMC will get 75% share and the ESCO will get
the remaining 25%.
Consultancy Division
Darashaw & Company Pvt Ltd. Page |7
Special Paper 3
1.1 Introduction
Community Policing is understood as Policing with the help of Community.
The concept of Community Policing started from village Kotwal, where a person
from the community performs the functions of the police in the village. Home-
guards were another form of community policing. Even this has now become
more a part of police force than of the community.
Consultancy Division
Darashaw & Company Pvt Ltd. Page |1
Special Paper Community Policing- Ratlam
Thus, citizens can form groups within the society or the area they live or work.
Such social group can enroll themselves with the Police and work hand in hand
with Police to solve problems, minimize disorders in the society and thus achieve
the very objective of Community Policing.
1.2 Evolution
The evolution of police in India over the years, has been guided by the
compulsions and needs of the dominant ruling class, may it be a Maurya or
Gupta king, a Moghul Monarch, the British running a colonial system to achieve
their ends of occupation or even, sadly, so, in our present day democratic
arrangement. We must well understand that the Police have been the principle
medium through which the dominant classes have sought to perpetuate their
hold on power and authority by means fair or foul. Thus, making the Police an
instrument of oppression and giving it the image of a rough and ready ruler
friendly organization rather than that of an agency, which is impartial and neutral
and which objectively enforces the rule of law.
Ironically, in our country's post independent history too any move to change the
basic framework, which even remotely lead to the lessening of control over the
Police has been resisted wholeheartedly by the powers that be. In over half a
century of independence many commissions were set up and recommendations
received without much has been done to let the Police come out its negative
image.
Consultancy Division
Page |2 Darashaw & Company Pvt Ltd.
Community Policing- Ratlam Special Paper
This was the guiding force for us in Madhya Pradesh to launch ourselves into the
entire gamut of Police - Community relations. Though informally efforts in this
direction had been made at different levels earlier but a concerted deliberate and
formal effort was launched in 1995 at Indore. These initiatives were also
emulated by other districts and are getting accepted as an effective mode of
improving Police - Community Relations.
Range / No. of
S.No. No. of Members
Distt. Samities
Gram Nagar Gram Nagar
Raksha Raksha Raksha Raksha
Samiti Samiti Samiti Samiti
Sagar Range
1 Sagar 1066 134 1045 1286
2 Panna 852 40 6211 356
3 Damoh 695 63 7082 688
4 Chhatarpur 917 160 13505 2069
5 Tikamgarh 596 137 9453 1550
Rewa Range
1 Rewa 773 61 7521 785
2 Satna 9 8 232 266
3 Sidhi 524 15 10479 380
Consultancy Division
Darashaw & Company Pvt Ltd. Page |3
Special Paper Community Policing- Ratlam
Consultancy Division
Page |4 Darashaw & Company Pvt Ltd.
Community Policing- Ratlam Special Paper
the Naxalite infested districts of Balaghat, Mandla and Dindori have been
earmarked for such training at an estimated cost of Rs. 1.2 crores in the first
phase.
The State Government is also considering a proposal to arm the members of the
societies so as to enable the members to discharge their duties in a determined
manner. The members would be entitled to use weapons as long as their
membership lasts. In the meantime the district police authorities have been
advised to help the eligible and willing members obtain valid arms licences.
Efforts are being made to form such Gram Raksha Samities in every village of
the state and impart training to the members. Meetings at various levels are also
being organized to sensitize the members towards the role they are expected to
play in maintenance of Law and Order in their respective jurisdiction.
For six days training camp the following statistics and expenses are proposed for
members of the committee:
S. Training Expenses per Total no. of
Total Expenses
No. Days head per day members
1 1 Rs. 150 /- 3, 23, 145 4, 84, 71, 750.00
2 6 Rs. 150 /- 3, 23, 145 29, 08, 30, 500.00
Before passing of Madhya Pradesh Village and City Community Policing Vidheyak
1999, in 1956, the ranked officer, governing officers which are authenticated by
Government in Gwalior, Chambal, Sagar and Rewa Districts are proposed to
incorporate as a unit in Police Department.
On every police station level, attempts are made to cent-percent establish the
Village Protection Committee. Efforts are also made to give training on police
station level to all members. Summits are also organized in districts for
activation of the Mission. Expectations are there from the government to pay
some money to members and providing them with weapons license and budget
allocation for training and make appropriate changes in the Vidheyak for this
purpose.
Consultancy Division
Darashaw & Company Pvt Ltd. Page |5
Special Paper Community Policing- Ratlam
It may suggest -:
o Steps for community involvement in police functions.
o Assist in implementing such suggested measures.
o Monitor implementations of these measures.
o Assist in redressal in peoples grievances.
o Review the law and order situation in the district.
o Review the progress in investigation, detection of crimes and the pace in
the prosecution.
This effort has positively galvanized the functioning of the Police department
hitherto not known to or associated with positive humanitarian endeavor. In
Indore 9 centers are working to save the families from disintegrating. These
centers are run by the active support and cooperation of volunteers from society,
these include social workers, lawyers, medical professional's etc. Out of the 2909
complains received at these centers 2364 have resulted in settlement after
counseling, a success rate of 81.26%. In cases where legal aid was required
female lawyers associated with this effort provide this aid free.
Although the State Govt. had formally set up a De-addiction Committee in the
year 1989.This committee in its real sense started functioning effectively for the
last four years, as a part of Police initiatives to organize De-addiction camps. For
these camps services of three government doctors and one private practitioner
Consultancy Division
Page |6 Darashaw & Company Pvt Ltd.
Community Policing- Ratlam Special Paper
were hired. Each camp was of 45 days duration. Initially Detoxification was done
for the first two weeks and thereafter for one month duration the edicts of Brown
Sugar were treated through psychological and psychiatrics therapy. Yoga was
used as a mode to make these addicts more positive in their mind. The family
members, after counseling were requested to behave normally with the patients.
These services were rendered free of cost. N.S.S.(National Social Service)
volunteers were engaged to follow up the cured addicts. An effort is also being
made to provide training and loans where possible, to the cured persons for their
rehabilitation. More than 150 persons in Six camps were treated and they are
now leading normal life.
There are 28875 member are working in a total 3525 Village Defense
Committees. Patrolling local law and order maintenance during festivals and
various other works of village improvement are being carried out through these
members. Apart from the above Police has also carried out work of adult
education and literacy expansion through these Committees.
For example, Road construction / repair work in Shajapur District was done
through voluntary labor contribution. 320 villages in 16 police stations areas
connected with main roads. Work of road leveling, repair of drainage systems
and reconstruction of damaged roads was carried out through voluntary labor
contribution of Police and village defense committees.
This is a novel initiative towards providing social justice to villagers. Under these
initiative officers of police station camp at a fixed place, date and time. Officers
of revenue and forest department are also requested to be present depending on
the need. These meetings are held to dispose off the minor incidents or problems
of the village. 353 villages have benefited by this scheme.
Under this scheme, school students of different age group are brought to Police
Stations to acquaint them with the working of the Police station and give them
the opportunity to interact with Police Officers. This is done with the help of the
school administration. Besides the opportunity to exchange views with
Policemen, this effort helps allay the fear of about the Police from the minds of
these children. Thus their negative views and fears about the Police change
favorably.
Consultancy Division
Darashaw & Company Pvt Ltd. Page |7
Special Paper Community Policing- Ratlam
Urban Areas
Similar approach may be adopted for urban areas with the difference that :
There may be higher qualifications for the trainees.
Wards and neighborhoods may be put in place.
Instead of the Gramsabha, Wardsabha may supervise the work of
community police.
A system of registration of private security agencies operating in housing
complexes factories and major establishments may be put in place.
Closer interaction of the police station with the community police may be
organized because of proximity and easy accessibility.
Consultancy Division
Page |8 Darashaw & Company Pvt Ltd.
Community Policing- Ratlam Special Paper
Police Stations
An advisory committee should be constituted for a police station.
It should have proportionate representation from women and deprived
communities.
Representatives of the 3 tier panchayat and local urban bodies in the area
should also be included.
Voluntary agencies of high reputation may also be included.
There should be no educational qualifications but preference may be given
to educated/ enlightened citizens.
Advisory committee should meet at least once in a month.
Where there is a major crime or break-down of law and order it should meet
as early as possible to take stock of the situation.
The committee should review the function of the police during the month,
look into grievances and complaints given by the citizens, make
arrangement for their expeditions redressal satisfactory to the citizens,
monitor the progress in investigations of crimes and in presenting challans.
Approve, sending of final reports advise for further investigations.
Approve putting off challans.
Recommend the appointment of special police officers for areas and periods
to be specified.
Consultancy Division
Darashaw & Company Pvt Ltd. Page |9
Darashaw&CompanyPvt.Ltd.
6th Floor, Express Building
14th E Road,
Near Government Law College
Churchgate (West), Mumbai 400
020
Email:[email protected]
Website:www.darashaw.com