Lap Dat Cau Unic
Lap Dat Cau Unic
Lap Dat Cau Unic
MODEL
SERIES
UBA260 series
UBA340 series
UBA500 series
IMUBA200605A
PRINTED IN JAPAN
TABLE OF CONTENTS
5. PIPING PROCEDURES
q Mounting of control valve .......................5- 1
w Hose connection ......................................5- 2
e Piping port connecting control valve .......5- 4
r Port connecting piping on the side ..........5- 5
t Hoses connecting to piping on
the bottom side .......5- 6
y Caution for piping ....................................5- 8
u How to check recommended allowable
back pressure of control valve .................5- 9
i Hydraulic circuit of crane ........................5-10
6.ZERO-POINT ADJUSTMENT
OF LOAD METER.......................6- 1
7.ATTACHMENT OF CHART OF
RATED LOAD STICKERS .....7- 1
8. RECOMMENDED
COMPONENTS
q Pump and electric motor ..........................8- 1
w [Optional] Hydraulic equipment .................8- 2
e [Optional] Components for piping between
control valve and crane body ..................8- 4
r [Optional] Mounting base for
control valves .......8- 5
t [Optional] Installation of radio/
reote controller ......8- 6
MEMO
1. GENERAL VIEW
Weight, distance from gravity center, and height of gravity center of UBA
series
Hoist winch (hoist motor with reduction gear)
Boom
L Anti-disengagement device
Column
W Over-winding
H h alarm device
Hook
Control valve
(For piping system on
the bottom side)
Prepare the components to be installed on the cane (mounting base, hydraulic unit,
hoses, and bolts) to mount them.
Weight of 15kg of control valves and related components does not include in the
weight illustrated in the table above.
Weight of the control valves and related components for the radio remote controller
is 45kg.
1-1
2. CRANE INTTALLATION GUIDE
q POSITION OF INSTALATION
When deciding where to install the crane, it is no doubt to decide it in considering the
most convenient operation of the crane, but in case of mounting it on a small vessel,
install it at the position where the least fluctuation of the trim (difference between the
head and the stern) and of lateral slanting (or at the center of the ship) will be expected
while sailing or operating the crane in particular.
C
D
b5
D
C
B
d
a3
b4
a2 b3
A a1 b2
B
b1 a5 a4
A
UBA 500 AND UBA340 SERIES UBA260 SERIES
(UNIT : mm)
Model A B C D Installation Bolt
Model a1 a2 a3 a4 a5 b1 b2 b3 b4 b5 d
UBA500 SERIES 180 180 180 180 180 180 300
UBA340 SERIES 140 180 140 140 180 140 250
UBA260 SERIES 200 200 200 200 200
2-1
CRANE INSTALLATION GUIDE
3. When installing the crane on an inclined plane, allow the mounting surface of base to be
level first to install the crane..
4. Install both the crane base and the mounting base with mounting bolts.
Secure the mounting bolts by means of double-nut system or by application of locking
agent to prevent them from being loose.
5. Set up a drainage hole at the bottom of the mounting base to drain water.
If the drainage hole is impossible to be set up, instruct operators to drain water
periodically out of the drain plug in the crane base.
M
Drain plug
W
Mounting base
R
2-2
CRANE INSTALLATION GUIDE
t22
170
170
t22
t22
Mounting bolts for fixing the round-shaped Mounting bolts for fixing the round-shaped
base are to be prepared by customer. base are to be prepared by customer.
Heat-treated bolt (equivalent to 10.9) Heat-treated bolt (equivalent to 10.9)
M18X80 (711918080) 16 pcs M18X80 (711918080) 18pcs
20 holes at 18 places equally drilled on the P.C.D.
20 holes at 16 places equally drilled on the P.C.D.
5
D.44 .50
0
P.C.
460
.D
P.C
520
0
49
0
56
460
1
520 1
2-3
CRANE INSTALLATION GUIDE
UBA500 series
2, 3
Base assembly
t25
185
t25
Mounting bolts for fixing the round-shaped
base are to be prepared by customer.
Heat-treated bolt (equivalent to 10.9)
M2090 (711920090) 18 pcs
23 holes at 18 places equally drilled on the P.C.D.
80
.D.5
P.C
600
650
600
1
Note: Mounting dimensions of the
round-shaped base are the
same as those of the old type
ZF500MR series provided by T
company.
Parts list
Mounting of round-shaped base
Device number: 096C57000
Item Part name Part number Q'ty
1 Round base 096C57010 1
Heat-treated bolt
2 760129083 12
(M24100L)
3 Nut 72111124D 24
2-4
CRANE INSTALLATION GUIDE
Boom rest
Hook catch
CAUTION
Mount the crane on a level surface to prevent it from being
tilted during crane operation.
2-5
3. SELECTION OF PUMP AND ELECTRIC MOTOR
kgf/cm2
Rated pressure MPa 19.6200 17.2175 17.2175
Recommended pump
(1) For engines with accelerator
Theoretical delivery:cm3/rev 44 36 33
Max. revolution speed in use:min-1 1400 1700 1700
(Max. speed in use:rpm) (1400) (1700) (1700)
(Delivery:l/min) (60) (60) (53)
(2) For engines without accelerator
Theoretical delivery:cm3/rev 27 27 23
Max. revolution speed in use:min-1 1500 1500 1500
(Max. speed in use:rpm) (1500) (1500) (1500)
(Delivery:l/min) (40) (40) (35)
(3) For electric motor
50Hz area
Theoretical delivery:cm3/rev 23 23 20
Revolution speed in use:min-1 1450 1450 1450
(Revolution in use:rpm) (1450) (1450) (1450)
(Delivery:l/min)
(32) (32) (28)
60Hz area
Theoretical delivery:cm3/rev
Revolution speed in use:min-1 20 20 18
(Revolution in use:rpm) 1750 1750 1750
(Delivery:l/min) (1750) (1750) (1750)
(33) (33) (30)
3-1
SELECTION OF PUMP AND ELECTRIC MOTOR
CAUTION
Confirm rotating direction of the pump.
When hydraulic power is less than the rated pressure and
the rated flow of the crane, the rated crane operation may
not be carried out.
When hydraulic power is more than the rated flow of the
crane, adjust the hydraulic power to a level that is less
than the rated flow by flow control valve or the like.
In this case, set up a oil tank with sufficient capacity as the
oil temperature will be easy to rise.
3-2
4. SELECTION OF OIL TANK
1 Use a oil tank with sufficient capacity so that oil temperature will not rise over 80.
In normal crane operation, a tank with the capacity of 1.5 times as much as the rated
flow is needed.
Place the mounting base for the crane body at a position where it is level or higher
against the position of the oil tank.
3 Recommended filter:
5 Allowable operating hydraulic oil temperature range for the crane is -15~80.
CAUTION
Oil tank of closed type allows the back pressure to be
generated in the return circuit due to variation of oil flow to
give a bad effect on valves.
Since mixing foreign substances with the hydraulic oil
exerts an bad effect on hydraulic equipment, be sure to fit
suction filter and return filter.
4-1
5. PIPING PROCEDURES
Slewing center
Control valves
Operators position
2. Preparation of a cover
When the crane is to be operated with the control valves set up outside and the crane itself will
be left for a long period of time, it is recommended to put a cover over the valves to maintain
normal functions of the valves.
5-1
PIPING PROCEDURES
w HOSE CONNECTION
When piping on the side or on the bottom side, connect each hydraulic equipment by referring
to each piping example.
In addition, when designing hydraulic circuit all over the ship on the customer side, return oil
out of the control valves for the crane to the oil tank directly.
5-2
PIPING PROCEDURES
5-3
PIPING PROCEDURES
Derricking
Derrick (lower):
G3/8(PF3/8)
Hoisting
Derricking (raise): Hoisting (down):
G3/8(PF3/8) G3/8(PF3/8)
Hoisting (up):
RC3/8(PT3/8)
Telescoping Telescoping
(retract): Telescoping
G3/8(PF3/8) (extend):
G3/8(PF3/8)
Slewing (C.W.):
G3/8(PF3/8)
Slewing
34 28
22.6+0.1 +0.1 30.8+0.1
18.6
0 15 0 0
15 1 1 15
5-4
PIPING PROCEDURES
Derricking (raise):
Rc3/8(PT3/8)
Hoisting (up):
Rc3/8(PT3/8)
Slewing (C.C.W.):
Rc3/8(PT3/8)
Telescoping (retract): Slewing (C.W.):
Rc3/8(PT3/8) Rc3/8(PT3/8)
Derricking (lower):
Rc3/8(PT3/8) Drain for slewing:
Hoisting (down): Rc1/4(PT1/4)
Rc3/8(PT3/8)
Telescoping (extend):
Rc3/8(PT3/8)
Drain for hoisting:
Rc1/4(PT1/4)
5-5
PIPING PROCEDURES
PROCEDURES
Unfasten M8 bolts (6 places) mounting the plate for piping on the side to remove the plate.
Disconnect the hoses out of the plate to put them out to lower side.
Put the cover over the window on the side.
Ordering name: Cover P/N: 088D565030
Length of hoses from bottom face
of base
1. Position of hoses
When marking on the Bottom surface of
sticker is hard to read, swivel joint
confirm the hose
arrangement on the
basis of the connections
of piping on the side.
5-6
PIPING PROCEDURES
Raising boom
7.5
10
30
11.6 7.5 22 HEX
(70)
G1/4
(PF1/4)
Drain
5.5
7
30
11 6.5 19 HEX
(58)
5-7
PIPING PROCEDURES
CAUTION
If the back pressure exceeds the allowable level, trouble such
as oil leakage may occur.
Therefore, choose the size of piping with the hardest
operating conditions (working in winter season and back
pressure when in maximum flow) in mind.
Return drain oil both for hoisting and for slewing to the oil
tank by way of separate piping without joining oil returning
from control valves.
Be sure to return draining oil both for hoisting and for
slewing to the oil tank.
Otherwise, hydraulic motor will be damaged.
2. Size of piping
Refer to following table to choose size of piping.
5-8
PIPING PROCEDURES
Pressure gauge
R1/2(PT1/2)
Joint
To tank Rc3/4
(PT3/4)
Busing
O-ring
Piping components
Model
Pressure gauge Bushing Joint Bushing O-ring
URA500 series GV50-173
(NAGANO SBU04-020J B-516159 A-514273 P18Hs90
MEARSURING
URA340 series 1pcs 1pcs 1pcs 1pcs
INSTRUMENT CO.)
Measurement range (728690402) (022765121) (022362120) (731291018)
URA260 series 2.5Mpa 1 unit
Figures within brackets indicate part number and corresponding parts are available
at this company.
5-9
PIPING PROCEDURES
Control valve
G3/4
(MV-30A)
T (PF3/4)
Telescoping
Hoist up
Load meter
Hoisting
G.P
Rc1/4
(PT1/4)
Derricking
P G1/2
(PF1/2)
5-10
6. ZERO-POINT ADJUSTMENT OF LOAD METER
In case where the load meter does not read O (zero) when hoisting hook with no load, adjust it by
following procedures illustrated below.
1. Unfasten the cross-head screws (3 places) to remove the front cover.
Pointer
Knob
Front cover
Screws (3 places)
2. When allowing the pump to be rotated at a low speed (in case of adjusting type) and winding
up the hook with no load, adjust the pointer to indicate 0 (zero) while the center knob is
being fixed.
CAUTION
The load meter indicates the weight of a cargo only while it
is being hoisted up, and the meter cannot be used when
other operation (winding down, stop, and other) is carried
out.
6-1
7. ATTACHMENT OF CHART OF RATED LOAD STICKERS
2 (two) stickers of the chart of rated load are provided and the one has been stuck to the crane
before shipping.
Since the other one is attached as a sheet, stick it to a position near the crane control levers
where an operator can refer to it easily.
The figure shows the chart of rated load for UBA344 as an example
81
11 70
10 60 Boom angle
Lift of hook
50
Lift above ground (m)
Lift of hook 40
30
Lift of hook
20
Lift of hook
10
1
1 1+2 1+2+3 1+2+3+4
Note: 1. The chart shows hoisting capacity when the crane has been set up
level and the data are based on actual working radius by
incorporating shift due to deflection of the boom when loaded.
2. The rated loads listed above are based on the strength of the crane
and stability of the mounted vessel is not considered.
Therefore, operate the crane by paying special attention to the stability
of the vessel.
7-1
8. RECOMMENDED COMPONENTS
Displacement cm3/rev 44.0 (rear port) 36.6 (rear port) 33.2 (rear port)
SGP2A44D2H9-R SGP1A36D2H9-R SGP1A32D2H9-R
For C.W. Type
(740240085) (740240088) (740240090)
rotation
Displacement cm3/rev 44.7 (rear port) 36.6 (rear port) 33.2 (rear port)
Maximum speed: min -1
1400 1700
rpm (1400) (1700)
Engine drive
rotation
Displacement cm3/rev 27.8 (rear port) 23.7 (rear port)
SGP1A27D2H9-R SGP1A23D2H9-R
For C.W. Type
(740240092) (740240093)
rotation
Displacement cm3/rev 27.8 (rear port) 23.7 (rear port)
Pump
rotation
Displacement cm3/rev 23.7 (rear port) 20.0 (rear port)
Electric motor drive
SGP1A23D2H9-R SGP1A20D2H9-R
For C.W. Type
(740240093) (740240094)
rotation
Displacement cm3/rev 23.7 (rear port) 20.4 (rear port)
SGP1-20D2H9-L SGP1A18D2H9-L
For C.C.W. Type
(740240101) (740240095)
60Hz area
rotation
Displacement cm3/rev 20.0 (rear port) 18.3 (rear port)
SGP1A20D2H9-R SGP1A18D2H9-R
For C.W. Type
(740240094) (740240096)
rotation
Displacement cm3/rev 20.4 (rear port) 18.3 (rear port)
MITSUBISHI
ELECRTIC SF-JR
CORPORATION
Sealed
Electric motor
HITACHI,
outer-fan LTD.
TFD-KK
type FUJI 15kw 11kw
AC200V, ELECTRIC MLA
4-pole CO., LTD.
TOSHIBA
CORPORATION
FBK21(FBK8)
8-1
RECOMMENDED COMPONENTS
Figures within brackets indicate part number and the parts are available at this company.
With rust-proof painting, moss green color (standard).
CAUTION
Install the equipment where rainwater and/or seawater will
not be splashed on them.
8-2
RECOMMENDED COMPONENTS
Return port
Rc1 (PT1) Drain port Rc1/4 (PT1/4)
Tank drain
Rc3/4(PT3/4)
Hydraulic oil tank
(capacity: 130l)
900 550
1150 4-15 800
CAUTION
Check that the power source is AC200V/200~220V,
50/60Hz, 3-phase.
In order to prevent an electric shock, check that grounding
of class 3 has reliably been provided.
Choose electric wire size of 14mm2 for 11kW supply, and
22mm2 for 15kW supply.
8-3
within 800
R3/4
(PT3/4)
G1/2B(PF1/2)
High-pressure Long elbow
High-pressure
rubber hose rubber hose
High-pressure
rubber hose O-ring G3/8B
High-pressure (PF3/8) Hose adapter
rubber hose
High-pressure rubber hose
High-pressure rubber hose
High-pressure rubber hose
Hose adapter O-ring Bushing Elbow, Elbow, 90 Hose Long elbow
(Raise (Wind up) (LowerWind (Slewing
(with O-ring) (with O-ring) male/female adapter Retract) down C.W.
Extend) C.C.W.)
UBA500 series P-14 3/81400 3/81350 3/81550 3/82500
G1/2B R3/4
(Hs90) Rc3/4G3/4B R3/8G3/8B R1/4G3/8B G3/8BR3/8 770113134 770113135 770113136 770113137
UBA340 series G1/2B 770290162 770290161 770290168 770250056
731191014 770290167 06NSF 06NSF 06NSF 06NSF
770290160 (1pc) (3pc)
(7pc) (1pc) (5pc) (2pc) -06MUF -06MTF -06MUF -06MUF
UBA260 series (1pc)
(2pc) (1pc) (3pc) (2pc)
Decide mounting position of the control valves based on length of high-tension rubber hoses.
e [OPTIONAL] COMPONENTS FOR PIPING BETWEEN
8-4
RECOMMENDED COMPONENTS
The piping joints and fitting hardware for the high-tension rubber hoses are made of stainless steel.
RECOMMENDED COMPONENTS
2 3 4
Part list
Control valve mounting assembly: 099871000 Weight: 16kg
8-5
RECOMMENDED COMPONENTS
1. Mounting procedures
A figure in the circle in the illustrations shows the component unique to radio and cable
remote controllers.
CAUTION
Although the remote control valves and the remote control
box have been designed with both water-proof and rust-
proof in mind, it is recommended that they set up in the
cabin as much as possible.
When they have been set up outdoors for inevitable
reasons and the crane is to be left as it is for a long period
of time, it is recommended to cover them to maintain
normal functions.
In case where radio or cable remote controller is to be
installed (when replacing it to a crane in particular), it is
recommended to replace hydraulic oil.
8-6
RECOMMENDED COMPONENTS
Replace the high-tension filter (line filter) element at regular intervals of once a year.
2 3 4
in an emergency)
08MM090101pc
Bolt, M10X25
711110D252pcs
Nut, M10
72111110D2pcs
Spring washer, 10
7222111002pcs
8-7
RECOMMENDED COMPONENTS
(2) Fitting load meter and piping joints to remote control valves
Add the joint only for winding-up by hoist winch as the hose
fitting hardware is different. (Male/female adapter: 770290154
1pc, O-ring: P-14 Hs90 731191014 1pc)
Mounting position of
load meter
Gauge port 17
G1/4(PF1/4) O-ring
5
Hexagon plug 731191011 1pc
728890200 1pc
8-8
RECOMMENDED COMPONENTS
(3) Connecting the pipes among hydraulic pump, remote control valves,
and crane body
From pump
(IN port) G1/2B (PF1/2)
To tank
(OUT port) G3/4 (PF3/4)
Refer to page 8-4 for piping components and connection between remote control valves and
crane body.
Refer to pages 5-2, 5-3, and 5-8 for piping of hydraulic pump and remote control valve, and
oil tank.
(4) Fitting control box to mounting base for remote control valves
8-9
RECOMMENDED COMPONENTS
(5) Wiring between remote control valves and control box for remote
control with wire harness (cable)
CAUTION
Refer carefully to the electric wiring diagram (on page 8-17
before carrying out wiring.
Since the radio/remote controller is to be powered by
DC24V, use a suitable converter to change it to the correct
electric power before connection if the power is to be
supplied from commercial AC power source.
When setting up the remote control valves away from the
control box, replace the wire harness with that for 5.0m
specifications (item 25) for wiring.
Do not extend the wires by alteration at an operation site
of the crane.
To solenoid valve, electromagnetic proportional delivery
control valve of remote control valves
7
Delivery valve Bias Slewing C.C.W. Slewing C.W. Tele, Extend Tele. Retract Derricking,
Wire band
Hoisting, Down Hoisting, Up
Down
Derricking, Up
750516001 2pcs
black(white)
yellow(red)
red(yellow)
yellow(green)
blue(black)
blue(green)
red(green)
orange
brown
black
yellow
black
black
black
black
black
black
gray
blue
pink
Connections of
12 remote control
Ground terminal valves and wire
Connector assembly harness
ON OFF
099899040 1pc
11
Wire harness (0.5m)
099899010 1pc
Control box
cable or
25
8-10
RECOMMENDED COMPONENTS
(6) Fit the earth terminal and make connection to the power source
6
(Note 4)
ON OFF
13 BATTERY (Note 3)
28 29 30 31 (Note 2) Power source (24V), Red
When connecting the horn, (Interlocking with ON/OFF switch
disconnect connector to of hydraulic pump)
fit the parts described below.
8-11
RECOMMENDED COMPONENTS
8-12
RECOMMENDED COMPONENTS
CAUTION
Carefully check the parts being packed and confirm each
item number described on the part list and the item
number shown in the sections illustrating mounting
procedures to carry out assembly.
8-13
RECOMMENDED COMPONENTS
6 3 1
5
8
7
4
CAUTION
Carefully check the parts being packed and place the
storing container of item in the cabin.
After crane operation, be sure to store the remote
controller assy and the remote controller cable in
the storing container.
Otherwise, it may cause troubles during operation as
moisture may enter the electric system for which must be
very careful.
8-14
RECOMMENDED COMPONENTS
5 5
6 7
3
9
1,10,11
CAUTION
Carefully check the parts being packed and mount the
receiver in item and the antenna near the control box.
After crane operation, put the transmitter in the bag for
receiver to store it in the cabin.
8-15
UBA260 series 17.2 MPa(175 kgf/cm2) at 53 l/min
UBA340 series 17.2 MPa(175 kgf/cm2) at 60 l/min
Control valve (MRV-32A) UBA500 series 19.6 MPa(200 kgf/cm2) at 60 l/min
G3/4
(PF3/4)
Rc1/4
G.P (PT1/4) UBA260 series=69.0 cm3/rev
UBA340 series
Rc UBA500 series=40.1 cm3/rev
Slewing
(Accelerator) P
G1/2
G1/4 (PF1/2)
(PF1/4)
C.W.
Telescoping
a b
a b Hoisting
Up
CAUTION
a b
UBA340 series
=24.5 cm3/rev
a b UBA500 series
Derricking
8-16
RECOMMENDED COMPONENTS
8P AMP
174262-2
8-17
41
43 red
10P 43 40 14
Battery alarm white/green 8 5 34C white/green white/green 41
14 red/black
white/blue 11 6 white/blue white/blue 40
Trouble alarm 10 black/yellow Control valves
24P
3 black/green blue yellow +
Raise blue 2 4 blue blue 9 black white Raise
gray 4 5 gray gray 7 gray green +
Lower black black Lower
Hoist up yellow 5 6 yellow yellow 5 yellow yellow +
1 black white Hoist up
brown
Hoist down 7 brown brown 3 brown green +
black black Hoist down
Extend pink 16 8 pink pink 1 pink green +
orange 9 black black Extend
Retract 9 orange orange 25 orange yellow +
black white Retract
C.W. violet 14 10 violet
sky-blue 15 15 sky-blue
C.C.W.
3 16 white/red
24 red/blue
11 blue/yellow blue/yellow 23 blue/yellow blue
+
Slewing
12 yellow/blue yellow/blue 22 yellow/blue violet C.W.
C.C.W.
13 blue/black blue/black blue
for slewing
+
Slewing
21 blue/black
RECOMMENDED COMPONENTS
Power supply
14 black/white black/white 20 black/white orange C.C.W.
C.W.
Power supply to
Acceleration stop
Over-winding stop
21 blue/green blue/green 29 blue/green blue +
Delivery 22 yellow/green yellow/green 28 yellow/green violet Delivery
24V
23 red/green red/green 27 red/green yellow +
Bias
19 black/red black white Bias
Acceleration 20 black/blue
power supply
electric circuit Power supply for bias
Stop input
Speed input
(24V) red/black 13 2 red/black red/black 13
black
Earth
6 17 white/black
Speed (to control box)
6. Electric wiring diagram for radio/remote controller
green 10 18 green
Horn white 7 1 white
9
Earth (to battery
white/yellow
(0V) black 12 8 black black 50 black
earth terminal on
1 brown/white the ship)
2 yellow/white
Radio equipment (power supply, 0V)
7 green/white green/white 37 green/white
(controller) Horn (Note2)
Power supply 4 red red 42 red 24V (Note 1)
3 red/white red/white 34 red/white
24V (RR), Power supply to
Power T&B T&B radio controlle
supply 102251-24 102231-10
1 3 5 7 9 13 34
Control box 20 21 22 23 25 37 40 41 42
27 28 29 50
Control box
RECOMMENDED COMPONENTS
CAUTION
Connect the power supply (24V) so that interlocking with
the ON/OFF switch for hydraulic power source on the
crane can be achieved.
When no interlocking is necessary, connect the power to
the same power supply (24V) as that of 24V (RR) for radio
controller.
If the horn will not be used, fit the water-proof connector to
the ends of wire harness for water-proof measures.
8-18
9. OVERALL VIEW OF CRANES
(520)
200 200
460
2760
76 MIN 2590~MID 4520~MAX 6400
185 520
1
(1570)
1310
(1110)
915
6-Rc3/8
(PT3/8)
Rc1/4
(PT1/4)
t22
(230)
9-1
OVERALL VIEW OF CRANES
(520)
200 200
460
3110
(76) MIN 2940 ~MID 4870~6790~MAX 8690
185 740
1
(1670)
1310
(1100)
1055
6-Rc3/8
(PT3/8)
Rc1/4
(PT1/4)
t22
(230)
9-2
OVERALL VIEW OF CRANES
(540)
3490
(90) MIN 3310~MID 5510~MAX 7690
210 690
1
(1740)
1458
(1260)
1080
6-Rc3/8
(PT3/8)
Rc1/4
(130)
t25
(PT1/4)
9-3
OVERALL VIEW OF CRANES
(540)
(1840)
1458
(1250)
1165
6-Rc3/8
(PT3/8)
(130)
t25
Rc1/4
(PT1/4)
9-4
OVERALL VIEW OF CRANES
(1920)
1458
(1250)
1195
6-Rc3/8
(PT3/8)
(130)
Rc1/4
t25
(PT1/4)
9-5
OVERALL VIEW OF CRANES
(650)
3690
(86) MIN 3510~MID 5940~MAX 8340
240 685
1
(1990)
1617
(1410)
1160
6-Rc3/8
(PT3/8)
Rc1/4
(100)
t28
(PT1/4)
9-6
OVERALL VIEW OF CRANES
3850
(86) MIN 3670~MID 6070~8470~MAX 10870
240 875
1
(2040)
1617
(1420)
1250
6-Rc3/8
(PT3/8)
(100)
Rc1/4
t28
(PT1/4)
9-7
OVERALL VIEW OF CRANES
(650)
3910
(86) MIN 3730 ~MID 6130~8530~10930~MAX 13330
240 950
1
(2140)
1617
(1420)
1290
6-Rc3/8
(PT3/8)
(100)
Rc1/4
t28
(PT1/4)
9-8
HEAD OFFICE : Center Bldg., 3-12, Higashishinagawa 2-chome,
Shinagawa-ku, Tokyo 140-0002, JAPAN