0% found this document useful (0 votes)
120 views2 pages

KPIs

This document lists key performance indicators (KPIs) for asset management. It includes formulas for calculating KPIs such as failure analysis, breakdown count, unplanned engineering downtime, overtime, work distribution, schedule attainment, backlog, mean time to repair/mean time between failures, shutdown maintenance attainment, and labor utilization. The KPIs are used to measure engineering performance and track it against targets.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
120 views2 pages

KPIs

This document lists key performance indicators (KPIs) for asset management. It includes formulas for calculating KPIs such as failure analysis, breakdown count, unplanned engineering downtime, overtime, work distribution, schedule attainment, backlog, mean time to repair/mean time between failures, shutdown maintenance attainment, and labor utilization. The KPIs are used to measure engineering performance and track it against targets.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Asset Management KPIs

KPI Formula PRCDQ Source Resp. Current Target Approve/


Decline

Failure Analysis Number of failures per asset including Failure analysis - Onkey/BI Engineering - -

This can be calculated either by how many times an asset has


Top 10 Breakdown a breakdown or by the number of hours an operator logs as - Onkey/BI Engineering - -
breakdown

Breakdown Count Number of times an assert has a breakdown - Onkey/BI Engineering - -

Breakdown Hours Number of hours an operator takes to fix a breakdown - Onkey/BI Engineering - -
Unplanned
Operational downtime as a result of unscheduled maintenance
Engineering - Onkey/BI Engineering - -
work.
Downtime
Total overtime work hours by maintenance staff x 100%
Overtime Total normal work hours by maintenance staff - Onkey/BI Engineering - -

Total overtime work hours by maintenance staff per section x


100%
Overtime per Section - Onkey/BI Engineering - -
Total normal work hours by maintenance staff per section

Work Distribution Number of hours logged on job cards per staff member, Onkey/BI
- Engineering - -
Tactical/Non-Tactical defined

Type of Work Trend Number of hours logged per type of work over a specified Onkey/BI
- Engineering - -
period of time, Tactical/Non-Tactical Analysis
Number of completed scheduled work hours in the week
Schedule Attainment Total number of work hours scheduled for the week - Onkey/BI Engineering - -

Total hours of maintenance work on due and overdue WOs


Backlog Total available technical hours per week - Onkey/BI Engineering - -

Cancelled Work Sum of all cancelled work orders


- Onkey/BI Engineering - -
Orders
KPI Formula PRCDQ Source Resp. Current Target Approve/
Decline

MTTR/MTBF SUM(Start of Downtime Start of Uptime)


- Onkey Engineering - -
Number of failures

Shut Down Number of completed scheduled work hours in Maintenance


Maintenance Event - Onkey/BI Engineering - -
Attainment Total number of work hours scheduled for the Maintenance Event
Total time logged on asset management WOs
Labour Utilization Total available maintenance labour hours - Onkey/BI Engineering - -

You might also like