Work Inspection Request Sample Format

1. This is a work inspection request form from Acciona-FreyFil-JEC to Maynilad Water Services for the Putatan WTP 2 project. 2. The form requests inspection of excavation, sand bedding, backfilling, field density testing, and rebar inspection activities at a specified location and time. 3. It refers to an attached drawing, submittals, or test report and provides space for comments from the inspector and notation by the construction manager.

Uploaded by

greg
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
602 views6 pages

Work Inspection Request Sample Format

1. This is a work inspection request form from Acciona-FreyFil-JEC to Maynilad Water Services for the Putatan WTP 2 project. 2. The form requests inspection of excavation, sand bedding, backfilling, field density testing, and rebar inspection activities at a specified location and time. 3. It refers to an attached drawing, submittals, or test report and provides space for comments from the inspector and notation by the construction manager.

Uploaded by

greg
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Chart Title

1.2

0.8

0.6

0.4

0.2

0
1
itle
ACCIONA-FREYFIL-JEC

G/F Jardine Building, JM Compound,

Faraday St. corner Pres. Osmena Highway, Makati City 1234, Philippines

WORK INSPECTION REQUEST

To: Emmanuel De Villa From: Ignacio Lo


Construction Manager, Putatan WTP 2 Constructio
Maynilad Water Services, Inc. Acciona-Fr

Thru: Franz Albert Francisco Requested by: Tobias Kra


Construction Manager Designation: Frey-Fil Pro
ARUP Date: September

Hydrotesting Excavation

Air / Joint Leak Test Sand Bedding

Infiltration / Exfiltration Test Backfilling

Holiday Test Field Density Test

Concrete Pouring Rebar Inspection

Materials Testing Rebar Scanning

Joint Survey Material Sampling

Pipe Laying Plant Inspection

Location: Category:

Date of Activity: Time of Activity:

Refer to Attached: Drawing No. _________________ Keyplan (See Atta


Submittals No. ________________ Test Report No.

Work description:

Inspector Remarks/ Comments:


CONTRACTOR:

Architectural

Proceed Hold
Structural

Civil
Resident Engineer
MEPF

EHS

Noted By:
QAQC
MWSI Constru
ECTION REQUEST
[ Reference Number ]

Ignacio Lobo
Construction Manager,Consortium
Acciona-FreyFil-JEC

Tobias Krause
Frey-Fil Project Manager
September 21, 2016

Final Punchlist

Pre-final Punchlist

Final Inspection

Sub Base

Base Course

Plant Inspection

Testing & Commisioning

Others/ Specify: See description

Keyplan (See Attach)


Test Report No.
Resubmit

Project Manager

MWSI Construction Manager