0% found this document useful (0 votes)
68 views1 page

Proj Guidelines E PDF

The document outlines guidelines for a two-part, year-long project for 4th year BTech CSE and IT students. Students must complete Part I in the 7th semester and Part II, an extension of Part I, in the 8th semester. Projects must be done in groups of up to 3 students and require a minimum of 9,000 lines of code or an equivalent hardware-based project. Throughout the project, groups must maintain a daily project diary to submit monthly to the department head. Final reports and guides are due according to the academic calendar. Innovative project proposals are welcome if within the department domain.

Uploaded by

Deepak Dahiya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
68 views1 page

Proj Guidelines E PDF

The document outlines guidelines for a two-part, year-long project for 4th year BTech CSE and IT students. Students must complete Part I in the 7th semester and Part II, an extension of Part I, in the 8th semester. Projects must be done in groups of up to 3 students and require a minimum of 9,000 lines of code or an equivalent hardware-based project. Throughout the project, groups must maintain a daily project diary to submit monthly to the department head. Final reports and guides are due according to the academic calendar. Innovative project proposals are welcome if within the department domain.

Uploaded by

Deepak Dahiya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PROJECT GUIDELINES

CI 801

BTech CSE & IT 4th Year

1. The Project is to be completed in two parts Part-I, to be done in 7th semester and Part II,
which would necessarily be an extension of PartI, to be completed in the 8th semester.

2. Each project has to be done in a group the size of which should not exceed 3.

3. As the projects are to be based on the application of the learnt knowledge, a minimum of
9000 lines of codes should be expected from each group.

4. The above (point 3) applies in case of hardware based project also.

5. As far as possible creative and innovative ideas from students would be given due credit.

6. Each group will keep a Project-Diary in which record o f meeting with the supervisor,
study, lab work and results etc. should be entered day to day. The Project Diary will be
submitted at the end of every month to the HOD, CSE and IT.

7. The Project reports, Installation guides etc, will have to be submitted as per the academic
calendar received from the Registrars office.

8. Project proposals from the students are welcome provided they fit in our domain.