Kusile Boiler 2-Mechanical Work Schedule - 20160204 Kusile Boiler 2 - Mechanical Work Schedule - 20160204

The document is a schedule for mechanical work on Kusile Boiler 2 from July 2016 to March 2017. It details activities and their start and finish dates for ducting work, including walkdowns of various components. Milestones are shown for the completion of different systems by certain dates.

Uploaded by

dupe2010
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
49 views8 pages

Kusile Boiler 2-Mechanical Work Schedule - 20160204 Kusile Boiler 2 - Mechanical Work Schedule - 20160204

The document is a schedule for mechanical work on Kusile Boiler 2 from July 2016 to March 2017. It details activities and their start and finish dates for ducting work, including walkdowns of various components. Milestones are shown for the completion of different systems by certain dates.

Uploaded by

dupe2010
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

Kusile Boiler 2- Mechanical Work Schedule_20160204 Classic Schedule Layout 20-Feb-17 08:41

Activity ID Activity Name Original Start Finish Activity % Comment December 2016 January 2017
Duration Complete
28 04 11 18

Kusile Boiler 2- Mechanical Work Schedule_20160204 178 26-Jul-16 A 03-Apr-17

Milestones 15 13-Feb-17 03-Mar-17

PA001 Completion 15 13-Feb-17 03-Mar-17


Ducting 15 13-Feb-17 03-Mar-17
PA Fan to Air heater (System 1.3) 0 13-Feb-17 13-Feb-17
A2450 PA001 Walkdown Comp 1,3 & 5 0 13-Feb-17 0%
A21510 PA001 Walkdown Comp 2,4 & 6 0 13-Feb-17 0%
133 - Mill Cold Air Lines - PA Fan to Mill (System1.4) 8 13-Feb-17 20-Feb-17
A21440 PA001 Walkdown Component 8 & 9 0 20-Feb-17* 0%
A21450 PA001 Walkdown Component 10 0 20-Feb-17* 0%
A21460 PA001 Walkdown Component 11 0 20-Feb-17* 0%
A21470 PA001 Walkdown Component 12 0 20-Feb-17* 0%
A21480 PA001 Walkdown Component 13 0 20-Feb-17* 0%
A21490 PA001 Walkdown Component 14 0 13-Feb-17 0%
A21500 PA001 Walkdown Component 15 0 13-Feb-17 0%
03 - Hot Air Distribution Lines (System 3) 7 16-Feb-17 23-Feb-17
A2470 PA001 Walkdown Components 12 / 14 0 16-Feb-17 0%
A21250 PA001 Walkdown Components 13 / 15 0 23-Feb-17 0%
02 - Hot Air Collection Lines (System 2) 0 13-Feb-17 13-Feb-17
A21520 PA001 Walkdown Comp 1, 2 & 6 0 13-Feb-17 0%
A21530 PA001 Walkdown Comp 3,4 & 5 0 13-Feb-17 0%
04 - Burner Air Lines (System 4) 6 13-Feb-17 18-Feb-17
Burner Air Lines (System 4.1) 4 13-Feb-17 16-Feb-17
A21740 Component 43, 44, 47, 48 & 51 PA001 0 13-Feb-17 0%
A21750 Component 42, 45, 46, 49 & 50 PA001 4 13-Feb-17 16-Feb-17 0%
Core Air Lines (System 4.2) 6 13-Feb-17 18-Feb-17
A2780 Bank 50 - PA001 Walkdown 0 13-Feb-17 0%
A2790 Bank 40 - PA001 Walkdown 0 13-Feb-17 0%
A2800 Bank 30 - PA001 Walkdown 0 18-Feb-17 0%
A2810 Bank 20 - PA001 Walkdown 0 13-Feb-17 0%
A2820 Bank 10 - PA001 Walkdown 0 13-Feb-17 0%
08 - Mill Air Lines (System 6) 0 14-Feb-17 14-Feb-17
130 - Mill Hot Air Lines - PA / Air heater to Mill ( 6.1 / 6.2) 0 14-Feb-17 14-Feb-17
System 6.2 0 14-Feb-17 14-Feb-17
A2590 PA001 Walkdown 0 14-Feb-17 0%
System6.1 0 14-Feb-17 14-Feb-17
A2600 PA001 Walkdown 0 14-Feb-17 0%
09 - Flue Gas lines (System 7) 15 13-Feb-17 03-Mar-17
152 - Filter to ID - Duct PJFF to ID Fan (System 7.4) 5 22-Feb-17 03-Mar-17
A2610 PA001 Walkdown - Comp 1 0 22-Feb-17 0%
A3010 PA001 Walkdown - Comp 2 0 03-Mar-17 0%
151 - RAH to Filter - Flue Gas Duct underneath RAH (System 7.2) 1 13-Feb-17 14-Feb-17
A2620 PA001 Walkdown - Component 14 0 13-Feb-17 0%
A3260 PA001 Walkdown - Component 15 0 13-Feb-17 0%
A3270 PA001 Walkdown - Component 16 0 13-Feb-17 0%
A3280 PA001 Walkdown - Component 17 0 14-Feb-17 0%
130 - Boiler to RAH - Flue Gas Duct from Boiler to RAH (System 7.1) 7 13-Feb-17 20-Feb-17
A21360 PA001 Walkdown Component 1 & 2 0 13-Feb-17 0%
Component 3 To 9 7 13-Feb-17 20-Feb-17
A21370 PA001 Walkdown Component 3 0 13-Feb-17 0%
A21380 PA001 Walkdown Component 5 0 13-Feb-17 0%
A21390 PA001 Walkdown Component 6/8 0 20-Feb-17 0%
A21400 PA001 Walkdown Component 7/9 0 15-Feb-17 0%
A21410 PA001 Walkdown Component 4.1 0 13-Feb-17 0%
A21420 PA001 Walkdown Component 4.5 0 13-Feb-17 0%
A21430 PA001 Walkdown Component 4.4 0 13-Feb-17 0%

Actual Work Critical Remaining Work Summary Page 1 of 8 TASK filters: Ducting, In Progress.
Remaining Work Milestone Oracle Corporation
Kusile Boiler 2- Mechanical Work Schedule_20160204 Classic Schedule Layout 20-Feb-17 08:41
Activity ID Activity Name Original Start Finish Activity % Comment December 2016 January 2017
Duration Complete
28 04 11 18
Construction Works 153 26-Jul-16 A 04-Mar-17

System 06 - Combustion Air & Flue Gas System 153 26-Jul-16 A 04-Mar-17
1.1 - Cold Air Suction 47 13-Dec-16 A 04-Mar-17
Cold Air Suction to FDF (1.1) Component 9.2, 9.3 & 9.4 18 13-Dec-16 A 04-Mar-17
A16890 Final Handover 2 16-Jan-17 A 04-Mar-17 65%
A16880 Clean Ducting 4 13-Dec-16 A 04-Mar-17 0%
Cold Air Suction to FDF (1.1) Component 9.1, 10.1 & 10.2 6 13-Feb-17 18-Feb-17
A27520 Scaffolding Dismmantled 0 18-Feb-17* 0%
A16680 Install Maintance Doors 3 Off 6 13-Feb-17 18-Feb-17 0%
1.3 - PA Fan to Air Heater 5 16-Jan-17 A 13-Feb-17
Installation 5 16-Jan-17 A 13-Feb-17
Component 1, 3 & 5 1 13-Feb-17 13-Feb-17
A18550 Handover Comp 1,3 & 5 1 13-Feb-17 13-Feb-17 0%
Component 2, 4 & 6 1 16-Jan-17 A 13-Feb-17
A18790 Clean Comp 2,4 & 6 1 16-Jan-17 A 13-Feb-17 50%
A18800 Handover Comp 2,4 & 6 1 18-Jan-17 A 13-Feb-17 50%
1.4 - PA Fan to Mill 57 27-Nov-16 A 18-Feb-17
Installation 57 27-Nov-16 A 18-Feb-17
Component 10 56 27-Nov-16 A 18-Feb-17
A17290 Fit Stub guides (8off) and do fit-up inspection (Insulation Scaffoldin) 1 27-Nov-16 A 13-Feb-17 10%
A17380 Cut access window to fit tensioner rods, Lift & feed tensioner rods through opening
1 13-Feb-17 13-Feb-17 0%
A17390 Fit-up of component 10 to 8 Tensioner rods & lugs (Dog, wedge and tack weld) and
2 do
13-Feb-17
fit-up inspection 15-Feb-17 0%
A17310 Weld Stub guides (8off) and NDT wel ding 3 12-Feb-17 A 13-Feb-17 50%
A17400 Weld out component 10 to 8 Tensioner rod lugs and NDT welding 3 15-Feb-17 18-Feb-17 0%
Component 13 - Modification Delay 3 02-Feb-17 A 13-Feb-17
A18070 Preliminary Survey (2 off) component 13 Expansion Bellows (Protocols) 1 02-Feb-17 A 13-Feb-17 0%
A18080 Cut (2 off) component 13 Expansion Bellows "Gags" 1 11-Feb-17 A 13-Feb-17 50%
A18050 Weld out component 13.1 to component 11 Joint and NDT welding 2 06-Feb-17 A 13-Feb-17 50%
A18060 Weld out component 13.2 to component 13.1 Joint and NDT welding 2 10-Feb-17 A 13-Feb-17 50%
Component 14 - Modification Delay 26 17-Jan-17 A 14-Feb-17
A18180 Weld out component 14.2 to component 14.1 Joint and NDT welding 2 17-Jan-17 A 14-Feb-17 50%
A18190 Preliminary Survey (2 off) component 14 Expansion Bellows (Protocols) 2 08-Feb-17 A 14-Feb-17 0%
Component 15 - Modification Delay 32 05-Jan-17 A 14-Feb-17
A18310 Preliminary Survey (2 off) component 15 Expansion Bellows (Protocols) 1 13-Feb-17 14-Feb-17 0%
A18290 Weld out component 15.1 to component 11 Joint and NDT welding 3 08-Feb-17 A 14-Feb-17 92.23%
A18300 Weld out component 15.2 to component 15.1 Joint and NDT welding 3 11-Feb-17 A 14-Feb-17 50%
A18340 Weld out component 15.2 to Item 6.2 (Mill Air Line) Joint and NDT welding 3 05-Jan-17 A 14-Feb-17 69.23%
Component 10 To 15 - Modification Delay 2 06-Feb-17 A 14-Feb-17
A18000 Final Handover of components 10 to 15 1 06-Feb-17 A 14-Feb-17 60%
A17990 Clean components 10 to 15 (Cleanliness Protocols) 2 13-Feb-17 14-Feb-17 0%
2.0 - Secondary Air Hot Collection 4 13-Feb-17 17-Feb-17
Component 3, 4 & 5 4 13-Feb-17 17-Feb-17
A20580 Clean After Dis mantling Sc affold 4 13-Feb-17 17-Feb-17 0%
Component 1, 2 & 6 4 13-Feb-17 17-Feb-17
A20570 Clean After Scaffold Dismatling 4 13-Feb-17 17-Feb-17 0%
3.0 - Secondary Air Hot Distribution 13 13-Feb-17 01-Mar-17
Install Secondary Hot Air Distribution duct Component 13 / 15 13 13-Feb-17 01-Mar-17
A9470 Position Inspection window door & bolt down (Impact) 1 22-Feb-17 23-Feb-17 0%
A9430 Final Handover of components 13 / 15 2 13-Feb-17 14-Feb-17 0%
A9440 Clean components 13 / 15 (Cleanliness Protocols) 2 18-Feb-17 21-Feb-17 0%
A9460 Re-fit Acc es s window at 16m level and do fit- up inspec tion 2 21-Feb-17 22-Feb-17 0%
A9450 Weld out Access window on 16m level and do NDT welding 3 22-Feb-17 01-Mar-17 0%
A16290 Break Down Scaffolding 4 14-Feb-17 18-Feb-17 0%
Install Secondary Hot Air Distribution duct Component 12 / 14 5 13-Feb-17 17-Feb-17
A9520 Position Inspection window door & bolt down (Impact) 1 16-Feb-17 16-Feb-17 0%
A9480 Final Handover of components 12 / 14 2 13-Feb-17 14-Feb-17 0%
A9490 Clean components 12 / 14 (Cleanliness Protocols) 2 15-Feb-17 16-Feb-17 0%

Actual Work Critical Remaining Work Summary Page 2 of 8 TASK filters: Ducting, In Progress.
Remaining Work Milestone Oracle Corporation
Kusile Boiler 2- Mechanical Work Schedule_20160204 Classic Schedule Layout 20-Feb-17 08:41
Activity ID Activity Name Original Start Finish Activity % Comment December 2016 January 2017
Duration Complete
28 04 11 18
A9510 Re-fit Acc es s window at 16m level and do fit- up inspec tion 2 15-Feb-17 16-Feb-17 0%
A9500 Weld out Access winow on 16m level and do NDT welding 3 15-Feb-17 17-Feb-17 0%
A16300 Break Down Scaffolding 4 13-Feb-17 16-Feb-17 0%
4.1 - Burner Air Lines 34 11-Dec-16 A 17-Feb-17
Install Components 43, 44, 47, 48 & 51 (1 to 8) 4 31-Jan-17 A 17-Feb-17
Component 43, 44, 47, 48 & 51 4 31-Jan-17 A 17-Feb-17
A7980 Final Handover of components 43, 44, 47, 48 & 51 1 31-Jan-17 A 13-Feb-17 95.77%
A7990 Final Handover of components 44 4 13-Feb-17 17-Feb-17 0%
Install Components 42, 45, 46, 49 & 50 (1 to 8) 4 11-Dec-16 A 16-Feb-17
Components 42, 45, 46, 49 & 50 4 11-Dec-16 A 16-Feb-17
A9390 Final Handover of Components 42, 45, 46, 49 & 50 4 11-Dec-16 A 16-Feb-17 25%
4.2 - Core Air Lines 73 08-Nov-16 A 18-Feb-17
Lift Core Air Ducting Bank 10-50 36 08-Nov-16 A 16-Feb-17
Lift Bank 40 7 12-Nov-16 A 16-Feb-17
A5450 Lift and Float to position box section components 4 12-Nov-16 A 16-Feb-17 90%
A5460 Lift and Float to position pipe section components 4 12-Nov-16 A 16-Feb-17 90%
Lift Bank 30 4 08-Nov-16 A 16-Feb-17
A5430 Lift and Float to position pipe section components 4 08-Nov-16 A 16-Feb-17 75%
Lift Bank 20 2 10-Dec-16 A 14-Feb-17
A5400 Lift and Float to position pipe section components 2 10-Dec-16 A 14-Feb-17 60%
Install Core Air Ducting Bank 10-50 71 12-Nov-16 A 18-Feb-17
Install Bank 40 4 12-Nov-16 A 14-Feb-17
A5760 Weld out ALL and NDT welding 4 12-Nov-16 A 14-Feb-17 90%
Install Bank 30 16 10-Feb-17 A 18-Feb-17
A5690 Weld out ALL and NDT welding 2 10-Feb-17 A 14-Feb-17 90%
A5700 Remove all Rigging gear 2 16-Feb-17 18-Feb-17 0%
A5660 Survey all components elevation & position 4 13-Feb-17 16-Feb-17 0%
Install Bank 20 14 30-Jan-17 A 14-Feb-17
A5620 Weld out ALL and NDT welding 2 30-Jan-17 A 14-Feb-17 90%
A5630 Remove all Rigging gear 2 13-Feb-17 14-Feb-17 0%
Install Bank 10 14 30-Jan-17 A 14-Feb-17
A5550 Weld out ALL and NDT welding 2 30-Jan-17 A 14-Feb-17 90%
A5560 Remove all Rigging gear 2 13-Feb-17 14-Feb-17 0%
6.1 - Hot Primary Air Duct 77 30-Oct-16 A 14-Feb-17
Components 16 To 24 77 30-Oct-16 A 14-Feb-17
A27540 No Ac cess MHPSA 0 13-Feb-17 0%
A4200 Final Handover of components 16 to 24 - Note 2 30-Oct-16 A 14-Feb-17 50%
6.2 - Hot Air to Mill 2 29-Nov-16 A 14-Feb-17
Installation 2 29-Nov-16 A 14-Feb-17
Sys6.1-3 Final Handover of components 27 to 46 2 29-Nov-16 A 14-Feb-17 95%
7.1 - Flue Gas 167 26-Jul-16 A 20-Feb-17
Install Flue Gas Duct Component 3 To 9 167 26-Jul-16 A 20-Feb-17
Component 6/8 44 17-Dec-16 A 20-Feb-17
A3660 Fit gaskets and bolt down Maintenance door 2 17-Feb-17 20-Feb-17 0%
A3650 Lift and float to position (1off) Maintenance door 7 17-Dec-16 A 17-Feb-17 88.89%
Component 7/9 163 26-Jul-16 A 15-Feb-17
A3680 Weld out component 7/9 to component 5 Joint and NDT welding 1 26-Jul-16 A 14-Feb-17 99%
A3790 Lift and float to position (1off) Maintenance door 1 13-Dec-16 A 14-Feb-17 50%
A3800 Fit gaskets and bolt down Maintenance door 1 14-Feb-17 15-Feb-17 0%
Component 4.5 3 05-Oct-16 A 15-Feb-17
A3910 Weld out component 4.5 to component 3 Joint and NDT welding 2 05-Oct-16 A 15-Feb-17 99%
7.2 - Flue Gas RAH 8 13-Feb-17 21-Feb-17
Component 14 1 13-Feb-17 13-Feb-17
A3070 Final handover component 1 13-Feb-17 13-Feb-17 0%
Component 15 1 13-Feb-17 13-Feb-17
A3130 Final handover component 1 13-Feb-17 13-Feb-17 0%
Component 16 5 13-Feb-17 17-Feb-17
A3190 Final handover component 1 13-Feb-17 13-Feb-17 0%

Actual Work Critical Remaining Work Summary Page 3 of 8 TASK filters: Ducting, In Progress.
Remaining Work Milestone Oracle Corporation
Kusile Boiler 2- Mechanical Work Schedule_20160204 Classic Schedule Layout 20-Feb-17 08:41
Activity ID Activity Name Original Start Finish Activity % Comment December 2016 January 2017
Duration Complete
28 04 11 18
A3150 Bolt down & torque bolts on Flexible Expansion Bellow 2 15-Feb-17 17-Feb-17 0%
A3140 Fit (1off) Flexible Bellow on component 16 and do fit-up inspection 3 13-Feb-17 15-Feb-17 0%
Component 17 8 13-Feb-17 21-Feb-17
A27560 Access PJFF 0 13-Feb-17 0%
A3250 Final handover component 1 13-Feb-17 14-Feb-17 0%
A3210 Bolt down & torque bolts on Flexible Expansion Bellow 2 18-Feb-17 21-Feb-17 0%
A3240 Clean components 2 13-Feb-17 14-Feb-17 0%
A3200 Fit (1off) Flexible Bellow on component 17 and do fit-up inspection 3 17-Feb-17 21-Feb-17 0%
7.4 - Flue Gas Duct to ID Fan 15 13-Feb-17 03-Mar-17
Install Flue Gas To ID Fan Comp 1 10 13-Feb-17 22-Feb-17
A27550 Access PJFF (MHPSA TO SUPPLY) 0 13-Feb-17 0%
A2970 Final Handover Component 1 1 22-Feb-17 22-Feb-17 0%
A2950 Bolt down & torque bolts on Flexible Expansion Bellow 2 17-Feb-17 20-Feb-17 0%
A2960 Clean component 1 (Cleanliness Protocols) 2 20-Feb-17 22-Feb-17 0%
A2930 Fit (1off) Flexible Bellow on component 1 and do fit-up inspection 5 13-Feb-17* 17-Feb-17 0%
Install Flue Gas To ID Fan Comp 2 10 17-Feb-17 03-Mar-17
A3000 Final Handover Component 2 1 02-Mar-17 03-Mar-17 0%
A2980 Bolt down & torque bolts on Flexible Expansion Bellow 2 22-Feb-17 28-Feb-17 0%
A2990 Clean component 2 (Cleanliness Protocols) 2 28-Feb-17 02-Mar-17 0%
A2940 Fit (1off) Flexible Bellow on component 2 and do fit-up inspection 5 17-Feb-17 22-Feb-17 0%

Extra Work 42 13-Feb-17 03-Apr-17

SI Instruction 0 13-Feb-17 13-Feb-17


SI Instructions Recieved 0 13-Feb-17 13-Feb-17
SI Document 0931 0 13-Feb-17 13-Feb-17
A27620 Recieved SI 0 13-Feb-17 0%
SI Document (Khumbulani 2) 0 13-Feb-17 13-Feb-17
A27650 Requested For SI 0 13-Feb-17* 0%
A27660 Recieved SI 0 13-Feb-17 0%
SI Document (Khumbulani 3) 0 13-Feb-17 13-Feb-17
A28270 Requested For SI 0 13-Feb-17* 0%
A28290 Recieved SI 0 13-Feb-17 0%
SI Work 42 13-Feb-17 03-Apr-17
SI 0904 Rewelding On Pin Rack 19 13-Feb-17 07-Mar-17
A27450 Inspection 0 04-Mar-17 0%
A27460 NDTs 0 06-Mar-17 0%
A27470 Replace Insulation 0 06-Mar-17 0%
A27480 Remove Scaffolding 0 07-Mar-17 0%
A27390 NDTs 1 14-Feb-17 15-Feb-17 0%
A27400 Remove covers on Leaf Seals and Housekeeping 1 15-Feb-17 16-Feb-17 0%
A27410 Preparations for window welds 1 16-Feb-17 17-Feb-17 0%
A27420 Rig Window into position 1 17-Feb-17 18-Feb-17 0%
A27380 Inspection 2 13-Feb-17 14-Feb-17 0%
A27430 Dogg and Tack window 4 18-Feb-17 23-Feb-17 0%
A27440 Weld Window 4 23-Feb-17 03-Mar-17 0%
SI 0931 4.1 Burner Erosion Modifications 40 13-Feb-17 03-Apr-17
16 Meter Level 28 13-Feb-17 16-Mar-17
Burner Bottom Section 28 13-Feb-17 16-Mar-17
A27760 Touch-up Painting all affected ares (by others) 0 16-Mar-17 0%
A27670 Obtain Permit to work / Lift all equipment to work area 3 13-Feb-17 15-Feb-17 0%
A27690 Mark out & cut bottom part of Burner casing as per Site Instruction drawing 3 15-Feb-17 18-Feb-17 0%
A27720 Weld out "new" erotion plates as per welding sequence & information then NDT the
3 welds
02-Mar-17
bottom 06-Mar-17 0%
A27730 Prep bottom part of Burner casing for re-fitment of access plate that was cut, prep3casing
06-Mar-17
plate 08-Mar-17 0%
A27740 Re-align, Fit & Tack weld casing plate i n original position 3 08-Mar-17 11-Mar-17 0%
A27700 Mark out installation are for "new" erotion plates. Prep, Fit & Tack weld "new" er otion
4 18-Feb-17
plates top- QC fi tup inspec
22-Feb-17
tion 0%
A27710 Weld out "new" erotion plates as per welding sequence & information then NDT the
4 welds
22-Feb-17
top 02-Mar-17 0%
A27750 Weld out casing plate as per welding sequence & information then NDT the welds5 11-Mar-17 16-Mar-17 0%

Actual Work Critical Remaining Work Summary Page 4 of 8 TASK filters: Ducting, In Progress.
Remaining Work Milestone Oracle Corporation
Kusile Boiler 2- Mechanical Work Schedule_20160204 Classic Schedule Layout 20-Feb-17 08:41
Activity ID Activity Name Original Start Finish Activity % Comment December 2016 January 2017
Duration Complete
28 04 11 18
Ducting 25 15-Feb-17 16-Mar-17
A27780 Erect access scaffold to area where Baffle plate is to be installed (by Others) 0 15-Feb-17 0%
A27860 Touch-up Painting all affected ares (by others) 0 16-Mar-17 0%
A27880 Dismantle scaffolds (by others) 0 16-Mar-17 0%
A27800 Mark out the profile of the "new" Baffle plate on boths sides (outside) Duct component,
1 22-Feb-17
and remove IPE stiffeners
23-Feb-17 0%
A27810 Cut slots in the Duct component casing on both sides as per profile marks 1 23-Feb-17 28-Feb-17 0%
A27820 Slide "new" Baffle plate from one side into slots, Align & Tack weld 2 28-Feb-17 02-Mar-17 0%
A27830 Weld out "new" Baffle plates as per welding sequence & information then NDT the2wel
02-Mar-17
ds ( Outside of duct only)
04-Mar-17 0%
A27840 Prep IPE stiffeners & Toungue plates, Prep Duct casing then Fit & Tack weld all - QC
2 04-Mar-17
fitup inspection 07-Mar-17 0%
A27850 Weld out IPE stiffeners & Toungue plates as per welding sequence & information then
2 07-Mar-17
NDT the welds 08-Mar-17 0%
24 Meter Level 26 15-Feb-17 18-Mar-17
Burner Bottom Section 26 15-Feb-17 18-Mar-17
A29010 Touch-up Painting all affected ares (by others) 0 18-Mar-17 0%
A28970 Weld out "new" erotion plates as per welding sequence & information then NDT the
2 welds
04-Mar-17
bottom 07-Mar-17 0%
A28930 Obtain Permit to work / Lift all equipment to work area 3 15-Feb-17 18-Feb-17 0%
A28940 Mark out & cut bottom part of Burner casing as per Site Instruction drawing 3 18-Feb-17 22-Feb-17 0%
A28950 Mark out installation are for "new" erotion plates. Prep, Fit & Tack weld "new" er otion
3 22-Feb-17
plates top- QC fi tup inspec
28-Feb-17
tion 0%
A28980 Prep bottom part of Burner casing for re-fitment of access plate that was cut, prep3casing
07-Mar-17
plate 10-Mar-17 0%
A28990 Re-align, Fit & Tack weld casing plate i n original position 3 10-Mar-17 13-Mar-17 0%
A28960 Weld out "new" erotion plates as per welding sequence & information then NDT the
4 welds
28-Feb-17
top 04-Mar-17 0%
A29000 Weld out casing plate as per welding sequence & information then NDT the welds5 13-Mar-17 18-Mar-17 0%
Ducting 23 18-Feb-17 18-Mar-17
A29020 Erect access scaffold to area where Baffle plate is to be installed (by Others) 0 18-Feb-17 0%
A29090 Touch-up Painting all affected ares (by others) 0 18-Mar-17 0%
A29100 Dismantle scaffolds (by others) 0 18-Mar-17 0%
A29030 Mark out the profile of the "new" Baffle plate on boths sides (outside) Duct component,
1 28-Feb-17
and remove IPE stiffeners
01-Mar-17 0%
A29040 Cut slots in the Duct component casing on both sides as per profile marks 1 01-Mar-17 02-Mar-17 0%
A29050 Slide "new" Baffle plate from one side into slots, Align & Tack weld 2 02-Mar-17 04-Mar-17 0%
A29060 Weld out "new" Baffle plates as per welding sequence & information then NDT the2wel
04-Mar-17
ds ( Outside of duct only)
07-Mar-17 0%
A29070 Prep IPE stiffeners & Toungue plates, Prep Duct casing then Fit & Tack weld all - QC
2 07-Mar-17
fitup inspection 08-Mar-17 0%
A29080 Weld out IPE stiffeners & Toungue plates as per welding sequence & information then
2 08-Mar-17
NDT the welds 10-Mar-17 0%
26 Meter Level 28 18-Feb-17 24-Mar-17
Burner Bottom Section 28 18-Feb-17 24-Mar-17
A29190 Touch-up Painting all affected ares (by others) 0 24-Mar-17 0%
A29110 Obtain Permit to work / Lift all equipment to work area 3 18-Feb-17 22-Feb-17 0%
A29120 Mark out & cut bottom part of Burner casing as per Site Instruction drawing 3 22-Feb-17 28-Feb-17 0%
A29130 Mark out installation are for "new" erotion plates. Prep, Fit & Tack weld "new" er otion
3 28-Feb-17
plates top- QC fi tup inspec
03-Mar-17
tion 0%
A29160 Prep bottom part of Burner casing for re-fitment of access plate that was cut, prep3casing
11-Mar-17
plate 15-Mar-17 0%
A29170 Re-align, Fit & Tack weld casing plate i n original position 3 15-Mar-17 18-Mar-17 0%
A29150 Weld out "new" erotion plates as per welding sequence & information then NDT the
4 welds
08-Mar-17
bottom 11-Mar-17 0%
A29140 Weld out "new" erotion plates as per welding sequence & information then NDT the
4 welds
03-Mar-17
top 08-Mar-17 0%
A29180 Weld out casing plate as per welding sequence & information then NDT the welds5 18-Mar-17 24-Mar-17 0%
Ducting 25 22-Feb-17 24-Mar-17
A29200 Erect access scaffold to area where Baffle plate is to be installed (by Others) 0 22-Feb-17 0%
A29270 Touch-up Painting all affected ares (by others) 0 24-Mar-17 0%
A29280 Dismantle scaffolds (by others) 0 24-Mar-17 0%
A29210 Mark out the profile of the "new" Baffle plate on boths sides (outside) Duct component,
1 03-Mar-17
and remove IPE stiffeners
04-Mar-17 0%
A29220 Cut slots in the Duct component casing on both sides as per profile marks 1 04-Mar-17 06-Mar-17 0%
A29230 Slide "new" Baffle plate from one side into slots, Align & Tack weld 2 06-Mar-17 07-Mar-17 0%
A29240 Weld out "new" Baffle plates as per welding sequence & information then NDT the2wel
07-Mar-17
ds ( Outside of duct only)
09-Mar-17 0%
A29250 Prep IPE stiffeners & Toungue plates, Prep Duct casing then Fit & Tack weld all - QC
2 09-Mar-17
fitup inspection 11-Mar-17 0%
A29260 Weld out IPE stiffeners & Toungue plates as per welding sequence & information then
2 11-Mar-17
NDT the welds 14-Mar-17 0%
28 Meter Level 28 22-Feb-17 28-Mar-17
Burner Bottom Section 28 22-Feb-17 28-Mar-17
A29370 Touch-up Painting all affected ares (by others) 0 28-Mar-17 0%
A29290 Obtain Permit to work / Lift all equipment to work area 3 22-Feb-17 28-Feb-17 0%

Actual Work Critical Remaining Work Summary Page 5 of 8 TASK filters: Ducting, In Progress.
Remaining Work Milestone Oracle Corporation
Kusile Boiler 2- Mechanical Work Schedule_20160204 Classic Schedule Layout 20-Feb-17 08:41
Activity ID Activity Name Original Start Finish Activity % Comment December 2016 January 2017
Duration Complete
28 04 11 18
A29300 Mark out & cut bottom part of Burner casing as per Site Instruction drawing 3 28-Feb-17 03-Mar-17 0%
A29310 Mark out installation are for "new" erotion plates. Prep, Fit & Tack weld "new" er otion
3 03-Mar-17
plates top- QC fi tup inspec
07-Mar-17
tion 0%
A29340 Prep bottom part of Burner casing for re-fitment of access plate that was cut, prep3casing
15-Mar-17
plate 18-Mar-17 0%
A29350 Re-align, Fit & Tack weld casing plate i n original position 3 18-Mar-17 22-Mar-17 0%
A29330 Weld out "new" erotion plates as per welding sequence & information then NDT the
4 welds
11-Mar-17
bottom 15-Mar-17 0%
A29320 Weld out "new" erotion plates as per welding sequence & information then NDT the
4 welds
07-Mar-17
top 10-Mar-17 0%
A29360 Weld out casing plate as per welding sequence & information then NDT the welds5 22-Mar-17 28-Mar-17 0%
Ducting 25 28-Feb-17 28-Mar-17
A29380 Erect access scaffold to area where Baffle plate is to be installed (by Others) 0 28-Feb-17 0%
A29450 Touch-up Painting all affected ares (by others) 0 28-Mar-17 0%
A29460 Dismantle scaffolds (by others) 0 28-Mar-17 0%
A29390 Mark out the profile of the "new" Baffle plate on boths sides (outside) Duct component,
1 07-Mar-17
and remove IPE stiffeners
07-Mar-17 0%
A29400 Cut slots in the Duct component casing on both sides as per profile marks 1 07-Mar-17 08-Mar-17 0%
A29410 Slide "new" Baffle plate from one side into slots, Align & Tack weld 2 08-Mar-17 10-Mar-17 0%
A29420 Weld out "new" Baffle plates as per welding sequence & information then NDT the2wel
10-Mar-17
ds ( Outside of duct only)
13-Mar-17 0%
A29430 Prep IPE stiffeners & Toungue plates, Prep Duct casing then Fit & Tack weld all - QC
2 13-Mar-17
fitup inspection 15-Mar-17 0%
A29440 Weld out IPE stiffeners & Toungue plates as per welding sequence & information then
2 15-Mar-17
NDT the welds 16-Mar-17 0%
33 Meter Level 28 28-Feb-17 03-Apr-17
Burner Bottom Section 28 28-Feb-17 03-Apr-17
A29550 Touch-up Painting all affected ares (by others) 0 03-Apr-17 0%
A29470 Obtain Permit to work / Lift all equipment to work area 3 28-Feb-17 03-Mar-17 0%
A29480 Mark out & cut bottom part of Burner casing as per Site Instruction drawing 3 03-Mar-17 07-Mar-17 0%
A29490 Mark out installation are for "new" erotion plates. Prep, Fit & Tack weld "new" er otion
3 07-Mar-17
plates top- QC fi tup inspec
09-Mar-17
tion 0%
A29520 Prep bottom part of Burner casing for re-fitment of access plate that was cut, prep3casing
18-Mar-17
plate 22-Mar-17 0%
A29530 Re-align, Fit & Tack weld casing plate i n original position 3 22-Mar-17 25-Mar-17 0%
A29510 Weld out "new" erotion plates as per welding sequence & information then NDT the
4 welds
14-Mar-17
bottom 18-Mar-17 0%
A29500 Weld out "new" erotion plates as per welding sequence & information then NDT the
4 welds
09-Mar-17
top 14-Mar-17 0%
A29540 Weld out casing plate as per welding sequence & information then NDT the welds5 25-Mar-17 03-Apr-17 0%
Ducting 25 03-Mar-17 03-Apr-17
A29560 Erect access scaffold to area where Baffle plate is to be installed (by Others) 0 03-Mar-17 0%
A29630 Touch-up Painting all affected ares (by others) 0 03-Apr-17 0%
A29640 Dismantle scaffolds (by others) 0 03-Apr-17 0%
A29570 Mark out the profile of the "new" Baffle plate on boths sides (outside) Duct component,
1 09-Mar-17
and remove IPE stiffeners
10-Mar-17 0%
A29580 Cut slots in the Duct component casing on both sides as per profile marks 1 10-Mar-17 11-Mar-17 0%
A29590 Slide "new" Baffle plate from one side into slots, Align & Tack weld 2 11-Mar-17 14-Mar-17 0%
A29600 Weld out "new" Baffle plates as per welding sequence & information then NDT the2wel
14-Mar-17
ds ( Outside of duct only)
16-Mar-17 0%
A29610 Prep IPE stiffeners & Toungue plates, Prep Duct casing then Fit & Tack weld all - QC
2 16-Mar-17
fitup inspection 17-Mar-17 0%
A29620 Weld out IPE stiffeners & Toungue plates as per welding sequence & information then
2 17-Mar-17
NDT the welds 20-Mar-17 0%
SI (Khumbulani 2) Installation Of Delta Wings 35 13-Feb-17 24-Mar-17
Installation on Right Hand Side Duct 35 13-Feb-17 24-Mar-17
A30080 Conduct MHPSA Inspection 1 21-Mar-17 21-Mar-17 0%
A30060 Housekeeping & MRPE Inspection 2 18-Mar-17 20-Mar-17 0%
A29960 Lift to position Top (4m OD) plate and supports, Fit & tack weld 3 13-Feb-17 15-Feb-17 0%
A29970 Weld out (2off) Delta plates & Supports, NDT as per requirement 3 18-Feb-17 22-Feb-17 0%
A29980 Lift to position 8off (2m OD) plate and supports and Fit & tack weld 3 28-Feb-17 02-Mar-17 0%
A29990 Lift to position 2off (3m OD) plate and supports, Fit & tack weld 3 11-Mar-17 15-Mar-17 0%
A30000 Weld out (8off) Delta plates & Supports, NDT as per requirement 3 02-Mar-17 06-Mar-17 0%
A30010 Erect scaffold inside 7.2 comp 15 (Access for 2.2m & 3m OD plates) 3 06-Mar-17 08-Mar-17 0%
A30020 Lift to position 2off (2.2m OD) plate and supports, Fit & tack weld 3 09-Mar-17 11-Mar-17 0%
A30040 Weld out (4off) Delta plates & Supports, NDT as per requirement 3 15-Mar-17 18-Mar-17 0%
A30090 Lift to position Bottom (4m OD) plate and supports, Fit & tack weld 3 15-Feb-17 18-Feb-17 0%
A30110 Dismantle Scaffold 3 22-Mar-17 24-Mar-17 0%
A30070 Erect scaffold inside 7.2 comp 13 (Access for 2m OD plates) 4 22-Feb-17 27-Feb-17 0%
Installation on Left Hand Side Duct 35 13-Feb-17 24-Mar-17
A30230 Conduct MHPSA Inspection 1 21-Mar-17 21-Mar-17 0%

Actual Work Critical Remaining Work Summary Page 6 of 8 TASK filters: Ducting, In Progress.
Remaining Work Milestone Oracle Corporation
Kusile Boiler 2- Mechanical Work Schedule_20160204 Classic Schedule Layout 20-Feb-17 08:41
Activity ID Activity Name Original Start Finish Activity % Comment December 2016 January 2017
Duration Complete
28 04 11 18
A30210 Housekeeping & MRPE Inspection 2 18-Mar-17 20-Mar-17 0%
A30120 Lift to position Top (4m OD) plate and supports, Fit & tack weld 3 13-Feb-17 15-Feb-17 0%
A30130 Weld out (2off) Delta plates & Supports, NDT as per requirement 3 18-Feb-17 22-Feb-17 0%
A30140 Lift to position 8off (2m OD) plate and supports and Fit & tack weld 3 28-Feb-17 02-Mar-17 0%
A30150 Lift to position 2off (3m OD) plate and supports, Fit & tack weld 3 11-Mar-17 15-Mar-17 0%
A30160 Weld out (8off) Delta plates & Supports, NDT as per requirement 3 02-Mar-17 06-Mar-17 0%
A30170 Erect scaffold inside 7.2 comp 15 (Access for 2.2m & 3m OD plates) 3 06-Mar-17 08-Mar-17 0%
A30180 Lift to position 2off (2.2m OD) plate and supports, Fit & tack weld 3 09-Mar-17 11-Mar-17 0%
A30200 Weld out (4off) Delta plates & Supports, NDT as per requirement 3 15-Mar-17 18-Mar-17 0%
A30240 Lift to position Bottom (4m OD) plate and supports, Fit & tack weld 3 15-Feb-17 18-Feb-17 0%
A30260 Dismantle Scaffold 3 22-Mar-17 24-Mar-17 0%
A30220 Erect scaffold inside 7.2 comp 13 (Access for 2m OD plates) 4 22-Feb-17 27-Feb-17 0%
SI (Khumbulani 3) 1.3 Evase Modifications 31 13-Feb-17 20-Mar-17
Evase LHS 27 13-Feb-17 15-Mar-17
A28280 Material take off according to the engineering drawings 0 13-Feb-17 0%
A28320 Request for scaffolding to access the ground situated on the ground 0 15-Feb-17 0%
A28330 Request for scaffolding to access inside of the PA fan 0 15-Feb-17 0%
A28370 Request QC inspection (fit up) 0 18-Feb-17 0%
A28390 NDT the plates 0 22-Feb-17 0%
A28400 Apply paint over weld joints 0 22-Feb-17 0%
A28430 Request QC inspection 0 25-Feb-17 0%
A28450 NDT the plates 0 02-Mar-17 0%
A28460 Apply paint over welded joints 0 02-Mar-17 0%
A28490 NDT part 4 0 06-Mar-17 0%
A28510 Request QC inspection 0 07-Mar-17 0%
A28530 NDT part 3 0 08-Mar-17 0%
A28570 NDT part 5.0 0 11-Mar-17 0%
A28300 Install rigging material (lugs and rigging gear) 1 13-Feb-17 13-Feb-17 0%
A28310 Top and tail the evase, rigging the evase to the ground, evase must lay on its side1 14-Feb-17 14-Feb-17 0%
A28340 Prep the plates for welding activities (stiffeners and vains) 1 15-Feb-17 15-Feb-17 0%
A28350 Measure and mark out areas for stiffeners 1 16-Feb-17 16-Feb-17 0%
A28410 Measure and mark out areas for veins 1 23-Feb-17 23-Feb-17 0%
A28470 Install Part 4 (discharge backing plate)inside the evase 1 03-Mar-17 03-Mar-17 0%
A28500 Fit and tack weld Part 3 (discharge backing plate)inside the PA fan 1 07-Mar-17 07-Mar-17 0%
A28520 Weld Part 3 (discharge backing plate)inside the PA fan ) 1 08-Mar-17 08-Mar-17 0%
A28540 Cut Item 5.0 as per engineering instruction 1 09-Mar-17 09-Mar-17 0%
A28550 Fit and tack Item 5.0 inside the evase (ground level) 1 10-Mar-17 10-Mar-17 0%
A28560 Weld Item 5.0 according to applicable procedure 1 11-Mar-17 11-Mar-17 0%
A28580 Rig the evase box back to position 1 13-Mar-17 13-Mar-17 0%
A28590 Align the evase with the PA fan and ducting i tem 1.3 1 14-Mar-17 14-Mar-17 0%
A28600 Install the flexible mebrane as per provided basing eng drawing 1 15-Mar-17 15-Mar-17 0%
A28360 Fit and tack weld the plates (Part 2 to 2.4) 2 17-Feb-17 18-Feb-17 0%
A28420 Fit and tack weld the veins (Item 1 to Item 5) 2 24-Feb-17 25-Feb-17 0%
A28480 Weld Part 4 (discharge backing plate)inside the evase 2 04-Mar-17 06-Mar-17 0%
A28380 Weld the stiffeners according applicable welding procedure (2 to 2.4) 3 20-Feb-17 22-Feb-17 0%
A28440 Weld the vein according to applicable welding procedure (Item 1 to Item 5.0) 4 27-Feb-17 02-Mar-17 0%
Evase RHS 31 13-Feb-17 20-Mar-17
A28610 Material take off according to the engineering drawings 0 13-Feb-17 0%
A28640 Request for scaffolding to access the ground situated on the ground 0 16-Feb-17 0%
A28650 Request for scaffolding to access inside of the PA fan 0 16-Feb-17 0%
A28690 Request QC inspection (fit up) 0 21-Feb-17 0%
A28710 NDT the plates 0 25-Feb-17 0%
A28720 Apply paint over weld joints 0 25-Feb-17 0%
A28750 Request QC inspection 0 01-Mar-17 0%
A28770 NDT the plates 0 07-Mar-17 0%

Actual Work Critical Remaining Work Summary Page 7 of 8 TASK filters: Ducting, In Progress.
Remaining Work Milestone Oracle Corporation
Kusile Boiler 2- Mechanical Work Schedule_20160204 Classic Schedule Layout 20-Feb-17 08:41
Activity ID Activity Name Original Start Finish Activity % Comment December 2016 January 2017
Duration Complete
28 04 11 18
A28780 Apply paint over welded joints 0 07-Mar-17 0%
A28810 NDT part 4 0 10-Mar-17 0%
A28830 Request QC inspection 0 11-Mar-17 0%
A28850 NDT part 3 0 13-Mar-17 0%
A28890 NDT part 5.0 0 16-Mar-17 0%
A28620 Install rigging material (lugs and rigging gear) 1 14-Feb-17 14-Feb-17 0%
A28630 Top and tail the evase, rigging the evase to the ground, evase must lay on its side1 15-Feb-17 15-Feb-17 0%
A28660 Prep the plates for welding activities (stiffeners and vains) 1 16-Feb-17 16-Feb-17 0%
A28670 Measure and mark out areas for stiffeners 1 17-Feb-17 17-Feb-17 0%
A28730 Measure and mark out areas for veins 1 27-Feb-17 27-Feb-17 0%
A28790 Install Part 4 (discharge backing plate)inside the evase 1 08-Mar-17 08-Mar-17 0%
A28820 Fit and tack weld Part 3 (discharge backing plate)inside the PA fan 1 11-Mar-17 11-Mar-17 0%
A28840 Weld Part 3 (discharge backing plate)inside the PA fan ) 1 13-Mar-17 13-Mar-17 0%
A28860 Cut Item 5.0 as per engineering instruction 1 14-Mar-17 14-Mar-17 0%
A28870 Fit and tack Item 5.0 inside the evase (ground level) 1 15-Mar-17 15-Mar-17 0%
A28880 Weld Item 5.0 according to applicable procedure 1 16-Mar-17 16-Mar-17 0%
A28900 Rig the evase box back to position 1 17-Mar-17 17-Mar-17 0%
A28910 Align the evase with the PA fan and ducting i tem 1.3 1 18-Mar-17 18-Mar-17 0%
A28920 Install the flexible mebrane as per provided basing eng drawing 1 20-Mar-17 20-Mar-17 0%
A28680 Fit and tack weld the plates (Part 2 to 2.4) 2 20-Feb-17 21-Feb-17 0%
A28740 Fit and tack weld the veins (Item 1 to Item 5) 2 28-Feb-17 01-Mar-17 0%
A28800 Weld Part 4 (discharge backing plate)inside the evase 2 09-Mar-17 10-Mar-17 0%
A28700 Weld the stiffeners according applicable welding procedure (2 to 2.4) 3 23-Feb-17 25-Feb-17 0%
A28760 Weld the vein according to applicable welding procedure (Item 1 to Item 5.0) 4 03-Mar-17 07-Mar-17 0%

Actual Work Critical Remaining Work Summary Page 8 of 8 TASK filters: Ducting, In Progress.