05work ProgramREV5CTK
05work ProgramREV5CTK
05work ProgramREV5CTK
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
A. CONCEPTUAL ALIGNMENT DETAIL
B. PRELIMINARY DESIGN STAGE - PED ACTIONS BY CONSULTANT
B1 AIRBORNE LIDAR & GROUND SURVEY ACTIONS BY LBU
B2 PRELIMINARY ALIGNMENT DESIGN ACTIONS BY OTHERS
B3 DESKTOP STUDY 1 PUE MILESTONE
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
D DETAILED DESIGN STAGE - DED
D1 DED DESKTOP STUDY
D1i) Hydrology Analysis
D1ii) Bridge Structural Analysis and Design
D1iii) Geotechnical Engineering Analysis and Design
D2 ROAD, BRIDGE, GEOTECHNICAL AND DRAINAGE DED 1
D2i) Production of Drawings and Design Reports
D2ii) Submission of First Draft
D3 ROAD SAFETY AUDIT 3
D4 ROAD, BRIDGE, GEOTECHNICAL AND DRAINAGE DED 1
D4i) Production of Drawings and Design Reports
D4ii) Submission of Final Draft
D5 PROGRESSIVE DESIGN CHECK BY LBU
E PROCUREMENT
E1 TENDER DOCUMENTATION & TENDER DRAWINGS 1
E1i) Production of Drawings
E1ii) Submission of Tender Documentation and Tender Drawings
SUBMISSION OF DETAILED DESIGN DRAWINGS FOR ROAD SAFETY AUDIT 4
ROAD SAFETY AUDIT 4 Part 1
SUBMISSION OF DETAILED DESIGN DRAWINGS FOR ROAD SAFETY AUDIT 4
E1i) Production of Drawings
E1ii) Submission of Final Detailed Design Drawings
E2 TENDERING PROCESS
E3 TENDER EVALUATION AND NEGOTIATION
E4 LBU APPROVAL & WPC LETTER OF AWARD
Note:
The timeline of this work program shall commence based on the date of LOI
RSA 4 Part 2 (50% progress of construction works)
RSA 4 Part 3 (During the pre-opening of the project)
RSA 5 (3 to 8 months after the opening of the project)
SARAWAK
CONSTRUCTION
45 MONTHS
CONSTRUCTION
45 MONTHS
PROPOSED DEVELOPMENT AND UPGRADING OF THE PAN BORNEO HIGHWAY IN T
P2S3 - MENGKALAP IMMIGRATION CHECKPOINT TO MERAPOK (L
MILESTONE WORKS PROGRAM
WORK PROGRAM 2016 20
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
A. CONCEPTUAL ALIGNMENT DETAIL 119 01/12/16 30/03/17
B4 DESKTOP STUDY 1
B4i) Hydrology Analysis 18 03/06/17 21/06/17
B6 DESKTOP STUDY 2
B6i) Geotechnical Engineering Analysis and Preliminary Design 18 03/06/17 21/06/17
B12 SUBMISSION OF PED PROPOSAL & COSTING TO GOM (CABINET MEETING) 14/08/17
G PROCUREMENT
G1 TENDER DOCUMENTATION & TENDER DRAWINGS 1
G1i) Production of Drawings 30 01/10/17 31/10/17
2017 2018
MAY JUN JUL AUG SEPT OCT NOV DEC JAN FEB MAR APR MAY JUN
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
ACTIONS BY CONSULTANT (New Schedule)
ACTIONS BY LBU (Scheduled)
ACTIONS BY LBU (New Schedule)
ACTIONS BY OTHERS (Scheduled)
ACTIONS BY OTHERS (New Schedule)
PUE MILESTONE
MILESTONE