Chapter 3 Check List

The document provides a checklist for the Songad Small Hydel Project located in Uttarakhand, India. It summarizes that detailed surveys, designs, hydrological studies, and cost estimates have been completed for the 2 x 3500 kW project. The project will provide 39.09 MkWh of saleable energy annually and cost Rs. 4.03 per kWh to generate power, making it an economically viable scheme for meeting rural power needs in the region. Construction will be carried out by contractors and is estimated to cost a total of Rs. [value not provided].

Uploaded by

Deepak
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views3 pages

Chapter 3 Check List

The document provides a checklist for the Songad Small Hydel Project located in Uttarakhand, India. It summarizes that detailed surveys, designs, hydrological studies, and cost estimates have been completed for the 2 x 3500 kW project. The project will provide 39.09 MkWh of saleable energy annually and cost Rs. 4.03 per kWh to generate power, making it an economically viable scheme for meeting rural power needs in the region. Construction will be carried out by contractors and is estimated to cost a total of Rs. [value not provided].

Uploaded by

Deepak
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

SONGAD SHP DPR

CHAPTER 3

CHECK LIST
1 NAME OF THE PROJECT Songad Small Hydel Project
2. LOCATION
a. State Uttarakhand
b. District Uttarkashi
c. Tehsil Uttarkashi
3. CATEGORY OF THE PROJECT
a. Small Hydel Hydroelectric scheme with a total 2 x 3500 KW
installed capacity upto 25000 KW
4. PLANNING
Has the overall development of the stream/canal Yes
been prepared and stages of development
discussed ?
Have the alternative proposals been studied and Yes
their merits and demerits discussed ?
Have the detailed topographical surveys been
carried out for the following items and drawings Yes
prepared as per prescribed scales ?
a. Head work surveys (weir or diversion structure) Yes
b. Desilting tank (not required) Yes
c. Water conductor system Yes
d. Forebay Yes
e. Penstock. Yes
f. Power house, Tailrace etc. Yes
5. GEOLOGY Yes
6. FOUNDATION INVESTIGATIONS
Have the general surveys regarding construction Yes, as applicable and
materials like pervious and impervious soils, sands, necessary
aggregates, etc. been carried out ?
7. HYDROLOGICAL & METEOROLOGICAL INVESTIGATIONS
Have the hydrological investigations been carried Yes
out and status of discharge data of stream/canal
discussed in reports?
8. HYDROLOGY
Have hydrological studies been carried out to Yes
establish the availability of water for the benefits 50% Dependability
envisaged, and what is the dependability of the
potential ?

III-1
SONGAD SHP DPR

9. LAND ACQUISITION & RE-SETTLEMENT


(Whenever Applicable)
Have the provisions for land acquisition and Yes-provision for land
resettlement been considered ? acquisition has been made.
Have the socio-economic problems involved in Re-settlement not
resettlement been investigated & discussed? involved
10 DESIGN
.
Has the layout of the project area viz., location of
diversion structure, powerhouse etc. been
finalized?
Have the preliminary designs been prepared for Yes
the following components?
a. Diversion Weir. Yes
b. Penstock and water conductor system, etc. Yes
c. Power house etc. Yes
11. POWER BENEFITS
Have the following been discussed ?
a. Total energy production and installed capacity of Yes
the system
b. How does the scheme fit into overall development Power station being
of power of the region ? (as applicable ). developed for meeting the
power requirements in
especially rural areas of
Uttarakhand
c. Energy generation from the project, firm power etc. Saleable energy -
39.09 MkWh (1-15 years)
32.06 MkWh (16-35 years)
d. Proposal for transmission and/or connecting to the
existing system, etc. (wherever applicable). 33 KV single circuit line upto
the 33 KV substation at
Bhatwari of UPCL for
evacuation of power

e. Cost of generation per kw installed as compared to Yes, it is very much


the various micro hydel projects and services in the comparable being Rs. 4.03
region of justify the economic viability of the per Kwh (Levellised)
scheme.
12 CONSTRUCTION PROGRAMME

III-2
SONGAD SHP DPR

.
Are the major components of work proposed to be Through Contractor
done departmentally of through contractor ?
Have the quantities of the following items been Yes
worked out for various components of the project ?
a.Excavation soft & hard strata Yes
b.Earthwork in filling (wherever applicable) Yes
c.Stone for masonry Yes
d.Coarse aggregated for concrete Yes
e.Steel for reinforcement. Yes
f.Other materials P.O.L., Electricity Yes
13 ESTIMATE
.
a. Is the estimate prepared ? Yes
b. Have the analysis of rates for various major items
and the components of the project been furnished,
with basis of analysis & the price index ? Yes
14 ECONOMICAL & ENVIRONMENTAL ASPECTS
.
Is the area likely to the environmental and No Environmental and
ecological problems due to the altered surface ecological degradation
water pattern and preventive/corrective measures
discussed ? (wherever applicable)
15 CAMP AND BUILDINGS :
.
Has the planning of the camps/building been
done? Yes
16 SOIL CONSERVATION
.
Is the need for soil conservation measures in the Not applicable
project discussed ?

********

III-3