TRANSPORTATION MANAGEMENT
AT
PROCON ENGINEERING
Section: Z
Acknowledgment
Note of thanks to our course instructor, Sir Faiz ul Islam, who provided us an
opportunity of visiting an organization as part of our academics. We gained
knowledge about how the Supply Chain Management practices
-Transportation Management in particular - are carried out in an organization
and its vitality in operations. The whole project was of great value to us. This
would not have been possible without our teachers constant guidance and
assistance throughout the term. Thank you very much sir!
Contents
INTRODUCTION
Products:
Today, Procon supplies finished products of high quality to car ,truck, bus,
motorcycle, pickup & tractor manufacturers like:
Step 1
Step 2
Step 3
The PPMC then develops a Daily, Weekly and Monthly schedule for the
Production which is displayed on a large white board in every production
plant.
Step 4
INBOUND LOGISTICS:
Coils/Sheets: Cold Rolled, Hot Rolled Special Steel: Alloy Steel Base
Material: Pig Iron
Lead Time: 120 Days preparation. 22 to 30 days shipping (Avg), means order
MUST be placed FOUR months before.
CARRIERS:
1. APL Pakistan
METHOD:
COMPANY clears the shipment from the PORT as they are allowed duty relief
under SRO 577(I)/2005 for OEMs else importer have to pay duty.
Received from port and carried to destination via TRUCKS (containers) by the
customer who has ordered it from Auto Steel Int.
Step 5
Delivery Schedule Report: The person then mentions all the deliveries of the
required material due in that day, week and month along with the names of
suppliers and quantities.
Step 6
Some suppliers provide the materials at the company themselves while the
others indicate that materials are ready on which the Procon orders the
collection of material through its transporters ready in the premises (Milk
Run).
Step 7:
Step 8:
OUTBOUND LOGISTICS
Tucks are CUSTOMIZED in such a way that trolleys are easily moved
in/out and parked inside in the designed slots.
PROCESS Overview
Order Placement
by Customer
(OEMs)
PPMC
Department
Material Orders
Shortag
Requireme communicat
e
nt ed to
respective
Suppliers
Warehouse Production
Plants
(Store
Manager)
Imported Inventor
Items/mater y check
ials Supply
of Imported Local Press Shops
Items/materi Items/Mater
Local als ials
Items/Mater Lamination
ials
Supply
of
Stitching
Chemical
Finished
CUSTOMERS Goods
Dispatch Area
(OEMs) Inventory
CONCLUSION:
The given information and analysis of the company implies the fact that Procon Engineering has
emerged as a major player in the AutoPart industry, by keeping itself aligned with the latest
information and technologies prevailing in related industry globally through effective forecasting
and projecting of needs. From recognizing the vitality of the transportation management system
in sustainability and growth of a company to adjusting with changing needs - Procon
Engineering has shown remarkable efficiency as theyve opted the Lean Strategy which results in
decrease of holding/carrying cost with the benefit of quality material. The Transportation
Management is one sector which demands constant vigilance mainly due to the fact that it is
associated with cost, especially in such a company like Procon where the material and product
requirement changes every month. . Theyve hired a professional and experienced team to deal
with their Inventory who works day and night to ensure timely and seamless supply of goods to
their customers. Their main focus is not to let the stoppage of production of their customers due
to their fault in any case for which they even have to stretch more than their limit by by buying
out the material and parts from local suppliers (not their regular supplier) as well as delivering
through contract and non-regular transporters. This involves risk of conformance and may
damage their quality standard but they do it in order to ensure timely delivery of products.
Contingency Plans are reviewed weekly no matter if they are used or not. A good relationship
exists between the Production Planning and Material Control Department (PPMC) and the
vendors so that both perform hand in hand to ensure supplibility. There is usually no blame game
when it comes to fulfill the demand despite error on either side. Theyve developed some
effective Key Performance Indicators with time which have played a key role in their continuous
progress and more contracts.
------------------------------------------------------------------------------------------------------------
---------
PROFILES:
Muhammad Mohiyuddin
General Manager
Quality Assurance Department
Production Planning & Material Control
Habibuddin Sharf
Managing Director
Auto Steel International