1) INTRODUCTION
1.1) Project Overview
Experience has taught us that every customer and his needs are unique. We pride
ourselves in meeting these individual needs. We manufacture custom made shutters as
per client requirements.
We offer premium quality steel Rolling Shutters. These include all types of Industrial
shutters and doors. Automated Sliding Gates. Aluminums Shutters (Alulux). Rolling
Grills. MS Rolling Shutters. Push and Pull Shutters. Electrically Operated Shutters. GI
1
Project Report Resource management System
Rolling Shutters. Remote controlled Shutters. Automated Grill Shutters. Gear Operated
Shutters etc. We use high grade materials such as SS.. MS.. GI and Aluminums to
ensure optimum strength of the shutters. We are specialists in motorized rolling
shutters.
Our customer oriented approach enables us to work with each client at an individual
level to determine the best product for them. Beginning with the design process. we
help you decide the best product that will fit your applications and budget without
compromising on quality. Right from manufacturing to installation of the shutters and
providing after sales services. we make every effort to provide you with a product and
service you deserve.
2
Project Report Resource management System
2) SYSTEM ANALYSIS
In our existing system all the transaction of stock details, customer entry, are done
manually, So taking more time for a transaction like updating details and also for
searching of employee and customer entry. Another major disadvantage is that to
preparing the list of employee, customer and the available employee, customer in the
organization will take more time; currently it is doing as a one day process for verifying
all records. So after conducting the feasibility study we decided to make the manual
organization management system to be computerized.
To increase accuracy. For easy sorting of customer, stock, employee. Easy to maintain
the list of customer, stock, employee detail and the available customer, stock, employee
details in the organization. For rapid update of customer, stock, employee in
organization database and improved circulation capability. To overcome all the
drawbacks, limitation of existing system. To make the work easy, comfortable, and
manageable. This can manage the time properly. It will be user friendly as no extra
training is required
4
Project Report Resource management System
3) Feasibility study
Economical Feasibility is whatever we think need not be feasible .It is wise to think
about the feasibility of any problem we undertake. Feasibility is the study of impact,
which happens in the organization by the development of a system. The impact can be
either positive or negative. When the positives nominate the negatives, then the system
is considered feasible. Here the feasibility study can be performed in two ways such as
technical feasibility and Economical Feasibility.
5
Project Report Resource management System
management, it is likely that there is management support and the system will be
accepted and used. However, it is also important that the employee base will be
accepting of the change. The essential questions that help in testing the operational
feasibility of a system include the following:
6
Project Report Resource management System
7
Project Report Resource management System
Input Data
The goal of designing input data is to make enter easy, logical and free from errors as
Possible. The entering data entry operators need to know the allocated space for each
field; field sequence and which must match with that in the source document. The
format in which the data fields are entered should be given in the input form. It makes
use of processor that accepts commands and data from the operator through a keyboard.
The input required is analyzed by the processor. It is then accepted or rejected.
o Data Recording
o Data Transcription
o Data Conversion
o Data Verification
o Data Control
o Data Transmission
o Data Correction
One of the aims of the system analyst must be to select data capture method and devices,
which reduce the number of stages so as to reduce both the changes of errors and the
cost.
8
Project Report Resource management System
External
Internal
Operational
Computerized
Interactive
Input files can exist in document form before being input to the computer. Input Design
is rather complex since it involves procedures for capturing data as well as inputting it
to the computer.
Outputs from computer systems are required primarily to communicate the results of
processing to users. They are also used to provide a permanent copy of these result for
latter consultation .Computer output is the most important and direct source of
information to the users. Designing computer output should proceed in an organized
well throughout the manner. The right output must be available for the people who find
the system easy to use. The outputs have been defined during the logical design stage.
If not, they should defined at the beginning of the output designing terms of types of
output connect, format, response etc.
o External outputs
o Internal outputs
o Operational outputs
o Interactive outputs
o Turn around outputs
All screens are informative and interactive in such a way that the user can full fill his
requirements through asking queries.
9
Project Report Resource management System
o Controlled Redundancy
o Data independence
o Accurate and integrating
o More information at low cost
o Recovery from failure
o Privacy and security
o Performance
o Ease of learning and use
Implementation is the stage in the project where the theoretical design is turned into a
working system. The implementation phase constructs, installs and operates the new
system. The most crucial stage in achieving a new successful system is that it will work
efficiently and effectively.
There are several activities involved while implementing a new project they are
The successful implementation of the new system will purely upon the involvement of
the Officers working in that department. The officers will be imparted the necessary
training on the new technology.
The education of the end user start after the implementation and testing is over. When
the system is found to be more difficult to understand and complex, more effort is put
to educate the end used to make them aware of the system, giving them lectures about
the new system and providing them necessary documents and materials about how the
system can do this.
After providing the necessary basic training on the computer awareness, the users will
have to be trained upon the new system such as the screen flows and screen design type
of help on the screen, type of errors while entering the data , the corresponding
validation check at each entry and the way to correct the data entered. It should then
cover information needed by the specific user or group to use the system.
Is the menu bar displayed in the appropriate contested some system related features
included either in menus or tools? Do pull Down menu operation and Tool-bars work
properly? Are all menu function and pull down sub function properly listed ?; Is it
possible to invoke each menu function using a logical assumptions that if all parts of
11
Project Report Resource management System
the system are correct, the goal will be successfully achieved .? In adequate testing or
non-testing will leads to errors that may appear few months later.
2. The effect of the system errors on files and records within the system
The purpose of the system testing is to consider all the likely variations to which it will
be suggested and push the systems to limits. The testing process focuses on the logical
intervals of the software ensuring that all statements have been tested and on functional
interval is conducting tests to uncover errors and ensure that defined input will produce
actual results that agree with the required results.
Program level testing, modules level testing integrated and carried out.
White box sometimes called Glass box testing is a test case design uses the control
structure of the procedural design to drive test case. Using white box testing methods,
the following tests were made on the system
A) All independent paths within a module have been exercised once. In our system,
ensuring that case was selected and executed checked all case structures. The bugs that
were prevailing in some part of the code where fixed
b) All logical decisions were checked for the truth and falsity of the values.
12
Project Report Resource management System
Black box testing focuses on the functional requirements of the software. This is black
box testing enables the software engineering to derive a set of input conditions that will
fully exercise all functional requirements for a program. Black box testing is not an
alternative to white box testing rather it is complementary approach that is likely to
uncover a different class of errors that white box methods like..
1) Interface errors
3) Performance errors
shown in parentheses)
The user identification is that which is required by the Operating system for access to
its file system. This command will normally be the first command transmitted by the
user after the control connections are made .
PASSWORD (PASS)
This command must be immediately preceded by the user name command, completes
the user's identification for access control. Since password information is quite
sensitive, it is desirable in general to "mask" it or suppress type out.
Forgot password:
13
Project Report Resource management System
It allows the user to regain the password if because of means it is lost or forgotten. With
the help of some security question you can change or regain a password.
8) Conclusion:
We conclude from our software that this project makes ledgering related
with the shop easy and nearly computerized, most possibly it is tried to
make perfect. The extent of the project is noticeable, when the system
comes into practice of many people. Password facility is provided for the
users, without entering correct password no one can use this software.
We feel glad and honoured to conclude this report. This is our best
experience to perform such professional work. Developing such a system
was really exciting, a wealth for information and a very good opportunity
14
Project Report Resource management System
(Or first from this Student World in the Professional World makes
overwhelmed.)
This project provides a very good user interface for the user with a quick
response to their provided information.
The main objective behind this project is to make ledgering activity related
with the shops very easy for the shop authority.
The system has been designed at the maximum possible excellence. Still
we accept drawbacks as it is a human effort.
15
Project Report Resource management System
Apart from these there is scope for generating many more features. This
software can be extended easily without affecting the functionality.
10) Bibliography
16
Project Report Resource management System
Visited websites:-
Visited websites:-
1 www.google.com
2 www.w3school.com
Visited websites:-
3 www.wikipedia.com
4 www.a1java.com
Visited websites:-
11) Appendix
DFD SYMBOLS:-
18
Project Report Resource management System
Data store
19
Project Report Resource management System
Run it
Log in
Main form
Stock details
20
Project Report Resource management System
Employee details
Personal details
Stock table:-
21
Project Report Resource management System
Customer table:-
Item Table:
Purchase Bill:
22
Project Report Resource management System
Sales Bill:
Supplier table:
23
Project Report Resource management System
Login form
Main form
Home Screen:-
Item details:-
24
Project Report Resource management System
25
Project Report Resource management System
26
Project Report Resource management System
Login form:-
27
Project Report Resource management System
28