Marble Tiles Manufacturing Unit
Marble Tiles Manufacturing Unit
Marble Tiles Manufacturing Unit
Note: All PASDEC Services / information related to PM's Youth Business Loan are Free of Cost
December, 2013
Table of Contents
1. DISCLAIMER......................................................................................................................................................... . 2
2. PURPOSE OF THE DOCUMENT ... ............................................................................................................... ... 3
3. INTRODUCTION TO PASDEC ... .................................................................................................................... .. 3
4. INTRODUCTION TO SCHEME ..................................................................................................................... ... 4
5. EXECUTIVE SUMMARY ... .............................................................................................................................. .. 4
6. BRIEF DESCRIPTION OF PROJECT AND PRODUCT ............................................................................ . 4
7. CRITICAL FACTORS... ....................................................................................................................................... . 5
8. INSTALLED AND OPERATIONAL CAPACITIES...................................................................................... . 6
9. GEOGRAPHICAL POTENTIAL FOR INVESTMENT... ............................................................................ . 6
10. POTENTIAL TARGET MARKETS AND CITIES ... .......................................................................... ... 6
11. PRODUCTION PROCESS FLOW ... ........................................................................................................ .. 7
12. PROJECT COST SUMMARY ... .............................................................................................................. ... 7
12.1 PROJECT ECONOMICS ... .................................................................................................................... ... 7
12.2 PROJECT FINANCING ... ....................................................................................................................... .. 8
12.3 PROJECT COST ... ................................................................................................................................ .. 8
12.4 SPACE REQUIREMENT ... .................................................................................................................... ... 8
12.5 FURNITURE AND FIXTURES ................................................................................................................. .. 9
12.6 MACHINERY AND EQUIPMENT ... .......................................................................................................... . 9
12.7 RAW MATERIAL REQUIREMENTS ........................................................................................................ .. 9
12.8 HUMAN RESOURCE REQUIREMENT ... .............................................................................................. .. 10
12.9 REVENUE GENERATION ... ................................................................................................................. .. 10
12.10 OTHER COSTS ... ................................................................................................................................... . 10
13. CONTACTS ... .............................................................................................................................................. .. 10
14. ANNEXURES ... ........................................................................................................................................... .. 12
14.1 INCOME STATEMENT (W ITH 10 YEARS PROJECTIONS) ... ................................................................ . 12
14.2 CASH FLOWS (W ITH 10 YEARS PROJECTIONS) ............................................................................. ... 13
14.3 BALANCE SHEET (W ITH 10 YEARS PROJECTIONS) ... ...................................................................... . 14
14.4 USEFUL PROJECT MANAGEMENT TIPS ... ................................................................................. .. 15
15. KEY ASSUMPTIONS.................................................................................................................................. . 17
1. DISCLAIMER
This information memorandum is to introduce the subject matter and provide a
general idea and information on the subject. Although, the material included in this
document is based on data / information gathered from various reliable sources;
however, it is based upon certain assumptions which may differ from case to case.
The information has been provided on as is where is basis without any warranties
or assertions as to the correctness or soundness thereof. Although, due care and
diligence has been exercised to compile this document, the contained information
may vary due to any change in any of the concerned factors, and the actual results
may differ substantially from the presented information. PASDEC, its employees or
agents do not assume any liability for any financial or other loss resulting from this
memorandum in consequence of undertaking this activity. The contained
information does not preclude any further professional advice. The prospective
user of this memorandum is encouraged to carry out additional diligence and
gather any information which is necessary for making an informed decision,
including taking professional advice from a qualified consultant / technical expert
before taking any decision to act upon the information.
For more information on services offered by PASDEC, please contact our website:
www.pasdec.org.pk
PASDEC Services / Information related to PMs Youth Business Loan are FREE OF COST - 2
2. PURPOSE OF THE DOCUMENT
The objective of the pre-feasibility study is primarily to facilitate potential
entrepreneurs in project identification for investment. The project pre-feasibility
may form the basis of an important investment decision and in order to serve this
objective, the document / study covers various aspects of project concept
development, start-up, production, marketing, finance and business management.
The purpose of this document is to facilitate potential investors in Marble Tiles
Manufacturing Unit by providing them with a general understanding of the
business with the intention of supporting potential investors in crucial investment
decisions.
The need to come up with pre-feasibility reports for undocumented or minimally
documented sectors attains greater imminence as the research that precedes
such reports reveal certain thumb rules; best practices developed by existing
enterprises by trial and error, and certain industrial norms that become a guiding
source regarding various aspects of business set-up and its successful
management.
Apart from carefully studying the whole document one must consider critical
aspects provided later on, which form basis of any investment decision.
3. INTRODUCTION TO PASDEC
June 2006 for development of marble and granite sector of Pakistan. The mandate
the sector. PASDEC has established fifteen Mechanized Quarries, two machinery
pools, two warehouses and work is in progress on three marble cities, four common
facility training centers. Besides this PASDEC has trained more than 1400 trainees
4. INTRODUCTION TO SCHEME
Prime Ministers Youth Business Loan is for young entrepreneurs, with an
allocated budget of Rs. 5.0 Billion for the year 2013-14, is designed to provide
subsidised financing at 8% mark-up per annum for one hundred thousand
(100,000) beneficiaries, through designated financial institutions, initially by The
National Bank of Pakistan (NBP) and The First Women Bank Ltd. (FWBL).
Loans from Rs. 0.1 million to Rs. 2.0 million with tenure up to 8 years inclusive of 01
year grace period and a debt : equity of 90 : 10 will be disbursed to SME
beneficiaries across Pakistan, covering; Punjab, Sindh, Khyber Pakhtunkhwah,
Baluchistan, Gilgit Baltistan, Azad Jammu &Kashmir and Federally Administered
Tribal Areas (FATA).
5. EXECUTIVE SUMMARY
Marble Tiles Manufacturing Plant is proposed to be located at or near Marble
Processing clusters of, Gujranwala, Lahore, Lasbela, Multan, Peshawar,
Rawalpinidi, Rawat, Risalpur, Swat, Buner and Quetta, also where basic
infrastructure is available for easy transportation of raw material and finished
goods. Products include 1 cm thick tiles, of 11.5x11.5 and 11.5x23.
The proposed project will have the Installed capacity of 187,200 sq. ft per year
whereas during the first year, the plant will operate at 50% capacity to produce
93,600 sq. ft/year, and increasing at the annual rate of 3% per year.
The total Project Cost is Rs. 2,172,000, including the Capital Cost of 1,330,000,
and the Working Capital of Rs. 842,000. Given the cost assumptions IRR,
payback, and NPV are 47%, 1.5 years, and Rs. 10,986,491 respectively, hence
making the project viable.
Product: The unit will initially process 14 sooter Gutka (about 1.75 inches
thick sheet), and 9 sooter Slab/Sheet (around 1.1 inch thick), into 3 Tiles
(1cm thickness), and 2 Tiles (1 cm thickness) respectively. Though the
project will be capable of producing many varieties of marble and onyx with the
small Tiles to a minimum of 4 Width x 12 Length, but its main focus will be
upon the highly demanded sizes.
Profitability: The Financial Analysis shows that the unit will be profitable
from the very first year of operation.
7. CRITICAL FACTORS
The following factors should be considered thoroughly:
PASDEC Services / Information related to PMs Youth Business Loan are FREE OF COST - 6
12. PROJECT COST SUMMARY
A detailed financial model has been developed to analyze the commercial viability of
the Marble Tiles Manufacturing Plant under the Prime Ministers Small Business Loan
Scheme. Various costs and revenues related assumptions along with results of the
analysis are outlined in this section.
The projected Income Statement, Cash Flow Statement and Balance Sheet are
attached as appendix.
The following table shows internal rate of return, payback period and NPV:
PASDEC Services / Information related to PMs Youth Business Loan are FREE OF COST - 7
Table 1 - Project Economics
Description Details
Internal Rate of Return (IRR) 47%
Payback Period (yrs) 1.5
Net Present Value (NPV) (Rs.)10,986,491
Returns on the scheme and its profitability are highly dependent on the efficiency of
efficient procurement system from marble suppliers, sound market knowledge and
trends about the international and domestic market, availability and retention of
skilled labour, suitable factory location, appropriate technology and effective
marketing campaign.
PASDEC Services / Information related to PMs Youth Business Loan are FREE OF COST - 8
the industry do not follow any set pattern. Following table shows calculations for
project space requirement on rental basis.
PASDEC Services / Information related to PMs Youth Business Loan are FREE OF COST - 9
12.8 Human Resource Requirement
The table above provides details of human resource required to run such a project
during working period of 312 days per annum per labor. Salaries of all employees are
estimated to increase at 10% annually.
13. CONTACTS
Majoka Traders
Business: Blades for Marble Machinery, Air Compressors, and Generator
Contact Person: Mr. Waseem Chiragh
Contact Detail: House No. 31, Asad Park, Phase II, Ahmed Block, Chuk No.
50., Shumali, Sargodha, Punjab.
EMAIL: [email protected]
Cell: 0333-3385278
N-Traders
Business: Marble Machinery, and Marble Stone Supply
Contact Person: Mr. Ilyas
PASDEC Services / Information related to PMs Youth Business Loan are FREE OF COST - 10
Contact Detail: Plot No. 100-110, Sector B, Street No. 2, Marble City
Gadani, Lasbela, Balochistan.
Contact Detail: 0346-2332552
MOD Minerals
Business: Mine Owner and Processor for Marble Blocks, Slabs, and Tiles
Contact Person: Mr. Haroon
Contact Detail: Marble City Gadani, Lasbela, Balochistan.
Email: [email protected]
Shashan Marble
Business: Mine Owner and Processor for Verona Marble Blocks, and Tiles
Contact Person: Mr. Gohram Bizinjo, Mr. Umer Farooq, and Mr. Saleem
Contact Detail: Marble City Gadani, Lasbela, Balochistan.
Email: [email protected]
Karkon Marble
Business: Marble Slabs, and Tiles
Contact Person: Mr. Sajid Aalam
Contact Detail: Pir Baala, Warsak Road, Peshawar.
Hanam Marble
Business: Marble and Onyx Slabs, and Tiles
Contact Person: Mr. Khurram Rangoonwala
Contact Detail: Raiti Pahaar, Manghopir Road.
Email: [email protected]
PASDEC Services / Information related to PMs Youth Business Loan are FREE OF COST - 11
14. ANNEXURES
PASDEC Services / Information related to PMs Youth Business Loan are FREE OF COST - 12
14.2 Cash Flows (With 10 Years Projections)
YEAR- 0 YEAR- 1 YEAR- 2 YEAR- 3 YEAR- 4 YEAR- 5 YEAR- 6 YEAR- 7 YEAR- 8 YEAR- 9 YEAR- 10
OPERATING ACTIVITIES
Net Profit - 984,616 1,383,199 1,835,734 2,343,281 2,912,883 3,551,203 4,265,590 5,064,146 5,955,800 6,922,764
Add:
Depreciation - 26,600 26,068 25,547 25,036 24,535 24,044 23,563 23,092 22,630 22,178
Amortization (Pre-operational Expenses) (2,000) 1,000 1,000 - - - - - - - -
Net profit before working capital changes (2,000) 1,012,216 1,410,267 1,861,281 2,368,317 2,937,418 3,575,247 4,289,154 5,087,238 5,978,431 6,944,941
Working Capital changes
Raw materials stock (236,000) (160,951) (15,878) (16,513) (17,174) (17,861) (18,575) (19,318) (20,091) (20,894) (21,730)
W.I.P - (13,189) (528) (549) (571) (593) (617) (642) (668) (694) (722)
Finished goods stock - (90,300) (3,612) (3,756) (3,907) (4,063) (4,226) (4,395) (4,570) (4,753) (4,943)
Accounts payable - 335,400 13,416 13,953 14,511 15,091 15,695 16,323 16,976 17,655 18,361
Accounts receivable - (546,000) (54,600) (60,060) (66,066) (72,673) (79,940) (87,934) (96,727) (106,400) (117,040)
Working capital changes (236,000) (475,040) (61,202) (66,926) (73,206) (80,099) (87,663) (95,966) (105,080) (115,087) (126,075)
- (70,192) (129,980) (214,647) (316,156) (450,721) (610,301) (802,177) (1,041,744) (1,309,240) (1,645,467)
Cash provided by/ used in operations (238,000) 466,983 1,219,085 1,579,708 1,978,954 2,406,598 2,877,284 3,391,011 3,940,414 4,554,103 5,173,399
FINANCING ACTIVITIES
Long term loan 1,954,800 (156,384) (201,553) (217,677) (235,091) (253,898) (274,210) (296,147) (319,839) - -
Owner equity 217,200
Dividend paid - (457,212) (626,609) (810,544) (1,013,562) (1,231,081) (1,470,451) (1,731,707) (2,011,201) (2,323,280)
Cash provided by/ used in Financing activities 2,172,000 (156,384) (658,765) (844,286) (1,045,635) (1,267,461) (1,505,291) (1,766,598) (2,051,545) (2,011,201) (2,323,280)
INVESTING ACTIVITIES
Capital Expenditure (1,330,000) - - - - - - - - -
Cash provided by/ used in Investing activities (1,330,000) - - - - - - - - - -
Net Cash Flow 604,000 310,599 560,321 735,422 933,319 1,139,138 1,371,992 1,624,412 1,888,868 2,542,902 2,850,119
Cash balance B/ F - 604,000 914,599 1,474,920 2,210,342 3,143,661 4,282,799 5,654,791 7,279,203 9,168,072 11,710,974
Cash balance C/ F 604,000 914,599 1,474,920 2,210,342 3,143,661 4,282,799 5,654,791 7,279,203 9,168,072 11,710,974 14,561,093
PASDEC Services / Information related to PMs Youth Business Loan are FREE OF COST - 13
14.3 Balance Sheet (With 10 Years Projections)
YEAR-0 YEAR - 1 YEAR - 2 YEAR - 3 YEAR - 4 YEAR - 5 YEAR - 6 YEAR - 7 YEAR - 8 YEAR - 9 YEAR - 10
ASSETS
Current Assets
Cash & Bank Balance 126,000 410,599 1,162,397 1,811,066 2,716,603 3,826,568 5,464,076 7,080,018 8,458,893 10,966,336 13,779,224
Raw materials stock 236,000 396,951 412,829 429,342 446,516 464,376 482,951 502,270 522,360 543,255 564,985
W.I.P - 13,189 13,717 14,266 14,836 15,430 16,047 16,689 17,356 18,051 18,773
Finished goods stock - 90,300 93,912 97,668 101,575 105,638 109,864 114,258 118,829 123,582 128,525
Receivables 546,000 600,600 660,660 726,726 799,399 879,338 967,272 1,064,000 1,170,399 1,287,439
Total Current Assets 362,000 1,457,040 2,283,455 3,013,002 4,006,256 5,211,411 6,952,277 8,680,507 10,181,438 12,821,623 15,778,946
Fixed Assets
At Cost less: Acc. Depreciation 1,330,000 1,303,400 1,277,332 1,251,785 1,226,750 1,202,215 1,178,170 1,154,607 1,131,515 1,108,885 1,086,707
Intangible Assets
Upfront Rent 480,000 504,000 529,200 555,660 583,443 612,615 643,246 675,408 709,179 744,638 781,869
Pre-operational Expenses Worth 1,000 1,000
TOTAL ASSETS 2,172,000 3,265,440 4,090,987 4,820,447 5,816,449 7,026,240 8,773,693 10,510,522 12,022,131 14,675,145 17,647,522
LIABILITIES AND EQUITY
Current Liabilities
Current maturity of long term loan 217,677 235,091 253,898 274,210 296,147 319,839 - - -
Accounts Payable - 335,400 348,816 362,769 377,279 392,371 408,065 424,388 441,364 459,018 477,379
Total Current Liabilities - 335,400 566,493 597,860 631,178 666,581 704,213 744,227 441,364 459,018 477,379
Noncurrent Liabilities
Long term Loan 1,954,800 1,954,800 1,798,416 1,596,863 1,300,479 1,046,581 772,370 476,223 - - -
EQUITY
Paid up Capital 217,200 217,200 217,200 217,200 217,200 217,200 217,200 217,200 217,200 217,200 217,200
Retained Earnings - 914,424 1,710,431 2,704,908 3,921,490 5,370,089 7,079,910 9,072,872 11,363,568 13,998,927 16,952,943
Total Equity 217,200 1,131,624 1,927,631 2,922,108 4,138,690 5,587,289 7,297,110 9,290,072 11,580,768 14,216,127 17,170,143
TOTAL LIABILITIES & EQUITY 2,172,000 3,265,440 4,090,987 4,820,447 5,816,449 7,026,240 8,773,693 10,510,522 12,022,131 14,675,145 17,647,522
PASDEC Services / Information related to PMs Youth Business Loan are FREE OF COST - 14
14.4 USEFUL PROJECT MANAGEMENT TIPS
Technology
List of Machinery & Equipment (As per Section 12.6)
Required Spare Parts & Consumables: Suppliers credit agreements and
availability as per schedule of maintenance be ensured before start of
operations.
Energy Requirement: Should not be overestimated or installed in excess and
alternate source of energy for critical operations be arranged in advance
Machinery Suppliers: Should be asked for training and after sales services
under the contract with the machinery suppliers. They must be communicated
about the timely availability with clear mutual understanding of the required
time period.
Quality Assurance Equipment & Standards: Required products quality
standards need to be defined on the packaging and a system to check them be
instituted, this improves credibility
Marketing
Product Development & Packaging: Expert's help may be engaged for
product packaging design & development
Sales & Distribution Network: Strong contacts with the civil works
contractors focusing upon house construction for middle class people and
owners of retail shops.
Price - Bulk Discounts, Cost plus Introductory Discounts: Price should
never be allowed to compromise quality. Price during introductory phase may
be lower and used as promotional tool. Product cost estimates should be
carefully documented before price setting. Government controlled prices shall
be displayed.
Human Resources
List of Human Resource (As per Section 12.8)
Adequacy & Competencies: Skilled and experienced staff should be
considered an investment even to the extent of offering share in business
profit.
Performance Based Remuneration: Attempt to manage human
resource cost should be focused through performance measurement and
performance based compensation.
PASDEC Services / Information related to PMs Youth Business Loan are FREE OF COST - 15
Training & Skill Development: Encouraging training and skill
development of self & employees through experts and exposure of best
practices is route to success. Least cost options for Training and Skill
Development (T&SD) may be linked with compensation benefits and awards.
PASDEC Services / Information related to PMs Youth Business Loan are FREE OF COST - 16
15. KEY ASSUMPTIONS
PRODUCTION ASSUMPTIONS
Maximum Capacity Utilization 100%
Maximum Capacity Utilization (Year-1) 50%
At 100% capacity, the following will be the per day production break-up;
Tiles (Sq.Ft) 100% 600
Total production per day 600
Per Annum 187,200
OPERATING ASSUMPTIONS
Annual Production Capacity(Tiles) year 1 93,600
Total Production Capacity (Year 1) 93,600
Growth Rate in Production (3%) OR (times) 1.03
Hours operational per day 8
Days operational per month 26
Days operational per year 312
REVENUE ASSUMPTIONS
Sales price per unit in year 1
Tiles 70
Sale price growth rate (10%) OR
(times) 1.1
PASDEC Services / Information related to PMs Youth Business Loan are FREE OF COST - 17
EXPENSES ASSUMPTIONS
Utilities 456,000
Machine maintenance Cost /year (% of total machinery
cost) 2%
Growth in maintenance cost 3 %) OR (times) 1.03
Pre-paid land rent (months) 480,000
Cost of raw limestone (Rs/Sq Feet) 5
Wastage margin per ton (kgs) 10%
Raw material cost growth rate 5%
Rent growth rate 5%
FINANCIAL ASSUMPTIONS
Project Life (Years) 10
Debt 90%
Equity 10%
Interest rate on long term loan 8%
Debt tenure (years) 8
Debt payments per year 12
Grace Period (Year) 1
PASDEC Services / Information related to PMs Youth Business Loan are FREE OF COST - 18