Assessment Master Template June 14 2007
Assessment Master Template June 14 2007
SCORE
Indicators Tools
5S and Housekeeping
Metrics and Continuous Improvement Process Standard Work
5.00
Lean/ Six Sigma Integration VSM Management
0.00
Supply Chain Integration Visual Controls
Skills
2.
3.
4.
5.
,
ce
a
te PT
t
ow
en
n gm
n n
s
k
an
e
io ai
ol
Si - I
or
em us
g
Fl
em
or
t
io Si
at h
s
in
en
tr
en
W
d ip
ov uo
re
ng
gr y C
Sc
on
ep
ag
Category
at x
an h
nt
su
rd
pr in
gr Si
hi
E rs
se d
C
ke
an
te pl
ll
ai
ou n
da
ea
ra
is
e
Im n
te /
In up
al
H Sa
tM
In an
M
CO ad
Co
bl
ve
an
M
su
Le
M
ta
Le
5
an
O
St
Vi
VS
Es
Pl
Jan 2006 2.00 1.00 1.00 4.00 2.00 3.00 4.00 1.00 1.00 3.00 3.00 3.00
Jun 2006 2.50 1.50 1.50 4.50 2.00 3.00 4.50 2.00 2.00 3.00 3.00 3.00
Current 2.63 3.58 1.42 4.75 2.69 4.00 4.50 2.00 1.58 4.50 3.00 3.22
5S and Housekeeping
- Regular audits for continuous improvement of 5S program
Principles: 5S System - Evidence of projects showing actions being generated and PLANT/ VSM: Arecibo
completed on the basis of the internal audits
- Plant wide program for 5S
Results - Implementation includes all support areas including DATE: April 3, 2007
Maintenance, Engineering, Finance, etc
AVERAGE
5S SYSTEM RESULTS
SCORE
Walkthrough and - Labeling or identification system is rudimentary and unclear; Daily cleaning of work area
Results Show Me - Inconsistent implementation
2
Walkthrough and
5S System Show Me Project - 5S implementation is completed in most areas
plans
Walkthrough and - Labeling system marks tools, processes, inventory and flow; Work areas and machines are clean and
Results Show Me organized
3
Walkthrough and - 5S system is standardized, well documented (checklist) and audited
5S System Show Me Project
plans - Evidence of continuous improvement efforts
Walkthrough and - Areas in production and support organizations are clean and well organized
Results Show Me - Widespread implementation throughout the manufacturing area
4
Walkthrough and - Regular audits for continuous improvement of 5S program
5S System Show Me Project
plans - Evidence of projects showing actions being generated and completed on the basis of the internal audits
Standard Work
- Routine review of leader standard work. Transitions between
leaders is eased by Std. Work
Principles: Leader Driven
- IPT and COE leaders champion standard work to drive
PLANT/ VSM: Arecibo
consistency throughout the organization
- All recurring operations and procedures covered by standard
work procedures. DATE: April 3, 2007
Usage - SW is used as daily working record by operators and
supervisors site-wide (Production and support)
-75% improvement in cycle times
Revision
1
Walkthrough and
- Documentation process is cumbersome and hinders revision
Process Show Me
Leader Walkthrough and - Limited accountability around Standard work. Largely a check the box exercise
Driven Show Me - Deployment inconsistent, some team leaders involved, some not.
Walkthrough and - Employee's daily routines vary depending on the needs of the day
Usage Show Me - Some evidence of standard work done in limited areas
Leader Walkthrough and - Strong evidence of standard work procedures in most areas
Driven Show Me - Some evidence on continuous improvement and revision control
Leader Walkthrough and - Routine review of subordinates standard work, regularly reviewed and revised
Driven Show Me - IPT and COE leaders understand value of standard work
-Standard Work forms are understood and used in production and support processes
Walkthrough and
Usage Show Me - SW used to support continuous improvement
- 50% improvement in cycle times
Leader Walkthrough and - Routine review of leader standard work. Transitions between leaders is eased by Std. Work
Driven Show Me - IPT and COE leaders champion standard work to drive consistency throughout the organization
5
Date printed: 04/23/2017 Page 3 of 15
Business Confidential - Merck & Co., Inc.
Whitehouse Station, NJ USA
Revision Walkthrough and - SW & Process definitions are easily revised to reflect best practices
5 Process Show Me - SW updates and improvements are routine
VSM Management
- Organization provides VSM information on a frequent and regular
Principles: basis (1/wk- 1/mth)
PLANT/ VSM: Arecibo
Information - Robust procedures in place for simple updates
- Multiple VSMs managed and routinely updated on a site basis
DATE: April 3, 2007
- CTE improved at least 30% from baseline
Site - VSM teams are all truly multifunctional, with representatives from
Involvement all functional areas, from engineering to labs, maintenance,
VSMs drive
Site AVERAGE
Information project
Involvement SCORE
initiation
Interview with MPS -VSMs are complete but are not being updated
Information and IPT Leader and
show me - Limited information and consistency across value stream maps
Site Interview with MPS
- Isolated VSM team
Involvement and IPT Leader
Interview with MPS - Maps are being updated on a regular (1 Mth) basis as improvements are made
Information and IPT Leader and - Consistent, inclusive maps with all required, pertinent information
show me
- CTE improved at least 20% from baseline
Site Interview with MPS
- Broad organizational involvement in development and review
Involvement and IPT Leader
Visual Controls
- Production / Cell / Quality & Performance metrics
communicated daily on work cell boards
Principles: Use of Visuals
- Visual controls evident at team, IPT, COE and site levels
PLANT/ VSM: Arecibo
- Quantified evidence of improvements
- Visuals are self-explanatory. Consistent use and
Clarity DATE: April 3, 2007
deployment.
Use of AVERAGE
Clarity Accountability
Visuals SCORE
Use of Visuals Walkthrough - No visual boards for production metrics or general communication
Clarity Walkthrough - Production, Opp, and Metrics are not tracked visually
1 Accountability Walkthrough Little or irregular review of visuals- too vague for action
Accountability Walkthrough Visuals lead to specific actions on small and large problems
3
- Production / Cell / Quality & Performance metrics communicated daily on work cell boards
Use of Visuals Walkthrough
- Widespread use of visual control includes action items and current status of actions
Clarity Walkthrough - Visuals contain necessary content. Some lapses in data consistency and timeliness
Accountability Visuals drive team activities and lead to specific actions for both team and process issues
4 Walkthrough
- Production / Cell / Quality & Performance metrics communicated daily on work cell boards
Use of Visuals Walkthrough - Visual controls evident at team, IPT, COE and site levels
- Quantified evidence of improvements
Accountability Walkthrough Visuals regularly analyzed to identify top problems and lead to root cause problem solving
5
MPS AVERAGE
IPT COE Site
Standards SCORE
MPS
1 Standards
IPT and COE leads No or limited knowledge of standards
MPS
2 Standards
IPT and COE leads - Some leaders know of the standards, used in some areas
Observe IPT Interactions & - Organization and COEs aligned around value streams.
COE Interview with Plant Manager - Some evidence of CI activities
Observe COE and IPT
Site Interactions & Interview with - Some radical changes in target areas with expectations for continual improvement
Plant Manager
MPS
3 Standards
IPT and COE leads - MPS leaders are aware of the standards and use them to support their MPS projects
Observe IPT Interactions & - COEs held accountable for performance goals and driving CI efforts
COE Interview with Plant Manager - All support functions are integrated into the COE - labs, Maintenance etc.
Observe COE and IPT - Broad goals for organization with appropriate accountability
Site Interactions & Interview with
Plant Manager - CI efforts being directly led by top site management
MPS
4 Standards
IPT and COE leads - High level of awareness amongst operators and supervisors around standards.
Observe IPT Interactions & - All COE members are aware of production needs, and respond rapidly
COE Interview with Plant Manager - Demonstrated evidence of COE CI and realization of site goals
Observe COE and IPT - Revolutionary Changes, Strong evidence of continuous improvements, aggressive targets
Site Interactions & Interview with
Plant Manager - Improvements directly tied into site financial targets and goals
Establishing Flow
- Balanced utilization based on required capacity
Principles: Customer Pull and synchronized according to flow/ efficiency PLANT/ VSM: Arecibo
- WIP reduced 80% from baseline
- Constant demand products are pulled through on
DATE: April 3, 2007
predictable cycle times
Level Flow/ Takt times - WIP, components, and final goods are flowed
based on use and pulled by customer (internal and
external) needs
Customer Pull Production Control - Production is pushed based on monthly forecast and MRP system
Level Flow/ Takt Interview Planner Buyer
- Production planning shows "hills" and "valleys" that drive higher inventory. No evidence of
times demand smoothing
Kanban Walkthrough and Interview Planner/
- Material is pushed through the system
Discipline Buyer & Material Handlers
1
Walkthrough and Interview Planner/
WIP Levels Buyer & Material Handlers - Production is batched. WIP is not managed
2
Walkthrough and Interview Planner/
WIP Levels Buyer & Material Handlers - WIP replacement is inconsistent and not capped
- Basic understanding of pull, key processes working directly to demand
Customer Pull Production Control - Pull established in some selective areas
- WIP reduced 50% from baseline
Level Flow/ Takt Interview Planner Buyer - Some leveling. Schedules show major part numbers into a routine sequence
times
Kanban Walkthrough and Interview Planner/ - Kanban is partially implemented and is occasionally followed
Discipline Buyer & Material Handlers - Several Kanban types are used to fit facility and process needs
- Inventory is managed but still driven by MRP.
3
Walkthrough and Interview Planner/
WIP Levels Buyer & Material Handlers - overproduction and underproduction still occurs regularly
- Demand is used to determine optimal cycle times and work is balanced with needs
Customer Pull Production Control - Majority of manufacturing driven by customer pull
- WIP reduced 65% from baseline
Level Flow/ Takt Interview Planner Buyer - Sequence of Rx is consistent. Rhythm wheel implemented where appropriate.
times
Kanban Walkthrough and Interview Planner/ - Many Kanban systems are in place, covering most operations, but deviations or disruptions
Discipline Buyer & Material Handlers are common
4
Walkthrough and Interview Planner/
WIP Levels Buyer & Material Handlers - Kanbans regulate inventory levels at most internal process sites
- Balanced utilization based on required capacity and synchronized according to flow/
Customer Pull Production Control efficiency
-- WIP reduced
Constant 80% from
demand baseline
products are pulled through on predictable cycle times
Level Flow/ Takt Interview Planner Buyer - WIP, components, and final goods are flowed based on use and pulled by customer (internal
times
and external) needs
Kanban Walkthrough and Interview Planner/ - Production is driven completely by highly disciplined kanban (pull signal) control
Discipline Buyer & Material Handlers - Pull system integrates into supply and materials as well as internal processes
- Kanban levels are managed and modified as demand/processes change.
5
Walkthrough and Interview Planner/
WIP Levels Buyer & Material Handlers -Optimized inventory levels at point of use
Date printed: 04/23/2017 Page 8 of 15
Business Confidential - Merck & Co., Inc.
Whitehouse Station, NJ USA
Continuous Improvement
- Workers fully responsible for initiating and leading daily waste
Waste
Principles: Elimination
elimination/ preventive problem solving PLANT/ VSM: Arecibo
- CI activities are identified and driven from area visual team boards
- All improvement projects (production and support) are prioritized in a
Prioritization DATE: April 3, 2007
site wide matrix
- Root Cause analysis ingrained into the culture of the organization
Root Cause
- Evidence of Root Cause analysis in all areas, from IPT teams through
Analysis
site staff
- Routine use of Kaizen events to focus resources on key problems
Kaizen and
identified as part of the overall CI initiative
Kaizen
- Kaizen events are a small part of the CI effort, with CI efforts also
Events
done at the team and six sigma project levels
Waste Observe IPT - Improvement activities only when necessary; Initiated by management using waste walks
Elimination Interactions - Improvements driven by events only. Such as Kaizen events or isolated projects
Prioritization Show Me List - Improvement are focused on specific areas/ the entire value stream is not considered
Root Cause Interview Line and - Most common response to problems is to work around. Some cause analysis
Analysis IPT Leaders - Evidence of old problems coming back
Kaizen and
2 Kaizen Events
IPT and COE leads - Some (drive-by) Kaizen events held, but are isolated events rather than part of larger CI initiatives
Plant Maintenance
Maintenance
Principles: Schedule
- Predictive Maintenance is used PLANT/ VSM: Arecibo
Equipment - Visual monitoring compared to historical expected
DATE: April 3, 2007
Monitoring operational performance (Use of SPC)
- Regular use of maintenance checklist by operators prior to
operation
Maintenance - Evidence of corrective actions being initiated by operators
Checklist due to their checks
- Minor repair and adjustments, where appropriate, being
addressed by operators.
Maintenance Interview
Maintenance - Maintenance schedule does not exist
Schedule
Equipment Interview
Maintenance - No monitoring- Equipment only fixed/ maintained when broken
Monitoring
Maintenance Interview
- Operators do not examine machinery before use
Checklist Maintenance & Line
Ownership
1 Mentality
Interview Line - Maintenance organization isolated from operation
Maintenance Interview
Maintenance - Maintenance schedule is ad hoc and hard to find
Schedule
Equipment Interview
Maintenance Monitoring of Critical Equipment Only. Majority of equipment only fixed/maintained when broken.
Monitoring
Maintenance Interview
- Operators do an ad hoc walk around before operation
Checklist Maintenance & Line
Ownership
2 Mentality
Interview Line - Operators are not expected to inspect equipment
Maintenance Interview
Maintenance - Maintenance schedule is regular and @ point of use
Schedule
Equipment Interview
- Regular monitoring of equipment
Monitoring Maintenance
Maintenance Interview
- Some standard maintenance checks before operation
Checklist Maintenance & Line
Ownership
3 Mentality
Interview Line - Inspection and cleaning by operators
Maintenance Interview
Maintenance - Appropriate timetable for preventive maintenance @ point of use
Schedule
Equipment Interview Visual and electronic monitoring of equipment. No historical trending or data analysis of operational
Monitoring Maintenance performance
Maintenance Interview
- Use of maintenance checklist by operators prior to operation
Checklist Maintenance & Line
Ownership
4 Mentality
Interview Line - Operators are trained to monitor and look for flaws
Maintenance Interview
Maintenance - Predictive Maintenance is used
Schedule
Equipment Interview
- Visual monitoring compared to historical expected operational performance (Use of SPC)
Monitoring Maintenance
Supplier
Demand Certification Shipment AVERAGE
Management and Frequency SCORE
Integration
Supplier - Purchasing from suppliers is divorced from production needs (completely separate and isolated
Interview Procurement &
Certification Warehouse & Quality organization)
and Integration - Suppliers are not trusted and are not partners
2 Frequency
Planner/ Buyer &
Warehouse
- Large infrequent shipments of materials, paper driven, little use of visuals
Demand Interview Planner/ Buyer & - Some demand variation are handled smoothly, others are not recognized quickly enough
Management Warehouse - 3 Inventory turns a year
Supplier - Suppliers linked into our customer demand planning
Interview Procurement &
Certification Warehouse & Quality - Evidence of suppliers being able to respond to our changes in demand
and Integration - Suppliers have limited view into our operations. Initial attempts to certify suppliers (>20%)
Shipment Interview Procurement & - Shipments begin to be aligned to short term usage requirements.
3
Planner/ Buyer &
Frequency Warehouse - Some suppliers use Kanban based systems to ship to Merck.
Demand Interview Planner/ Buyer & - Varying demand is recognized and managed on a daily basis
Management Warehouse - 6 Inventory turns a year
Supplier - Suppliers have linked JIT supply strategy to respond to our changes (driven by changes in customer
Interview Procurement &
Certification Warehouse & Quality demand).
and Integration - Suppliers have insight into our needs and objectives. Supplier certification >50%
Shipment Interview Procurement & - Fixed rhythm times, predictable cycle times for replenishment
4
Planner/ Buyer &
Frequency Warehouse - most key materials are pulled into the factory as they are consumed
-True changes in customer demand drive appropriate changes in the entire value stream
Demand Interview Planner/ Buyer &
- Signals implemented both up and downstream for receipt and delivery
Management Warehouse
- 12 Inventory turns a year
Shipment Interview Procurement & - Small frequent shipments, kanban driven (aligned with actual consumption), visual controls with little
5 Frequency
Planner/ Buyer &
Warehouse paper
Demand for - Cultural demand for six sigma/ lean skills throughout
skills organization
Program to
Demand Knowledge AVERAGE
leverage 6
for skills Management SCORE
sigma BBs
SCORE 4.50 4.50 4.50 4.50
COMMENTS:
Demand for skills Interview Line - Knowledge sharing networks are weak, informal or non existent
Knowledge
1 Management
Interview MPS Leader - Superficial fixes leads to reoccurring problems
Demand for skills Interview Line - Education about six sigma/ lean skills is ongoing
Knowledge
2 Management
Interview MPS Leader - No library of documented past projects for reference
Demand for skills Interview Line - Demand for six sigma/ lean skills in pockets of organization
Knowledge Interview MPS Leader - Documented evidence of GB and BB projects directly linked to MPS/lean initiatives
3 Management
- Programs meshing well, with BBs leading key MPS improvement projects
Program to leverage Interview Plant
Manager/ or MPS - GBs integrated into the MPS improvement plans, GBs being trained and leading Kaizen events and
6 sigma BBs Leader
other CI projects
Demand for skills Interview Line - Some demand for six sigma/ lean skills in the organization
Knowledge
- Projects clearly linked into the overall MPS strategy
4 Management
Interview MPS Leader
Demand for skills Interview Line - Cultural demand for six sigma/ lean skills throughout organization
Metrics and
Walkthrough - No core metrics and No metrics Continuous Improvement process in place
Continuous
and Show Me - Some education possible but No evidence of implementation
Improvement
1
Metrics and - Some Core Metrics in place
Walkthrough
Continuous - Some evidence of DMAIC process being utilized for continuous improvement
and Show Me
Improvement
2
Metrics and
Walkthrough - All Core Metrics in place
Continuous
and Show Me - Performance is analyzed but only some evidence of action plans and some controls established
Improvement
3
Metrics and - All Core Metrics in place and fully standardized within the site
Walkthrough
Continuous - Performance is rigorously analyzed and all unfavorable results are accompanied with action plans
and Show Me
Improvement and controls established
4
- All Core Metrics in place and fully standardized within the site. All employees fully understand the
metrics and are committed to improving performance
Metrics and
Walkthrough - Performance is rigorously analyzed and unfavorable results are accompanied with action plans and
Continuous
and Show Me controls established
Improvement
- Core Metrics are the basis of daily discussions and walkthroughs and have become the basis of
5 continuous improvement
Current
Category Comments
Score
SCORE
Indicators Tools
5S and Housekeeping
Metrics and Continuous Improvement Process Standard Work
5.00
Lean/ Six Sigma Integration VSM Management
0.00
Supply Chain Integration Visual Controls
Skills