Bill of Quantities: Item 1: Project Information

This document contains a bill of quantities for a pathways project in San Felipe Tantangan, South Cotabato. It outlines the materials, labor, and total costs for the project. Materials include cement, sand, gravel, and 134 pathways will be constructed using a 1:3:4 mixture ratio over 28 days. Labor will be provided by 2 masons and 2 helpers over 2.5 days. The total estimated project cost is 10,580 Philippine pesos.

Uploaded by

Alfredo Garcia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views4 pages

Bill of Quantities: Item 1: Project Information

This document contains a bill of quantities for a pathways project in San Felipe Tantangan, South Cotabato. It outlines the materials, labor, and total costs for the project. Materials include cement, sand, gravel, and 134 pathways will be constructed using a 1:3:4 mixture ratio over 28 days. Labor will be provided by 2 masons and 2 helpers over 2.5 days. The total estimated project cost is 10,580 Philippine pesos.

Uploaded by

Alfredo Garcia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

VRC-ENG FORM NO. 8003.2.4.

1-A 4/21/2017 3:46

BILL OF QUANTITIES
Item 1: Project Information
Project Title RP Pathways
Purpose Design,Budget and Implementation of RP pathways
Requesting BU VRC - RP
Location San Felipe Tantangan South Cotabato
Item2: Quantities
Particulars Qty Unit Amount Total

Mixture Ratio 1:3:4


134 Pcs Pathways
28 pcs of Pathways to be fabricate /day

I. Materials

Cement ( Mayon ) 21 bag 250.00 5,250.00


Washed Sand 2 cum 235.00 470.00
Gravel 3/4" Rounded 3 cum 620.00 1,860.00
Total Material Cost 7,580.00

Labor Costing
2 Mason @ 350 / day 2.5 days 700.00 1,750.00
2 Helper @ 250 / day 2.5 days 500.00 1,250.00
Total Labor Cost 3,000.00
Total Project Cost 10,580.00

PROJECT ESTIMATOR PROJECT COORDINATOR PROJECT CONTROL CLERK PROJECT IMPLEMENTOR PROJEC

____________________ _____________________ ______________________ __________________ _______________________


Signature over Printed Name Signature over Printed Name Signature over Printed Name Signature over Printed Name Signatu
VRC-ENG FORM NO. 8003.2.4.1-A 4/21/2017 3:46

BILL OF QUANTITIES
Item 1: Project Information
Project Title Chinese Quote
Purpose Design,Budget and Implementation ofChinese Quote
Requesting BU VRC - RP
Location San Felipe Tantangan South Cotabato
Item2: Quantities
Particulars Qty Unit Amount Total
Total Volume: .38214
Class A ( 1:2.5 :5 )
I. Materials
Cement
Sand
Gravel
8mm DRB

Total Material Cost -

Labor Costing
1 Carpenter 350 / day 0.5 day 350.00 175.00
1 Helper @ 250 / day 0.5 day 250.00 125.00
Total Labor Cost 300.00
Total Project Cost 300.00

PROJECT ESTIMATOR PROJECT COORDINATOR PROJECT CONTROL CLERK PROJECT IMPLEMENTOR PROJEC

____________________ _____________________ ______________________ __________________ _______________________


Signature over Printed Name Signature over Printed Name Signature over Printed Name Signature over Printed Name Signatu
/2017 3:46

IMS No.
Page No. 1 of 1
Target Start
Target End

% Labor Supplier

DMB
QPD
QPD

40%

TOR PROJECT INSPECTOR

_______________
me Signature over Printed Name
/2017 3:46

IMS No.
Page No. 1 of 1
Target Start
Target End

% Labor Supplier

#DIV/0!

TOR PROJECT INSPECTOR

_______________
me Signature over Printed Name