Cell Name Original Value Final Value: Target Cell (Max) $B$12 Profit 1360 1360

The document shows the results of a linear programming problem to maximize profit for The Beaver Creek Pottery Company given constraints on labor hours and clay pounds used. The target cell shows a profit of $1360 and the adjustable cells show 24 bowls and 8 mugs produced. Constraint cells show labor usage of 40 hours and clay usage of 120 pounds both at their limits.

Uploaded by

aydan akkus
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views4 pages

Cell Name Original Value Final Value: Target Cell (Max) $B$12 Profit 1360 1360

The document shows the results of a linear programming problem to maximize profit for The Beaver Creek Pottery Company given constraints on labor hours and clay pounds used. The target cell shows a profit of $1360 and the adjustable cells show 24 bowls and 8 mugs produced. Constraint cells show labor usage of 40 hours and clay usage of 120 pounds both at their limits.

Uploaded by

aydan akkus
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Target Cell (Max)

Cell Name Original Value Final Value


$B$12 Profit = 1360 1360

Adjustable Cells
Cell Name Original Value Final Value
$B$10 Bowls = 24 24
$B$11 Mugs = 8 8

Constraints
Cell Name Cell Value Formula Status Slack
$E$6 labor (hr/unit) Usage 40 $E$6<=$G$6 Binding 0
$E$7 clay (lb/unit) Usage 120 $E$7<=$G$7 Binding 0
Adjustable Cells
Final Reduced Objective Allowable Allowable
Cell Name Value Cost Coefficient Increase Decrease
$B$10 Bowls = 24 0 40 26.67 15
$B$11 Mugs = 8 0 50 30 20

Constraints
Final Shadow Constraint Allowable Allowable
Cell Name Value Price R.H. Side Increase Decrease
$E$6 labor (hr/unit) Usage 40 16 40 40 10
$E$7 clay (lb/unit) Usage 120 6 120 40 60
Sheet1

The Beaver Creek Pottery Company


maximize Z = 40x1 + 5
Products: Bowl Mug
Profit per unit: 40 50 Resources subject to:
Resources: Usage Constraint Available Left over
labor (hr/unit) 1 2 0 <= 40 40 1x1 + 2x2 <= 4
clay (lb/unit) 4 3 0 <= 120 120 4x1 + 3x2 <= 1
x1, x2 >= 0
Production:
Bowls =
Mugs =
Profit = 0

Page 3
Sheet1

maximize Z = 40x1 + 50x2

subject to:

1x1 + 2x2 <= 40


4x1 + 3x2 <= 120
x1, x2 >= 0