0% found this document useful (0 votes)
17 views

S.No Date 1 6/9/2016 2 7/9/2016 3 8/9/2016

The document lists 4 dates from June 9th to September 9th and tasks completed on those dates including: updating monthly reports by integrating files into a JSP and BIRT server; updating monthly ticket generation; participating in a demo; updating daily reports by modifying files on the server; and finalizing daily and monthly reports and integrating the system on the JSW server.

Uploaded by

Vamsi
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views

S.No Date 1 6/9/2016 2 7/9/2016 3 8/9/2016

The document lists 4 dates from June 9th to September 9th and tasks completed on those dates including: updating monthly reports by integrating files into a JSP and BIRT server; updating monthly ticket generation; participating in a demo; updating daily reports by modifying files on the server; and finalizing daily and monthly reports and integrating the system on the JSW server.

Uploaded by

Vamsi
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

S.

No Date
1 6/9/2016

2 7/9/2016

3 8/9/2016

4 9/9/2016
Task
Monthly Report Updations
Integrating the rptfiles into JSP and updating the BIRT at server
Updating Monthly Ticket generation,
Participated in demo
JSW Daily reports updations
Modifications rptdesign files into the server

Finalyzing the Daily and Monthly reports & system integration at JSW Server