This document summarizes two anaerobic digestion facilities constructed by FLI Energy. For the Farleigh Anaerobic Digestion Facility in Basingstoke, Hampshire, UK, FLI Energy provided engineering, procurement, and construction services for a facility with a 50,000 tonne per year capacity including digesters, storage tanks, depackaging lines, and a 1.5 MW CHP unit. For the Anaerobic Digestion facility at Crows Hall Farm in Attleborough, Norfolk, FLI Energy's scope included civil works and groundworks for a 30,000 tonne per year facility with digesters, storage lagoons, and a 1.56 MW CHP unit. Both facilities utilize food

Uploaded by

Obby Purba
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views5 pages

Case Studies

This document summarizes two anaerobic digestion facilities constructed by FLI Energy. For the Farleigh Anaerobic Digestion Facility in Basingstoke, Hampshire, UK, FLI Energy provided engineering, procurement, and construction services for a facility with a 50,000 tonne per year capacity including digesters, storage tanks, depackaging lines, and a 1.5 MW CHP unit. For the Anaerobic Digestion facility at Crows Hall Farm in Attleborough, Norfolk, FLI Energy's scope included civil works and groundworks for a 30,000 tonne per year facility with digesters, storage lagoons, and a 1.56 MW CHP unit. Both facilities utilize food

Uploaded by

Obby Purba
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Case StudiesBack to case studies

Farleigh Anaerobic Digestion Facility

Our E.P.C. wrapped delivery for this project encompasses a broad scope of activities including
demolition and ground-works, detailed civil and process design, pre-treatment equipment, waste
reception building, biogas plant construction and electrical grid connection.

Project Details
Client
Farleigh Biogas

Location
Basingstoke, Hampshire, UK

Further Information

AD Plant Details Summary


Processing capacity 50,000tpa

2 x 1,800m primary digesters

1 x 1,400m secondary digester

3 x 4,500m end storage tank

1 x 500m Buffer Tank

2 x 8t/h foodwaste depackaging lines

35m x 28m x 12m Reception Building

1 x 1,500 kWe CHP

3 x 10m Batch Pasteurisers

Odour Abatement System

Weighbridge

Site Office

Feedstocks

Packaged and source separated food waste plus waste organic liquids

Biogas Utilisation

Electricity to grid

1.5 MWe CHP

LV connection/distribution

Transformer

HV Substation connection

Civil Engineering & Design

All site civil engineering works and civils design carried out by FLI Energy
Site Clearance & Demolition

Site Access Road

Waste Reception Building

Site Bunding and Containment

Site Drainage

Site Hardstanding

Anaerobic Digestion - Crows Hall Farm


Processing capacity 30,000tpa

2 x 2,000m3 primary digesters

1 x 1,500m3 secondary digester

1 x 10,000m 3 end storage lagoon

Screw Press Separator

80m 3 solid feeder

1 x 1,560 kWe CHP

Weighbridge

Site Office

Project Details
Client
Crows Hall Farm

Location
Attleborough, Norfolk

Further Information

Tank and Equipment Foundations

Drainage

Lagoon Earthworks

Civil & Ground-works Design

Tank and Equipment Foundations

Drainage

Lagoon Earthworks

You might also like