Case Studies
Case Studies
Our E.P.C. wrapped delivery for this project encompasses a broad scope of activities including
demolition and ground-works, detailed civil and process design, pre-treatment equipment, waste
reception building, biogas plant construction and electrical grid connection.
Project Details
Client
Farleigh Biogas
Location
Basingstoke, Hampshire, UK
Further Information
Weighbridge
Site Office
Feedstocks
Packaged and source separated food waste plus waste organic liquids
Biogas Utilisation
Electricity to grid
LV connection/distribution
Transformer
HV Substation connection
All site civil engineering works and civils design carried out by FLI Energy
Site Clearance & Demolition
Site Drainage
Site Hardstanding
Weighbridge
Site Office
Project Details
Client
Crows Hall Farm
Location
Attleborough, Norfolk
Further Information
Drainage
Lagoon Earthworks
Drainage
Lagoon Earthworks