Sequential Steps For Potential Hazards Risk Safety Precautions/ Preventive Measures Controlled
Completion Of Work Arise From The Work Level To Control The Hazards Risk Level
To inform and get approval Communication 1 To arrange Site survey line work together with 1
from IFKM breakdown EHS personal and site management.
Owner,FMCS,Area Owner,
EHS Personal and M+W To ensure that the SAVE WORK PERMIT,
GROUP Safety Officer. authorization related permits are completed
before job initiation.
FMCS TEL: 8111
CORING WORKS
Electrical Core Drilling
Machine specially used at Electrical tools to be checked and tagged.
site for coring concrete Electrical hazard
wall penetration.Features 2 Electrical tools to comply with ELCB. 1
include a side guard and Trip hazard
Ensure work place is accessible and safe to
a drainage water outlet. A work.
clamp provided to firmly
secure the material during Falling object Check the site condition of any obstruction,
the cutting cycle. such as, debris and loose or flaking material.
Concrete Core drilling Barricade the work zone for maximum radius.
Falling from height
involves cutting circular
holes and removing core Tool should be secured with a nylon rope on
to allow for service such the erectors safety harness or body.
as sprinkler pipe Full body harnesses to be wear while Working
penetration. The above 6ft.
procedure involves bolting
a drill mast to the concrete Lane yard to be secured to the solid structure.
surface to be core-drilled.
During drilling with a
circular drill diamond bit,
water from a hose
connected to a tap is
flushed down the hole to
capture dust, remove
slurry and keep the drill bit
cool.
Preparation:
. make sure all drill areas
have been scanned for
electric cable.
. check all electrical
equipment has current
safety tags.
. suspend all electric
cables safely above floor
or ground level.
. check all mechanical
parts for loose
components.
. ensure each power
cable is fitted with a
ELCB.
. erect barricades and
clear no-entry signs to
area where drilling is in
progress.
To identify the actual
location for coaring activity
at existing wall and below
high raised floor.
To drill and coring
adequate holes on existing
wall by using electrical
drill.
Housekeeping to be done
throughout the work
process. Trip hazard Keep the work area clear from loose material
and debris.
2 1
Acknowledgement
I understand this work plan requirements I have reviewed and endorsed I have been informed that these job
and agree that the above proposed work that the proposed work will be activities and all the Preventive
activities will always be accomplished in completed in an effective safe measures are appropriate, in place
safe condition, in accordance with the practice and condition. and will be followed. The safety
Controlled Measures. All persons under requirements of this Permit have been
my supervision have been informed. explained to the Permit Holder and
work may proceed with minimal risk.