This document is a request for a technical deviation from the contractor for a water supply project in Abu Dhabi. The contractor proposes using electric resistance welded (ERW) pipe for sizes 400mm and below instead of seamless pipe, as specified. This is because the approved vendors are unable to supply seamless pipe. The justification provided is that mill certificates for the proposed ERW pipe are attached, there is no cost or time impact, and the change will not affect contractual or technical requirements. Approval is requested from the consultant and TransCo for this minor deviation.

Uploaded by

Unni Cyriac
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
135 views2 pages

TDR 01 R1

This document is a request for a technical deviation from the contractor for a water supply project in Abu Dhabi. The contractor proposes using electric resistance welded (ERW) pipe for sizes 400mm and below instead of seamless pipe, as specified. This is because the approved vendors are unable to supply seamless pipe. The justification provided is that mill certificates for the proposed ERW pipe are attached, there is no cost or time impact, and the change will not affect contractual or technical requirements. Approval is requested from the consultant and TransCo for this minor deviation.

Uploaded by

Unni Cyriac
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Reference Number: TD M-03

Project Title: N13271.1 Strategic Water Supply From Fujairah to Abu Dhabi
During Emergencies (LOT2)

For the Attention of:


Mr. Nawras Nabil
Project Manager
Khatib & Alami
P.O. Box : 2732 Abu Dhabi, United Arab Emirates
Serial
Contract Date Type Rev
Discipline Subject No
No.
Submittal No.
Technical
CS Pipe 16-11-2016 M-01 1
N13127.1 Mechanical Deviation
Seamless

Submitted by Nael Energy and General Enterprises EST


Contractors Project
Hamdy El Zaky
Managers Name
Signature
2. DESCRIPTION/JUSTIFICATION OF THE TECHNICAL DEVIATION/CHANGE
Proposal:
We propose ERW pipe for sizes DN400 and below instead of seamless.
As per ADEWA specification w-p-ss-002 pipe below DN400 shall be seamless

Justification:

All the approved vendors in Latest Transco vendor list either regret to supply the seamless pipe
pipes or not responded to the enquiry. Summary of regression/enquiry attached (attachment 2)
Mill certificate of the proposed pipes attached (attachment 2)

So we propose ERW pipes from M/s Hyundai/Korea for sizes DN400 and below

Cost Impact: 3216Nil

Deviation type: : Major Minor


x

Time Impact : Nil

Contractual/Technical Impact: Nil

Copy of relevant specifications (if any) attached: Yes No

Proposed mitigation for future project: NA

3. CONSULTANTS DECISIO

Ref: N13271.1/TD M-01 Page 1 of 2


APPROVED WITH COMMENTS NOT APPROVED

APPROVED
CONSULTANTS COMMENTS:

Name Signature Date

4. TRANSCOS DECISION:

APPROVED APPROVED WITH COMMENTS NOT APPROVED

COMMENTS:

Name Dr. Salem Al Harthi Projects Director Signature Date

Name Dr. Shehab Al Ameri Water Division Manager Signature Date

Water Project Management


Name Eng. Waleed Al Maouli Signature Date
Dept. Manager

Name Eng. Yousif Al Zaabi E&C Dept. Manager Signature Date

Name Project Manager Signature Date

Engineering and commisssioning


Name Signature Date
Engineer

Receipt Acknowledged by Contractor:

Name Signature Date

Ref: N13271.1/TD M-01 Page 2 of 2