This task list document outlines 5 tasks related to testing and fixing bugs for a channel emulator project. It shows the task name, estimated number of days required to complete each task, and the planned start and end dates. One task to fix a bug based on testing feedback is estimated to take 5 days but the actual time may vary depending on equipment availability.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
27 views3 pages
ADE Schedule
This task list document outlines 5 tasks related to testing and fixing bugs for a channel emulator project. It shows the task name, estimated number of days required to complete each task, and the planned start and end dates. One task to fix a bug based on testing feedback is estimated to take 5 days but the actual time may vary depending on equipment availability.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3
Task List Days Require Start Date
Channel Emulator Testing 2 6-Apr-17
Fixing the bug as per testing feedback *5 10-Apr-17 Channel emulator bug fixing and test 1 18-Apr-17 Multipath Fade 2 17-May-17 Host calibration and testing 1 19-May-17 End Date 7-Apr-17 14-Apr-17 18-Apr-17 18-May-17 19-May-17 *The inhouse task will get vary as per the VST loaner availibility