8D Form

This 8D report summarizes an issue with a supplier component part. The report outlines the problem symptoms, emergency response actions, root cause analysis conducted by a cross-functional team, and permanent corrective and preventive actions implemented to address the issue and prevent recurrence. Key details include the supplier name, part number, number of pieces delivered and rejected, problem statement, identified root causes and their contributions, and dates for implementation of containment, corrective, and preventive actions.

Uploaded by

yashaahmad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
349 views2 pages

8D Form

This 8D report summarizes an issue with a supplier component part. The report outlines the problem symptoms, emergency response actions, root cause analysis conducted by a cross-functional team, and permanent corrective and preventive actions implemented to address the issue and prevent recurrence. Key details include the supplier name, part number, number of pieces delivered and rejected, problem statement, identified root causes and their contributions, and dates for implementation of containment, corrective, and preventive actions.

Uploaded by

yashaahmad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

8D REPORT

Title: Supplier name and address:

Component Part Number: Open Date: Last Update:

Supplier Report Nr.: SKF Complaint Nr. Status:


Closed
Number of delivered Number of rejected Other information:
pieces: pieces -----
.
D0 Symptom(s) :
D0 Emergency Response Action(s): % Date
Effectiveness: Implemented:

D1 Team (Name, Dept, Phone)


Name: Role: Department: Phone number:

D2 Problem:
Problem Statement:

Problem Description :
D3 Interim Containment Action(s): % Date
Effectiveness: Implemented:

D4 Root Cause(s): %
Contribution
Escape:
.....

D5 Permanent Corrective Action(s):


% Effectiveness

Page 1 of 2
D6 Implemented Corrective Action(s): Date
Implemented:

D7 Preventive Recurrence Action(s) Date


.............. Implemented:

D7 Prevent Recurrence Systematic Recommendations: Date


Implemented:

D8 Team and Individual Recognition:

Issued by: Approved by: Closing Date:

Page 2 of 2