UB 457 152 52 B B F - P: X X EAM TO EAM IN Late

This document provides design calculations for a beam to beam fin-plate connection according to BS 5950. Key details include: - The connection is designed for a shear force of 150 kN on the right beam. - Geometry and material properties are provided for the 457x152x52 UB beams and 400mm x 10mm fin plate. - Calculations are shown checking the capacity of bolts, plate and beam components for shear, bearing and bending. - The tie force on the plate and beam web is also checked against the required 75 kN force. - All calculated capacities are shown to exceed the applied demands, with unity ratios all less than 1.

Uploaded by

ihpeter
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
132 views6 pages

UB 457 152 52 B B F - P: X X EAM TO EAM IN Late

This document provides design calculations for a beam to beam fin-plate connection according to BS 5950. Key details include: - The connection is designed for a shear force of 150 kN on the right beam. - Geometry and material properties are provided for the 457x152x52 UB beams and 400mm x 10mm fin plate. - Calculations are shown checking the capacity of bolts, plate and beam components for shear, bearing and bending. - The tie force on the plate and beam web is also checked against the required 75 kN force. - All calculated capacities are shown to exceed the applied demands, with unity ratios all less than 1.

Uploaded by

ihpeter
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6

MasterSeries PowerPad - Project Title 350498736

UB 457X152X52 BEAM TO BEAM FIN-PLATE

Beam to Beam Fin-plate Connection to BS 5950

Basic Data
Applied Forces at Interface
Shear Forces Left = 0.0 kN, Right = 150.0 kN

Tie Force 75.0 k

But not less than 100% of the Shear Load. (SCI P341 T5.1)

Design to BS 5950: Pt 1: 2000 and the SCI Green Book:

Joints in Steel Construction: Simple Connections: SCI-P212: 2002

Basic Dimensions
Supporting-457x152 UB 52 [28] D=449.8, B=152.4, T=10.9, t=7.6, r=10.2, py=275

Right-457x152 UB 52 [28] D=449.8, B=152.4, T=10.9, t=7.6, r=10.2, py=275

Bolts 20 mm in 22 mm holes Grade 4.8 Bolts


MasterSeries PowerPad - Project Title 350498736

Plates S 275, Welds E 42

Summary of Results (Unity Ratios)


Right Hand Beam
Bolt Shear & Bearing 0.93, 0.48 0.93 OK

Fin-Plate & Web Bearing 0.40, 0.52 0.52 OK

Beam Web Shear 0.33, 0.34, 0.30 0.34 OK

Beam Web Bending 0.22 OK

Fin-Plate Shear 0.25, 0.26, 0.23 0.26 OK

Fin-Plate Bending 0.11, 0 0.11 OK

Tie force Plate T,B, Web T, B 0.16, 0.33, 0.25, 0.43 0.43 OK

Supporting Beam
Web Shear 0.17 OK

Web Tie Force 0.02 OK

Web Tie Force 0.11 OK

Right Hand Beam


Recommended Geometry
Plate Depth >= 0.6D 0.6 449.8 = 269.9 mm 400 mm OK

Applied Shear Loads: Check 2


Fv=Q / n 150.0 / 5 30.0 kN

M=Qa 150.0 x 55.0 8.3 kN.m

Iyy=n1(y1)+...+n3(y3) 2x160 + 2x80 + 2x0 64000 mm

Fmh=MYmax / Iyy 8.3 x 160 / 64000 20.6 kN

Fv resultant =(Fv + Fmh) (30.0 + 20.6) 36.4 kN

Bolt Shear & Bearing: Check 2


Ps= 20 mm Grade 4.8 Bolts 39.2 kN > Fv OK

Pbb=pbtmin 495 x 7.6 x 20 75.2 kN > Fv OK

Fin-Plate & Web Bearing


Pbs=Fn(pb,t,,edge,kbs) 460, 10.0, 20, 40, 1.00 92.0 kN > Fv OK
MasterSeries PowerPad - Project Title 350498736

Pbs=Fn(pb,t,,edge,kbs) 460, 7.6, 20, 40, 1.00 69.9 kN > Fv OK

Beam Web Shear: Check 4(i)

Plane Shear

Av=0.9Dtk 0.9 x 402 x 7.6 2748 mm

Avnet=Av-ntk 2748 - 5 x 22.0 x 7.6 1912 mm

Pv=0.6pyAv 0.6 x 275 x 2748 453.5 kN > Q OK

Pvnet=0.7pyKeAvnet 0.7 x 275 x 1.2 x 1912 441.7 kN > Q OK

Block Shear

Lv=(n-1)vcc+edge (5 - 1) x80 + 40 360 mm

Pr=0.6pyt(Lv+Ke(Lt-kD')) 0.6 x275 x8 x (360 + 1.2 x (40 - 0.5 x 22.0 ) 495.1 kN > Q OK

Beam Web Bending at End of Notch: Check 5


Plane Shear Pv pv from check 4 453.5 kN

Mapp=QLa 150.0 x 84 12.6 kN.m

Znet Fn(Section, Tnotch, Bnotch) 457x152 UB 52, 25, 23 204.5 cm

Shear Classification Fv/Pv 150.0 / 453.5 0.331 <= 0.75 Low Shear

Mcap=pyZnet 275 x 204.5 56.2 kN.m OK

Double Notched Web Stability (restrained)


Data D/tw =59.2, Dc max =91 mm, C max = 347 mm

Notch Length C = 84 - 15 69 mm OK

Notch Depth Dc=Max(Dc1, Dc2) Max (25, 23) 25 mm OK

Fin-Plate Shear: Check 3(i)

Plane Shear

Av=0.9Dtk 0.9 x 400 x 10.0 3600 mm

Avnet=Av-ntk 3600 - 5 x 22.0 x 10.0 2500 mm

Pv=0.6pyAv 0.6 x 275 x 3600 594.0 kN > Q OK

Pvnet=0.7pyKeAvnet 0.7 x 275 x 1.2 x 2500 577.5 kN > Q OK

Block Shear

Lv=(n-1)vcc+edge (5 - 1) x80 + 40 360 mm

Pr=0.6pyt(Lv+Ke(Lt-kD')) 0.6 x275 x10 x (360 + 1.2 x (40 - 0.5 x 22.0 ) 651.4 kN > Q OK

Fin-Plate Bending: Check 3(ii)


MasterSeries PowerPad - Project Title 350498736

Z=TLL/6 10400400 / 6 266.7 cm

Mapp=Qa 150.0 x 55.0 8.3 kN.m

Shear Classification Fv/Pv 150.0 / 577.5 0.260 <= 0.75 Low Shear

Mcap=yZnet 275.0 x 266.7 73.3 kN.m OK

Fin-Plate - Stability & Weld: Check 3(iii)


t min=0.15a 0.15 x 55 8.3 < t OK

Min weld=0.8t 0.8 x 10 8.0 > 8 OK

Tie force: Check 11 & 12


Tie Force Tie forces are analysed independently of any vertical loads.

Plate L=e1+e2+(n-1)pe 40 + 40 + (5-1) x 80 400.0 mm

Plate Ten cap=L tpy 400.0 x 10 x 275 1100.0 kN OK

Plate Lnet=e1+e2+(n-1)pe-nd' 40 + 40 + (5-1) x 80 - 5 x 22.0 290.0 mm

Plate Ten cap= keLnettpy 1.2 x 290.0 x 10 x 275 957.0 kN OK

Plate Bear cap=1.5n tPbg 1.5 x 5 x 20 x 10.0 x 460 690.0 kN OK

Plate Bear cap=0.5netPbg 0.5 x 5 x 40 x 10.0 x 460 460.0 kN OK

Web Le=e1+e2+(n-1)pe-nd' 40 + 40 + (5-1) x 80 - 5 x 22.0 290.0 mm

Web Ten cap=Letpy 290.0 x 7.6 x 275 606.1 kN OK

Web Bear cap=1.5n tPbg 1.5 x 5 x 20 x 7.6 x 460 524.4 kN OK

Web Bear cap=0.5netPbg 0.5 x 5 x 40 x 7.6 x 460 349.6 kN OK

Supporting Beam
Web Shear: Check 10
Qmax=Q 150 150.0 kN

Pv=20.6py(0.9L1t) 2 x 0.6 x 275 x (0.9 x 400.0 x 7.6) 902.9 kN > Qmax OK

Punching Shear: Check 10


Tcons=Tw Usc /Pyf 7.6410 /275 11.3 mm

Trigor=Tw Usc /fb 7.6410 /31 100.7 mm

Tf<= max(Trigor,Tcons) 10<=100.7 OK


MasterSeries PowerPad - Project Title 350498736

Tie force on Supporting Web


hproj(ave)=(Dc-h)/2 (407.6 - 416) / 2 1 mm

bproj=hproj 1 1 mm

Leh=dc 407.6 mm

Leb=b+2bproj 26 + 2 x 1 28 mm

Mu=pyt /4 328 x 7.6 / 4 4736.3 Nmm/mm

Fcap=Mu 4(Leh/ bproj+Leb/ hproj) 4736 x 4 x (407.6/1 + 28/1) 8252.6 kN OK

FVcap=0.6PyTk2(H+B) 0.6 x 328 x 7.6 x 2 x (416 + 26) 1322.2 kN OK