Project: NIEC Building Location: Lalitpur: Detailed Quantity Estimate
Project: NIEC Building Location: Lalitpur: Detailed Quantity Estimate
Location: Lalitpur
Detailed Quantity Estimate
14 Flooring area
Mosaic Tile Flooring in Fountain
1 Area 39.95
Inside of outer PCC wall 1 Area 16.01
Inside of inner PCC wall 1 Area 4.69
46.91 46.906
Sub total 46.906 Sq.M.
0.075 3.518
Sub total 3.518 Cu.M.
46.91 46.906
Sub total 46.906 Sq.M
0.100 4.691
0.700 1.601
0.520 0.469
Sub total 6.760 Cu.M.
39.95 39.955
16.01 16.012
4.69 4.686
Sub total 60.653 Sq.M.
11.53 11.529
Sub total 11.529 Sq.M.
Project: Niec Building
Location: Lalitpur
Abstract of Cost
S. No. Description Unit Rate Unit Quantity
14 Flooring area
Mosaic Tile Flooring 3305.25 Sq.m. 60.65
Pink Sandstone Flooring 3484.00 Sq.m. 11.53
Total Cost of Civill Part of Fountain
Amount (NRs.)
797.40
10254.83
0.00
1338911.64
200474.58
40168.06
1590606.51076267