Project: NIEC Building Location: Lalitpur: Detailed Quantity Estimate

This document provides a quantity estimate and cost abstract for the civil works of a fountain area at the NIEC building site in Lalitpur, Nepal. It lists 14 items of work including site preparation, gravel spreading, screed work, PCC work, and various flooring types. The total estimated cost for the civil works of the fountain is NRs. 15,906,065.10.

Uploaded by

SANDESH
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
50% found this document useful (2 votes)
2K views4 pages

Project: NIEC Building Location: Lalitpur: Detailed Quantity Estimate

This document provides a quantity estimate and cost abstract for the civil works of a fountain area at the NIEC building site in Lalitpur, Nepal. It lists 14 items of work including site preparation, gravel spreading, screed work, PCC work, and various flooring types. The total estimated cost for the civil works of the fountain is NRs. 15,906,065.10.

Uploaded by

SANDESH
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Project: NIEC Building

Location: Lalitpur
Detailed Quantity Estimate

S.N. Description of Works No. Length Breadth

Site Preparation and Site clearance:-Site clearance and


preparation by removing bushes, roots, soil broken including
1
disposal, levelling and cleaning sites including making for
layout and site clearance after execution of work all complete.

Fountain Area area 46.91

4 Spreading of Gravel and hand compaction


Fountain Area 1 46.91

6 50 mm Thick cement screed work


Ground Floor 1 Area 46.91

PCC Work 1:3:6:-Plain Cement Concrete work of 1:3:6 in


foundation including supply of materials, mixing, placing and
7
pouring, compaction and curing etc. as specified thickness in
drawing all complete.

At Ground Floor Area 1.00 46.91


Pcc wall at Foundation 1.00 2.29
1.00 0.90

14 Flooring area
Mosaic Tile Flooring in Fountain
1 Area 39.95
Inside of outer PCC wall 1 Area 16.01
Inside of inner PCC wall 1 Area 4.69

Pink sandstone Finishing


1 Area 11.53
tity Estimate

Height Quantity Unit Remark

46.91 46.906
Sub total 46.906 Sq.M.

0.075 3.518
Sub total 3.518 Cu.M.

46.91 46.906
Sub total 46.906 Sq.M

0.100 4.691
0.700 1.601
0.520 0.469
Sub total 6.760 Cu.M.

39.95 39.955
16.01 16.012
4.69 4.686
Sub total 60.653 Sq.M.

11.53 11.529
Sub total 11.529 Sq.M.
Project: Niec Building
Location: Lalitpur

Abstract of Cost
S. No. Description Unit Rate Unit Quantity

Site Preparation and Site clearance:-Site clearance


and preparation by removing bushes, roots, soil
1 broken including disposal, levelling and cleaning 17.00 Sq.m. 46.91
sites including making for layout and site
clearance after execution of work all complete.

4 Spreading of Gravel and hand compaction 2915.00 Cu.m. 3.52

6 50 mm Thick Screed work Sq.m. 46.91

PCC Work 1:3:6:-Plain Cement Concrete work of


1:3:6 in foundation including supply of materials,
7 mixing, placing and pouring, compaction and 12686.00 Cu.m. 105.54
curing etc. as specified thickness in drawing all
complete.

14 Flooring area
Mosaic Tile Flooring 3305.25 Sq.m. 60.65
Pink Sandstone Flooring 3484.00 Sq.m. 11.53
Total Cost of Civill Part of Fountain
Amount (NRs.)

797.40

10254.83

0.00

1338911.64

200474.58
40168.06
1590606.51076267