FOU06 Internet en
FOU06 Internet en
FOU06 Internet en
drill rigs
Reliable systems for on- and offshore
3 About us
Pile Top drill rigs
for Pile Top systems We can indicate expected progress rates and
advise on any necessary supporting equipment.
Our advanced technology and high performance
equipment allows our customers to reduce their
costs and bid more aggressively.
References on successful
projects have established the During the foundation drilling phase, our drilling
experts are available for commissioning, staff
legendary name of Aker Wirth rigs. training and lifecycle service.
Wherever pioneering construction
work is performed you can be
sure Aker Wirth is there.
Venezuela
Orinoco Bridge
three rigs type PBA
818, one rig type PBA
612, bridge length
3.2 km, 156 piles with
a diameter of 2.4 m
and 1.8 m and a depth
of 60 m
Consrcio BRAVE
Australia
Tanker terminal
PBA 612/2000/200
for raker piles with an
inclination up to 1:3; at
a drilling diameter of up
to 1.25 m and depths of
up to 50 m
4 Main applications and special features
Pile Top drill rigs
Main applications
Your advantages at a glance
Modular design permits quick and easy assembly
of the drill rig
and special features Only one rig operator and two assistant workers
needed for quick connection of drill pipes
Mounting of the complete Pile Top drill rig by
crane onto the casing
Safe clamping using pneumatic or hydraulic
clamping devices
Main applications Setting the Bottom Hole Assembly (BHA) by
Foundation drilling for large diameter piles crane with tilted mast
for super-structures and buildings Exchangeable cutters for varying geological
Anchor drilling executed from drilling platforms, formations
barges and jack-ups Exchange plates adapted to main bit body to
Foundation drilling for harbours, jetties, cover variable drilling diameters
dry docks and dolphins The rig operates independently from the
Bridge, pier and causeway foundations installation crane during drilling operations
Pile rock socketing Service work can be executed by the on-site
Riser shafts for marine sewerage diffusers hydraulic crane on the working platform
USA/New Jersey
Driscoll Bridge
widening
PBA 818/2500/300
Building of a third
bridge spanning of
4400 feet in length
and 28.3 feet wide at
a drilling diameter of
1680 mm and at depths
of up to 50 m
Hong Kong
Sunley
PBA 936/3000/300
Ventilation shafts for
a metro tunnel, shaft
diameter 3.0 m up to
90 m depth including
19 m rock socket in hard
granite with 230 MPa
5 Reverse Circulation System
Pile Top drill rigs
150
Muck
Mud pit
Air-lift drill-pipe
100
airflow m/min
50
Rock bit
0
1500 2000 2500
mud m/H
1
Maximum power swivel torque 81 kNm 119 kNm 180 kNm 360 kNm 403 kNm
58600 ft lb 86100 ft lb 130200 ft lb 260400 ft lb 291500 ft lb
Unit weight hydraulic power pack 4.0 t 6.5 t 6.5 t 9.0 t 9.0 t
Standard length
BHA stabilizer and drill collar 1.5 m 1.5 m 1.5 m 3.0 m 3.0 m
59,0 inch 59,0 inch 59,0 inch 78.7 inch 78.7 inch
4.9 ft 4.9 ft 4.9 ft 6.6 ft 6.6 ft
Air compressor
Delivered air volume 1015 m3/min 1025 m3/min 2025 m3/min 2025 m3/min 2025 m3/min
353529 ft3/min 353882 ft3/min 705882 ft3/min 705882 ft3/min 705882 ft3/min
Delivery volume 1000 m3/h 1000/2000 m3/h 2400 m3/h 2600 m3/h > 3000 m3/h
590 ft3/min 590/1180 ft3/min 1412 ft3/min 1530 ft3/min > 1765 ft3/min
References
Proof of the outstanding reliability and efficiency of Aker Wirths Pile
Top rigs, with some examples of our prestigious projects from around
the world.
USA/Wisconsin Elm
Road Generating Station
Four water intake shafts
with a diameter of 4.5 m
in limestone with 150 MPa,
a depth of 55 m, an average
penetration rate of 0.25 m/h
China/Hong Kong
Stonecutters Bridge
PBA 936/3000/300
foundation of flyover piles
with a diameter of 3.0 m and
depths of up to 80 m
9 References
Pile Top drill rigs
USA/California
Carquinez Bridge
PBA 928/3000/300
bridge foundation with
a diameter of 2.7 m,
partially enlarged to a
diameter of 3.3 m
USA/California San
Francisco Oakland
Bay Bridge
PBA 933/3 000/300 for
reinforcement of the
San Francisco Bay
Bridge
Ecuador
Guayaquil Bridge
PBA 612/2000/200
bridge foundation with
2.5 m diameter piles and
depths of up to 55 m
10 References
Pile Top drill rigs
References
USA/Massachusetts
Wolf Creek Dam
A PBA 818/2500/300 for a
cut-off wall, drilling diameter
of 1.27 m and at a depth of
up to 90 m, rock strengths
of up to 150 MPa
TREVIICOS
Walter Bibikow/JAI/Corbis
11 References
Pile Top drill rigs
UK/West Coast
Burbo windfield
Pile foundation for three
MW wind turbines, at a
drilling diameter of 4.5 m
and at a depth of up to
60 m
Australia North
West Shelf
PBA 936/3 000/300
for the foundation
of the Angel oil and
gas platform. Drilling
diameter of 3.0 m and
up to 110 m drill string
length
Australia North
West Shelf/Goodwyn
A
Deepest offshore pile
foundation, 16 piles to
found the gas and oil
production platform
to the seabed, at a
diameter of 2.3 m and an
approximate depth
of 300 m, time of
execution: 20 days