Abstract-- State Grid Corporation of China plans to install At present, EHV series compensation system in China
series compensation on UHV transmission line in Changzhi- usually use "MOV parallel gap combination" as overvoltage
Nanyang-Jingmen UHV AC demonstration project of China in protection of series compensation as shown in Fig. 1. When
2011. When series compensated line occurs single-phase ground
the current or energy of MOV reaches the setting value, spark
fault, a low-frequency oscillation circuit is composed of series
compensation, shunt reactor and arc resistor of short-circuit gap will be forced to trigger and by-pass switch to close. The
point. And at the circumstance, residual charge on series fault-phase series compensation and MOV will be bypassed.
compensation discharges through the circuit, which increases low This protection strategy will be adopted in UHV series
frequency component to second arc and recovery voltage, compensation system.
extends extinguishing time to second arc, and also has influences
in single phase reclosing success rate. By using EMTP, this article
researched the transient second arc current and recovery voltage
of UHV series compensated line in Changzhi-Nanyang-Jingmen
UHV AC demonstration project, calculated the impact of fault
location and operation characteristics of UHV series
compensation protection such as MOV, spark gap and by-pass
switch. A linkage measure is also proposed in this article that by-
pass switch of fault-phase series compensation is commanded to
be closed while line protection monitors single-phase fault and
commands line breaker to trip.. Under this measure, the fault-
phase series compensation shall be bypassed during single phase
reclosing, thus the low frequency components of second arc Fig.1. The basis configuration of series compensation protected by MOV,
current and recovery voltage will quickly decay, and second arc spark gap and by-pass switch
extinguish faster. When a line occurs single-phase ground fault, second arc
1
current and recovery voltage of the faulty point should be
Keywords: UHV, series compensation, second arc current, limited to low level[1]. In this way, the second arc can
recovery voltage, linkage measure.
extinguish by itself and ensures single phase reclose. But
series compensation and its protections such as MOV, spark
I. INTRODUCTION
gap and by-pass switch, make the problem of second arc self-
A. Research condition
III. POWER FREQUENCY COMPONENT OF SECOND ARC CURRENT
In this paper, transient characteristics of UHV lines second
AND RECOVERY VOLTAGE
arc current and recovery voltage, are analysed under the
Power frequency components of second arc current and following three operation modes of series compensation, when
recovery voltage during single phase reclosing, are shown single-phase ground fault occurred along Changzhi-Nanyang
under the two situations of faulty-phase series compensation and Nanyang-Jingmen line.
with or without bypassing respectively by Tab. 1 and Tab.2 1) Series compensation do not bypass, expressed as SC not
In the two tables, Lcn represents Changzhi-Nanyang line, and bypassing in the following waveforms.
Lnj represents Nanyang-Jingmen line. 2) Series compensation permits bypass under consideration
Conclusion can be drawn from the comparision of Tab. 1 of series compensation protections such as MOV, spark gap
and 2 that fault-phase series compensation with or without and by-pass switch in Fig. 1, expressed as SC permitted
bypassing have little effect on power frequency components bypass in the following waveforms. Under this condition, if
of secondary arc current and recovery voltage. the current or energy of MOV reaches the setting value, spark
TABLE I
UNDER THE SITUATIONS OF FAULTY-PHASE SERIES COMPENSATION WITHOUT
gap will be forced to trigger and by-pass switch to close. The
BYPASSING, POWER FREQUENCY COMPONENT OF UHV LINES SECONDARY fault-phase series compensation and MOV will be bypassed.
ARC CURRENT AND RECOVERY VOLTAGE 3) A linkage measure is added that by-pass switch of fault-
maximum recovery maximum secondary arc phase series compensation is commanded to be closed while
lines voltage/kV current/A
name line protection monitors single-phase fault and commands line
head side end side head side end side
breaker to trip, expressed as SC linkage with breaker in the
Lcn 140.3 66.0 26.8 12.2 following waveforms.
Lnj 95.5 61.5 13.3 8.6 Faulty timing: single-phase ground fault occurs at 100ms,
TABLE followed by faulty-phase breakers of lines two sides trip at
UNDER THE SITUATIONS OF FAULTY-PHASE SERIES COMPENSATION BYPASSING, 150ms, finally the fault disappears at 200ms. Under the
POWER FREQUENCY COMPONENT OF UHV LINES SECONDARY ARC CURRENT
linkage measure, fault-phase series compensation is bypassed
AND RECOVERY VOLTAGE
maximum recovery maximum secondary arc
after fault occurring 20ms.
lines voltage/kV current/A Different fault points along Changzhi-Nanyang and
name Nanyang-Jingmen line are showed by Fig. 4 and Fig. 5
head side end side head side end side
Lcn 130.5 62.1 27.5 12.7 respectively.
Lnj 89.3 53.2 13.5 7.8
When single-phase ground fault occurs in line with series Fig.4. Faulty points along Changzhi-Nanyang line
Fig.6. The max second arc current of Changzhi-Nanyang line after two side
breakers tripping 0.5s
When the fault happens on line side of Changzhi series
compensation (SCcz fault point), second arc current waves
(time and frequency domain ) of faulty point under three
operation modes of SC after two side breaker tripping 0.35s, is
showed by Fig. 7 to Fig. 9. (b) Frequency domain analysis
Fig.8. When the fault happens on SCcz point and SC with bypassing, second
arc current wave after two side breaker tripping 0.35s
D. Recovery voltage
After second arc extinguishing, residual charge of fault
phase and the coupling of non-fault phases make fault point
recover voltage. Series compensation will increase low
frequency transient component to the voltage, which is
disadvantageous to second arc self extinguishing. (a) Time domain analysis
Take Nanyang-Jingmen line as an example , the influence
of series compensation to recovery voltage, is researched as
follows.
(b) Frequency domain analysis
Fig.14. When SC is not bypassing, recovery voltage wave of Nanyang-
Jingmen line head after second arc extinguishing Fig.16. When the fault happens on the position of 80km from SC and SC is
not bypassing, second arc current waves after two sides breaker tripping 0.45s
In the figure, second arc current under the series
compensation degree of 20%, 40% and 60%, are about 2~8Hz
low-frequency oscillatory waves. The lower series
compensation degree is, the lower frequency is and the slower
the second current decays. So the second arc current under the
series compensation degree of 20% is larger than other
conditions, which reaches to 148Apeak after two sides breaker
tripping 0.45s.
But on the condition of series compensation linking with
line breaker, the second current has no low frequency transient
component on any compensation degree. Because three-phase
series compensations have been bypassed during single phase
(a) Time domain analysis
reclosing.
V. CONCLUSIONS
Series compensation installed on UHV line in Changzhi-
Nanyang-Jingmen UHV AC demonstration project of China,
increases low frequency component to second arc current and
recovery voltage when single phase ground fault occurs. It has
characteristics of slow-decaying and fewer-zero, which are
disadvantageous to second arc self extinguishing.
Although the protection of series compensation can operate
to make series compensation bypass on some fault locations,
only the series compensation near fault point can be bypassed
and its contralateral series compensation still can not do so.
And on the location of small short-circuit current, the series
(b) Frequency domain analysis compensation can not be bypassed either. There will be a
Fig.15. When SC links with breaker, recovery voltage wave of Nanyang- problem of second arc extinguishing. So a measure must be
Jingmen line head after second arc extinguishing
taken.
E. Sensitivity analysis for different compensation level Under linkage measure that series compensation protection
Different compensation level of series compensation has links with line breaker, fault-phase series compensation of two
effect to transient of second current and recovery voltage sides can both bypass. So low-frequency harmonic component
when SC is not bypassed. Take Nanyang-Jingmen line as an of second arc current and recovery voltage decay quickly.
example, sensitivity analysis is researched as follows. After line breaker tripping 0.5s, the maximum current on
When the fault happens on the position of 80km from SC, different location along the line can be limited to a lower level,
second arc current waves of fault point under series which is obviously lower than series compensation without
compensation degree of 20%, 40% and 60% after two sides bypass.
breaker tripping 0.45s, is shown in Fig. 16. Summarily, UHV series compensated transmission line
should take linkage measure to limit second arc and recovery
voltage during single phase ground fault in order to make
single phase reclosing success.
VI. REFERENCES
[1] Cao Rongjiang, Gu Nihong, Sheng YongThe Simulation Research on
Secondary Arc Extinction Characteristics in Power System
[J]Proceedings of the CSEE, 1996, 16(2)73-78 (in Chinese)
[2] Zhou Xiaoxin,Guo Jianbo, Lin Jiming, Gu Shouyuan Power System
Thyristor Control Series Compensation [M] Beijing Science
Publishing House, 2009 (in Chinese)
[3] Lu Wei, Jin XiSecondary Arc in FSC Transmission Lines and Its
Restraining Measure [J]High Voltage Engineering, 2007, 33(7)49-
51 (in Chinese)
[4] Niu Xiaomin, Wang Xiaotong, Shi Wei, Wang QipingSecondary
Arc Current and Recovery Voltage of Series Compensation Line
[J]Power System Technology, 1998, 22(9)9-12 (in Chinese)
VII. BIOGRAPHIES
Zhang Yuanyuan (1982) obtained the M.Sc. degree
on electrical engineering from North China Electric power
University in 2008. Her key research area is electromagnetic
transient simulation for power system.
Ban Liangeng (1960) professor level senior engineer,
his key research area is electromagnetic transient simulation
for power system.
Xiang Zutao (1976) obtained the Ph.D. degree on
electrical engineering from Tsinghua University in 2005. His
key research area is electromagnetic transient simulation for
power system.
Han Bin (1983 ) obtained the M.Sc. degree in
electrical engineering from Tsinghua University in 2007. His
key research area is electromagnetic transient simulation for
power system.
Zhen Bin (1982 ) obtained the M.Sc. degree on
electrical engineering from North China Electric power
University in 2006. His key research area is electromagnetic
transient simulation for power system.
Ma Wenyuan (1986) obtained the bachelor's degree
on International Economica law from Shanghai International
Studies University in 2009.