1
QUALITY STANDARD OPERATING PROCEDURE- ISSUE NO: 01
MANAGEMENT
SYSTEM PRODUCTION ISSUE DATE:-15/07/10
Antiseptic non adherent dressing
PAGE 1 OF 3
Povidone iodine USP non adherent tulle dressing
1.0 PURPOSE:
The purpose of this procedure is to define and control critical activities in production as per the
requirement of ISO 13485: 2003.
2.0 SCOPE:
This procedure covers standard operating procedure of the concerned area in production.
3.0 RESPONSIBILITY:
Refer Responsibility & authority chart NO/QSM/AX04.
4.0 APPROVAL:
This procedure is approved by CEO and can be amended only by him.
6.0 PROCEDURE:
x. Discard 1/2 qty of PEG 400 from the main vessel into another SS Vessel. and set the mixture in
remi stirrer and allow to run remi stirrer
xi. Disperse the Povidone iodine slowly through spoon carefully very slowly in the duration of 100-
120 minutes.
xii. Transfer the mixture into main vessel, clean thoroughly with successive mixture discarded from
storage tank. (Ensure no substance should loss) by successive washing by PEG 400 AND water.
PREPARED APPROVED ISSUED
REVISION HISTORY
BY BY BY
REV.NO
ISO 13485:2003
DATE
PM CEO MR
NEPTUNE ORTHOPAEDICS DOC NO: NO/SOP-P/6.1
QUALITY STANDARD OPERATING PROCEDURE- ISSUE NO: 01
MANAGEMENT
SYSTEM PRODUCTION ISSUE DATE:-15/07/10
Antiseptic non adherent dressing
PAGE 2 OF 3
Povidone iodine USP non adherent tulle dressing
xiii. Close in let valve of steam line and open inlet of water supply allows circulating of water.
xiv. Then run the stirrer of main vessel in ist gear for 20 minutes.
xv. When the mixture observed as Ointment form & attaining temp 30-35 0 continue the stirring for
another 30 minutes with IIND Gear.
xvi. Stop stirrer
xvii. Close inlet outlet valve and discard the Ointment in clean ss tank and cover with lid.
Put a label mentioning B.NO and Mfg. date.
xviii. Submit a sample of appx . 100 gm of ointment to Q.C FOR ANALYSIS.
xix. Obtain the result from q.c for following parameters
1. Appearance : Shall be clear dark brown ointment
2. Identifications : Shall Positive for Povidone Iodine
3. Available Iodine : % (w/w) 1.0 to 1.3
i. Ensure the cleaning and mopping with IPA immersed tissue paper.
ii. Open the air valve.
iii. Switch on the main switch.
iv. Place and fit the Fabric (Rayon Fabrics) at the unwind roller.
v. Place two rolls of HDPE Film roll in the aligned manner and fit above and below the coating box.
vi. Insert the Fabric through coating box at the middle of the box and adjust the blade at minimum
level.
vii. Then pour the Ointment / meant to coating.
viii. Forward about 30cm dressing i.e., through proper laminating and ensure both the HDPE film are
aligned in parallel manner with the fabrics.
ix. Run the machine manually by pressing the inch/ sear button.
x. Ensure the holding and cutting of dressing is proper.
xi. Check the GSM of samples and wait for QC Clearance.
xii. Press start button.
xiii. Then machine will run automatically.
xiv. For single Piece of 10cm dressing set the counter at 2.
xv. Set the temperature at 40-500 C of the coating plate.
xvi. Adjust the GSM of the ointment up and down by the screw of the Front Plate.
xvii. The machine runs pneumatically and various Pneumatic cylinders are operated through Solenoid
valve.
xviii. Adjust the moving of the cylinders action to slow or speedy through regulating the solenoid valve
through skilled operators or through supervisor or through the concerned maintenance person
iv. Send the materials to M/S Universal Medicap Ltd. Baroda for the irradiation Process.
v. After Receive of the irradiated dressing along with irradiation certificates, 20 samples for sterility
testing shall be issued. & Raise QC REALEASE Form to QC for the goods.
vi. After release of the dressing make 5 duplex boxes in unit to warp in shrink. And allow 16 such
bundle in a shipper. And label the Shipper).mention Products Name, Batch No, Mfg Dt, Exp Dt,
Qty;
vii. Then transfer the goods though successive GTN.