Mencari Titik Tekan Center of Bouyancy Terhadap Keel (KB) : No Komponen I Meter Meter Berat (Ton) PV PL

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

I Meter Meter

No Komponen
Berat (ton) Pv pL
1 Stell Hull 54.25 1.63 15.5
2 El Motor 5.5 1.55 6.2
3 D gEnerator 6 1.63 8.7
4 Shaft/tube 0.8 1.78 3
5 Propulsor 1.5 1.78 0.7
6 x rudder 1.2 1.78 2.4
7 AC Drive 0.8 1.78 9.6
8 EL Distribution 1 1.78 8.1
9 Kompresor 0.9 1.55 10.9
10 CAT pumps 1 0.4 0.43 9.5
11 cat pumps 2 0.4 0.43 26.5
12 Bilga pumps 1 0.25 0.58 10.4
13 bilga pumps 2 0.25 0.58 25.7
14 FW pump 0.2 0.58 20.7
15 Watermaker RO 0.2 0.58 19.4
16 piping 5 0.88 16
17 cabling 1.5 1.18 15.1
18 Main Battries 17 0.58 19.3
19 Galley 0.15 1.7 15.3
20 Bunks 0.4 1.7 20.5

Z
1
97.7

Berat peralatan Kapal 97.7 Ton

Mencari Titik Tekan Center of Bouyancy terhadap Keel (K


I II I.II
No Nomor Garis Air
Luas Garis Air Faktor Luas Hasil
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Zigma 1
0

Volume Kapal k.h.Z1

KB #DIV/0!
Ton M V TMV L
Ton.M
88.4275 840.875
8.525 34.1
9.78 52.2
1.424 2.4
2.67 1.05
2.136 2.88
1.424 7.68
1.78 8.1
1.395 9.81
0.172 3.8
0.172 10.6
0.145 2.6
0.145 6.425
0.116 4.14
0.116 3.88
4.4 80
1.77 22.65
9.86 328.1
0.255 2.295
0.68 8.2

Z Z
3 2
135.3925 1431.785

VCG lCG
1.3858 14.65 m

hadap Keel (Kb)


III I.II.III
Faktor Momen Hasil
2
0

m2