Source System Connection After ECC Refresh
Source System Connection After ECC Refresh
Created logical system for EQ1-330, dont need it run bdls directly
Note 886102
===================================================
==================
Scenario C3
You want to copy a single source system of a BW system; the BW system is not
copied. You want to refresh an existing non-productive source system (of a non-
productive BW system) by copying the productive source system [PRD to NPS,
refresh].
Check table RSBASIDOC in the newly copied target SAP source system to determine
all existing source system connections.
If entries exist, note down all these entries: fields RLOGSYS and SLOGSYS.
Note: Do not delete the RFC destination between the target SAP source system and
the productive BW system! The system needs the destination during the deletion to
obtain metadata information from the productive BW system (only a read access).
I_BIW_LOGSYS = <RLOGSYS>
I_OLTP_LOGSYS = <SLOGSYS>
I_FORCE_DELETE = 'X'
This step deletes all obsolete BW connections. Repeat this step for all entries in table
RSBASIDOC.
Caution: DO NOT enter a value in the field "RFC target sys". This would cause the
function module to run in the system specified there!
In the copied source system: Delete all obsolete RFC destinations pointing to the
original environment.
Step 6.7: Rename the target SAP source system and convert the logical
system names
Assign the name assigned to the overwritten SAP source system (logical system
name, table T000) to the target SAP source system. Use transaction BDLS to convert
the logical system name in all the relevant tables. No other activities can be
performed in the system during conversion.
Read Notes 121163 and 369758 for details about transaction BDLS.
===================================================
==================
SE16
RSBASIDOC
Restore
Define source system in rsa1 and again restore
Activate
Then
It came to
Took back
BI done