Final Estimation Bridge
Final Estimation Bridge
Final Estimation Bridge
WAGHA ROAD FACILITY FROM DAROGHAWALA TO WAGHA BORDER WITH SERVICE ROAD AND
BUILT UP AREA (KM 11.88 TO KM 28.33) LENGTH 16.365 KM I.C CANAL BANK ROAD ANLONG B
1.20 KM
Sr
Description Qty
#
1 Columns Bracing
Bottom Chord
Top Chord
5 Platform
a-M.S I-Beam (150 x 75 x 6 x 8)
30 Nos x 7.87 ' = 236.1 Rft
@ 5.25 kg/ft = 1,239.53 Kg
Add 5 % wastage = 61.98 Kg
1,301.50 Kg 1301.50
b-M.S Angle Iron (50 x 50 x 6mm)
87 Nos x 4.59 ' = 399.33 Rft
@ 1.4 kg/ft = 559.06 Kg
Add 5 % wastage = 27.95 Kg
587.02 Kg 587.02
c-MS Chequrd Plate 6 mm Thk
01 No x 37.4 m x 2.4 m = 89.76 m2
OR 966.177 Sft
@ 4.3773 kg/Sft = 4,229.27 Kg
Add 10 % wastage = 422.93 Kg
4,652.19 Kg 4652.19
6 Stairs
Sides
a-M.S Channel (250x75x8x10 mm)
04 Nos x 24.6 ' = 98.40 Rft
04 Nos x 22.06 ' = 88.24 Rft
186.64
@ 8 kg/ft = 1,493.1 Kg
Add 5 % wastage = 74.66 Kg
1,567.78 Kg 1567.78
Stairs Platform
a-M.S Channel (250x75x8x10 mm)
04 Nos x 6.97 ' = 27.88 Rft
08 Nos x 5.9 ' = 47.20 Rft
75.08 Rft
@ 8 kg/ft = 600.6 Kg
Add 5 % wastage = 30.03 Kg
630.67 Kg 630.67
b-M.S Angle Iron (50 x 50 x 6 mm)
12 Nos x 2.33 ' = 27.96 Rft
@ 1.4 kg/ft = 39.14 Kg
Add 5 % wastage = 1.96 Kg
41.10 Kg 41.10
c-MS Chequrd Plate 6 mm Thk
02 No x 2m x 1.8 m = 7.20 m2
OR 77.501 Sft
@ 4.3773 kg/Sft = 339.25 Kg
Add 10 % wastage = 33.92 Kg
373.17 Kg 373.17
Steps
a-M.S Angle Iron (50 x 50 x 6 mm)
86 Nos x 5.91 ' = 508.26 Rft
@ 1.4 kg/ft = 711.56 Kg
Add 5 % wastage = 35.58 Kg
747.14 Kg 747.14
b-MS Chequrd Plate 6 mm Thk
86 No x 1.8 m x 0.43 m = 66.56 m2
OR 716.495 Sft
@ 4.3773 kg/Sft = 3,136.33 Kg
Add 10 % wastage = 313.63 Kg
3,449.96 Kg 3449.96
7 Stairs Railing
Top Railing
a-M.S Angle Iron (50 x 50 x 6 mm)
08 Nos x 24.47 ' = 195.76 Rft
08 Nos x 6.84 ' = 54.72 Rft
08 Nos x 22.11 ' = 176.88 Rft
12 Nos x 3.71 ' = 44.52 Rft
471.88 Rft
@ 1.4 kg/ft = 660.6 Kg
Add 5 % wastage = 33.03 Kg
693.66 Kg 693.66
Vertical Posts
a-M.S Angle Iron (50 x 50 x 6 mm)
116 Nos x 3.17 ' = 367.72 Rft
@ 1.4 kg/ft = 514.8 Kg
Add 5 % wastage = 25.74 Kg
540.55 Kg 540.55
Diagonals
a-M.S Angle Iron (50 x 50 x 6 mm)
36 Nos x 3.1 ' = 111.60 Rft
@ 1.4 kg/ft = 156.2 Kg
Add 5 % wastage = 7.81 Kg
164.05 Kg 164.05
Retaining Bars
a-M.S Flat Bar (30 x 5 mm)
12 Nos x 53.6 ' = 643.2 Rft
@ 0.36 kg/ft = 231.55 Kg
Add 5 % wastage = 11.58 Kg
243.13 Kg 243.13
8 Columns
Main Bridge
a-M.S H-Beam (250 x 250 x 13 x 14)
12 Nos x 16.84 ' = 202.08 Rft
@ 23.01 kg/ft = 4,649.86 Kg
Add 5 % wastage = 232.49 Kg
4,882.35 Kg 4882.35
For Stairs
a-M.S H-Beam (250 x 250 x 13 x 14)
04 Nos x 7.31 ' = 29.24 Rft
@ 23.01 kg/ft = 672.81 Kg
Add 5 % wastage = 33.64 Kg
706.45 Kg 706.45
Stairs Column
Size: Dia 25 x 750mm Lg (Dia 1" x 2'.6" Long) 24 Nos 24.00
Rate Amount
Unit
(Rs.) (Rs.)
130.64
Kg 65.3 179,144.79
134.69
Kg 65.3 184,702.67
135.79
Kg 65.3 186,208.36
10.49
Kg 65.3 14,390.42
68.87
Kg 65.3 94,446.97
13.81
Kg 65.3 18,933.81
94.54
Kg 65.30 129,643.20
56.83
Kg 65.3 77,935.39
7.46
Kg 72.3 11,325.30
16.27
Kg 65.3 22,308.53
3.02
Kg 78.3 2,597.27
35.42
Kg 86.3 64,198.92
19.22
Kg 65.3 26,358.91
61.98
Kg 84.3 109,716.56
27.95
Kg 65.3 38,332.09
422.93
Kg 87.3 406,136.57
74.66
Kg 72.3 113,350.20
30.03
Kg 72.3 45,597.59
1.96
Kg 65.3 2,683.91
33.92
Kg 87.3 32,577.80
35.58
Kg 65.3 48,788.39
313.63
Kg 87.3 301,181.76
33.03
Kg 65.3 45,296.23
25.74
Kg 65.3 35,297.81
7.81
Kg 65.3 10,712.60
11.58
Kg 65.3 15,876.36
232.49
Kg 84.3 411,582.43
33.64
Kg 84.3 59,553.99
58.30
Kg 78.3 50,213.85
15.71
Kg 78.3 13,527.44
78.53
Kg 76.3 65,909.54
90.47
Kg 76.3 75,927.79
13.74
Kg 76.3 11,534.17
wastage 2916.44449
Nos. 800 102,400.00
Each
17100
707,000.56
Total 7,420,932
222,628
Total Cost 7,643,560
1,528,712
G.Total 9,172,272
Per Kg 25 (72,500.00)
Net 9,099,772
Say 9,099,000
/litre + Tax
Litre
389.76 135.22222
341.04
292.32
ESTIMATION FOR FABRICATION AND INSTALLATION OF PEDESTRIAN STEEL TRUSS BRIDGE
LANE LAHORE WAGHA ROAD FACILITY FROM DAROGHAWALA TO WAGHA BORDER WITH SE
ROAD AND DRAINS IN THE BUILT UP AREA (KM 11.88 TO KM 28.33) LENGTH 16.365 KM I.C C
BANK ROAD ANLONG BRB CANAL LENGTH 1.20 KM
ABSTRACT OF COST
Sr No. Description
1 PART-I
Manufacturing of Steel Structures
2 PART-II
Foundation/Civil Work
Total
OR
STEEL TRUSS BRIDGE ON 4
GHA BORDER WITH SERVICE
ENGTH 16.365 KM I.C CANAL
0 KM
Amount
(Rs.)
Rs. 9099000
Rs. 950,722
10,049,722
10.049 Million
PART-I
MANUFACTURING OF STEEL
STRUCTURE
EEL
PART-II
FOUNDATION/CIVIL WORK
ORK
RATE ANALYSIS OF STEEL MATERIALS FOR THE EVALUATION OF PEDESTRIAN OVERHEAD BRIDGE
Carriage Unloading/
Input Rate 4th Loading 20 % Contractor
Sr Input Rate Charges Stacking Grand Total Grand Total
Description of Material Qtr 2010 (Oct to Charges Profit and
No. Page/Item No. P.M. Charges P.M. Ton Per Kg
Dec) P.M. Ton P.M. Ton Overheads
Ton P.M. Ton
M.S Angle Iron (50 x 50 x 6 mm)
87 of 130 M.S
2" x 2" x 1/4"
1 Sections HB-1 64,000 300 600 400 65,300 65.30
M.S Angle Iron (75 x 75 x 6 mm)
87 of 130 M.S
3" x 3" x 1/4"
2 Sections HB-1 64,000 300 600 400 65,300 65.30
M.S Angle Iron (88 x 88 x 9 mm)
87 of 130 M.S
3 1/2" x 3 1/2" x 3/8"
3 Sections HB-1 64,000 300 600 400 65,300 65.30
M.S Angle Iron (100 x 100 x 6 mm)
87 of 130 M.S
4" x 4" x 1/4"
4 Sections HB-1 64,000 300 600 400 65,300 65.30
M.S Angle Iron (100 x 100 x 9 mm)
87 of 130 M.S
4" x 4" x 3/8"
5 Sections HB-1 64,000 300 600 400 65,300 65.30