PL7-3 Installation Guide
PL7-3 Installation Guide
PL7-3 Installation Guide
Installation Section 2
___________________________________________________________________________
Sub-section Page
__________________________________________________________________________________________________
2.1 Hardware check 2/2
__________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________________________________________________
2.2 Connections 2/4
__________________________________________________________________________________________________________
2.2-1 Installing the software key 2/4
__________________________________________________________________________________________________________
2.2-2 Connection to main power source 2/4
__________________________________________________________________________________________________________
2.2-3 Connecting the FTX 417-20 terminal to the PLC 2/5
__________________________________________________________________________________________________________
2.2-4 Connecting the FTX 507 terminal to the PLC 2/5
__________________________________________________________________________________________________________
2.2-5 Connecting the IBM PS/2 or compatible PC to the PLC 2/6
__________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________________________________________________
2.3 Software Installation 2/8
__________________________________________________________________________________________________________
2.3-1 Preliminary steps 2/8
__________________________________________________________________________________________________________
2.3-2 Installation procedure 2/8
__________________________________________________________________________________________________________
__________________________________________________________________________________________________________
2.4 PL7-3 Files 2/10
__________________________________________________________________________________________________________
___________________________________________________________________________
2/1
A
___________________________________________________________________________
2.1 Hardware Check
_________________________________________________________________________________________________________________________
___________________________________________________________________________
2/2
Installation 2
A
___________________________________________________________________________
Software key
TSX TAC 03
TSX CTC 00
Converter/PLC cable
TE approved
IBM PS/2 or
compatible PC
TSX TE 01
RS232/CL converter
Documentation
TXT DR PL7 3 V5E
TXT DM PL7 3 V5E
TXT DM FBD V4E
TSX CTC 01
Converter/microcomputer
cable
TSX CTC 02 X X
Converter/microcomputer
cable
TSX SCC 02
Software key support
___________________________________________________________________________
2/3
A
___________________________________________________________________________
2.2 Connections
_________________________________________________________________________________________________________________________
The connections specific to the terminal (monitor, keyboard, mouse, printer) are
described in the manufacturer's documentation. This section therefore describes only
the installation of the software key and the following connections :
The connection of the terminal to the main power source.
The connection of the terminal to the PLC.
_________________________________________________________________________________________________________________________
Note
The software key contains the right of use necessary to access the PL7-3 software.
The Key Manager delivered with the software workshop allows this right of use to be transferred
to the master key. This makes the PL7-3 software key unusable and it can therefore be removed,
thus freeing the corresponding slot on the software key support.
_________________________________________________________________________________________________________________________
___________________________________________________________________________
2/4
Installation 2
A
___________________________________________________________________________
2.2-3 Connecting the FTX 417-20 terminal to the PLC
This connection requires the T FTX CB 7 4 connecting cable
T FTX CB 7 4
Mains
_________________________________________________________________________________________________________________________
Serial link
connector
25-pin
T FTX CB 7 5 parallel link
connector
Mains
___________________________________________________________________________
2/5
A
___________________________________________________________________________
2.2-5 Connecting the IBM PS/2 or compatible PC to the PLC
This connection requires the TSX TAC 03 connection kit and is performed in three
steps :
X7 Front panel
1 2 3
X6
1 2 3
X5 Top view case open
S1 S2 S3
1 2 3
1 1 3 4 1 3
X4
1 2 3 2 3 4 2 5 2 4
IMPORTANT
The connection may be damaged if these settings are not correct, or if any other type
of converter is used.
___________________________________________________________________________
2/6
Installation 2
A
___________________________________________________________________________
2 Connecting the PLC programming port to the converter
This connection uses the TSX CTC 00, wired as shown below :
1
+REC 2 Red
1 R+
3
+EMI 4 White 2 R-
5
OV 6 White
3 T+
-REC 7
-EMI 8 Blue 4 T-
+12V 9
5
9-pin connector on LINE CONNECTION
PLC programming port 5-pin screw terminal
on the converter
3 Connecting the converter to the computer
This connection uses the TSX CTC 01 or TSX CTC 02 cable connected between the
9-pin or 25-pin "serial link" connector on the computer and the 25-pin connector (V24/
RS-232 C CONNECTION) on the converter.
Mains
TSX CTC 00
TSX CTC 02
Converter
Mains
___________________________________________________________________________
2/7
A
___________________________________________________________________________
2.3 Software Installation
_________________________________________________________________________________________________________________________
IMPORTANT
The PL7-3 diskettes are delivered set to the "write protect" position, which should not
be altered.
_________________________________________________________________________________________________________________________
___________________________________________________________________________
2/8
Installation 2
A
___________________________________________________________________________
Installing PL7-3 software
Start a full-screen OS/2 session,
Insert PL7-3 diskette No. 1 in the disk drive,
Identify the drive containing the diskette (a: or b:) and press <Enter>,
After the new prompt (for example : [a:\] or [b:\]), enter the command install and press
<Enter>,
Follow the procedure displayed on the screen : replace diskette No.1 by diskette No.2
when requested to do so and then press <Enter>,
When the installation is complete, insert the Grafcet OFB disk in the disk drive, then
enter the command install and press <Enter>,
When the installation is complete, install the OFBs in the PL7-DIAG family in the same
way (refer to the corresponding instruction manual).
Note
If PL7-3 already exists on the station where PL7-3 GLD or PL7-3 GLT is being installed, a warning
message is displayed. Installation can then be interrupted by pressing <Q> on the keyboard. The
same is also true when installing PL7-3, if PL7-3 GLD or PL7-3 GLT already exist on the station.
Important
Under OS/2 2.1, if the screen display under PL7-3 has been altered, reinstall the
X-TEL or MINI X-TEL software workshop using the command :
install FIX21
At the end of installation, reinitialise the work station using the command :
<Ctrl><Alt><Del>.
___________________________________________________________________________
2/9
A
___________________________________________________________________________
2.4 PL7-3 Files
_________________________________________________________________________________________________________________________