Daily Report For NMC Department On 16-March-2017

This daily report from the NMC department summarizes their work on March 16, 2017. It details the activities of the Core Network, Radio, and IPTV/Camera teams. The Core Network team monitored links and tested new systems. The Radio team monitored equipment, tested calls and SMS, configured new sites, and upgraded software. The IPTV/Camera team monitored video and sound, upgraded cameras, configured storage settings, and modified camera times.

Uploaded by

Jame Jame
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views2 pages

Daily Report For NMC Department On 16-March-2017

This daily report from the NMC department summarizes their work on March 16, 2017. It details the activities of the Core Network, Radio, and IPTV/Camera teams. The Core Network team monitored links and tested new systems. The Radio team monitored equipment, tested calls and SMS, configured new sites, and upgraded software. The IPTV/Camera team monitored video and sound, upgraded cameras, configured storage settings, and modified camera times.

Uploaded by

Jame Jame
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Contents

I> Core network (Mao Samphas)................................................................................1


II> Radio (Thong Panha)............................................................................................. 1
III> IPTV and Camera (Panhasey)............................................................................... 2

Daily report for NMC department on 16-March-2017

I> Core network (Mao Samphas)


-Monitoring the link smpp between BICS and CooTel

-Transferred missing data to DMC

-Backup database all the nodes

-Tested Aicent for their new platform

-Tested CC new system

-Feedback to BICS

-Escalated to Mr. Eirc for the connectivity issue

-Escalated to Data for checking the route

II> Radio (Thong Panha)


- Monitor iM3000, iM5000, U2000

- Test voice call and sms

- Check link stat, media link stat and configuration link (SAG)

- Support NOC and engineer to solve problems

- Generate daily and weekly report

- Delete calibration log files

- Generate and send new schedule to HR


- Update sending report for NOC

- OnAir new site PPM924

- Add PPM924 into EMS and SAG

- Add Neighbour List

- Manual configure BTS (system, Layer1, Layer2, Layer3)

- Import RF planning for site PPM924

- Upgrade BTS Software version PPM924

- Test voice call, sms, and internet for SVF027 with engineer

III> IPTV and Camera (Kheav Panhasey)


-Monitor IPTV Sound and Video

-Check IPTV status channel

-Monitor IP Camera System

-Upgrade new camera version

-Update IP, gateway and Mac address

-Configure camera to store in VSC system

-Configure IP camera for sites

-Tracking Camera record system

-Modify camera time and date