Daily report for NMC department on 16-March-2017
I> Core network (Mao Samphas)
-Monitoring the link smpp between BICS and CooTel
-Transferred missing data to DMC
-Backup database all the nodes
-Tested Aicent for their new platform
-Tested CC new system
-Feedback to BICS
-Escalated to Mr. Eirc for the connectivity issue
-Escalated to Data for checking the route
II> Radio (Thong Panha)
- Monitor iM3000, iM5000, U2000
- Test voice call and sms
- Check link stat, media link stat and configuration link (SAG)
- Support NOC and engineer to solve problems
- Generate daily and weekly report
- Delete calibration log files
- Generate and send new schedule to HR
- Update sending report for NOC
- OnAir new site PPM924
- Add PPM924 into EMS and SAG
- Add Neighbour List
- Manual configure BTS (system, Layer1, Layer2, Layer3)
- Import RF planning for site PPM924
- Upgrade BTS Software version PPM924
- Test voice call, sms, and internet for SVF027 with engineer
III> IPTV and Camera (Kheav Panhasey)
-Monitor IPTV Sound and Video
-Check IPTV status channel
-Monitor IP Camera System
-Upgrade new camera version
-Update IP, gateway and Mac address
-Configure camera to store in VSC system
-Configure IP camera for sites
-Tracking Camera record system
-Modify camera time and date