reproduced, copied, disclosed to any third party or used any purpose other than that for which it is supplied or
disclosed
. .
.
DOC. NO : 543-E-02
TITLE :
CONTROL WRITEUP REV.NO.:R 1
REFERENCE DRAWINGS
5. Ash water and Ash Slurry Disposal System P&ID 543-01-05, R-05
2
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
CONTROL WRITE UP
CHAPTER I
1.0 INTRODUCTION
3
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
Coarse ash tank will be provided with three (03) number jet
pump, each having conveying capacity minimum 75 TPH
capacity.
The total fly ash generated will be conveyed in four (4) streams
operating simultaneously and in parallel.
4
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
Two (2) nos of fluidizing blowers (1W+1S) each of 100%
capacity will be provided for easy dislodging of ash from all the
ESP and Buffer hoppers.
There are total 3 nos. fly ash silos each having storage
capacity of 1125 MT each. Out of total 3 nos. Silo, 2 nos. are
for direct ash disposal in dry form and other one for HCSS.
5
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
CHAPTER II
CHAPTER III
CHAPTER - IV
6
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
CONTROL WRITE UP UP
CHAPTER II
2.2 The Bottom ash and Coarse ash cleaning system are mainly
carried out from Bottom Ash Local Control Panel (BALP) and
Coarse ash local control panel located in the boiler area. The
main equipments covered under this system relate to Clinker
Grinder, Bottom Ash Jet pumps, B.A Overflow transfer pump,
B.A Sump Jet pumps, Coarse ash Feeder Ejectors, Coarse
ash disposal jet pumps, various water line valves (Pneumatic
operated), Bottom ash Feed Gates etc.
7
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
Any one Feed Gate/Jet Pump from each section of B.A Hopper
can be operated at a time. Only the feed gate whose clinker
grinder is ON can be opened.
2.3 For initiating the bottom ash evacuation operation the operator
will ensure that at least one BAHP water pump is running.
2.5 After all the above mentioned valves are opened and
respective water line pressure (BAHP water pressure and seal
water line pressure to Clinker Grinder) are above pre set value,
the Clinker Grinder can be started in forward direction. Once
the Clinker Grinder operation is ensured, the Feed Gate can be
opened from the panel for effecting ash removal operation. In
case water pressure falls below the required value either for
Jet pump or for Clinker Grinder seal water, the entire system
will stop in the following sequence.
8
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
The make up valve in the bottom ash L.P. water line and
Refractory cooling water line to bottom ash hopper is generally
kept open when the boiler is in operation. The cooling water
flows to bottom ash hopper to keep the wall of refractory cool.
Overflow from the bottom ash hopper carrying the heat is
discharged into the B.A Overflow Sump. B.A Overflow pump
discharges water to Tube Settler and Ash Disposal sump.
Overflow from tube settler is taken into Ash water disposal
sump as make up. The settled solid sludge from the tube
settler is drained into sludge sump, here it is mixed with water
from the HP water pump and the tube settler sludge pump then
9
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
conveys this slurry to the ash slurry disposal sump. However,
the B.A Overflow transfer pump will be stopped during bottom
ash removal operation.
After the bottom ash hopper is emptied the bottom ash hopper
make up valve is immediately opened to allow the water inside
the hopper. Additionally, 2 to 3 nos. B.A Hopper jetting nozzle
are also kept opened for about 10 minutes to provide additional
filling make up from BAHP water line to reduce the bottom ash
filling time.
3.3 The bottom ash overflow water along with seal trough make up
water is taken upto overflow tank. Two (2) nos. overflow pumps
(1 W+1S) are provided. The sequence of operation is as
below.
4.1 There are two (2) nos. (1W+1S) Bottom Ash Overflow Transfer
Pump provided per unit to cater transferring of bottom ash
overflow water to tube settler tank.
4.2 To start Bottom Ash Overflow Transfer Pump the seal water
line valve to that particular B.A Overflow Transfer pump to be
opened first.
4.4 In the event of seal water available pressure is less than the
preset value after laps of initial time 30 sec the operating pump
will trip.
10
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
5.1 The tube settler and Sludge pumps are located near Ash water
pump house. The B.A. overflow water from B.A Overflow sump
is transferred to the tube settler, the sludge deposited in tube
settler is drained into the sludge sump which is continuously
removed by sludge pump and transported to ash slurry
disposal sump. Only one sludge pump is to operate at a time.
5.2 At a time only one B.A Overflow Transfer Pump has to run.
Sludge pumps are provided with seal water. If seal water
available pressure is less than the preset value after laps of
initial time 30 sec the operating pump will trip. There are two
(2) nos. sludge pump (1W+1S) provided for cleaning of settled
ash of tube settler. Normally one Sludge pump will operate.
The sludge pump will take start when the respective seal water
pressure is normal and the Sludge tank water level is above
preset level.
11
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
7.1 There are three 3 nos. (2W+1S) coarse ash disposal jet pumps
for disposal of ash slurry from coarse ash tank to ash slurry
disposal sump. Water requirement of these jet pumps is
fulfilled by the B.A.H.P. water pump. Once the water pressure
to these pumps is adequate, the Jet pump inlet valve is
opened. There are three individual pneumatically operated
water line valve for each jet pumps. The discharge line of each
jet pump is independent of each other. The ash slurry is
conveyed to the ash slurry disposal sump through these jet
pumps.
8.1 There are two (2) series (1W + 1S) of Ash Slurry Pumps. Each
series in turn consists of five stages of pump. The first stage
pump driven with fluid coupling. The subsequent stages are
belt driven.
8.2 The ash slurry in the common ash slurry disposal sump
collected from the bottom ash, coarse ash and stack hopper.
Ash is conveyed to the ash disposal area by the two series of
ash slurry pumps. Each series has a pneumatic suction and
discharge valve. Out of the two series one is working and one
is standby. Each stage pump is provided with seal water valve
and pressure switch. For initiating the ash slurry disposal pump
12
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
9.1 There is one (1) no. stack hopper. The ash from this hopper is
transported to a collecting tank through feeder ejector system.
From this tank the ash is conveyed to ash slurry disposal sump
through one (1) no. jet pump. The ash inlet valve of Feeder
Ejector will open only when the water line pressure to Jet pump
is adequate. There is a common header water line valve for
both the stack hopper feeder ejector and jet pump.
13
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
b. In providing the above fly ash removal facility from all the fly
ash hoppers four (4) nos. independent vacuum conveying
streams have been envisaged. Each vacuum conveying
stream is ultimately provided with one (1) no. Mechanical
Exhauster, two (2) nos. mechanical exhausters are common
standby for the four vacuum conveying streams.
14
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
10.2 Sequence of operation :
15
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
Following are the primary steps for operating fly ash vacuum
conveying system. The description is applicable for all the
streams.
16
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
10.4.1 Once the sequence of cleaning of all hoppers are over under
auto mode the sequence can either be repeated on its own or
an annunciation Sequence Over can be initiated depending
upon the selection in the HMI by the operator. This is to
facilitate the option that the fly ash can be continuously
evacuated or it can be operated intermittently if some running
maintenance is required between the two operations.
17
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
filling and other in conveying mode). Both the vessels of the
one buffer hopper are connected to the same pressure
conveying line.
The silo ash level has been checked to be not at high level.
The corresponding ash isolation valve of respective silo has
been kept open. Other valves in the line directed to other silo
have been kept closed.
For vessel purging, both the fluidizing air and ALV discharge
valve of respective vessels open.
18
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
As soon as the line purging starts, as stated above, the
respective line vacuum pump also starts (subject to its own
interlock for restricting vacuum). Simultaneously, respective
19
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
shoots up higher than the value defined for ash conveying, the
ALV discharge valve and fluidizing valve will be closed till the
line pressure comes down below the set value.
There are four nos. (2LP+2HP) Seal water pump for catering to
the seal water requirements of ash slurry pumps and drain
pumps near ash slurry pump house. The rated parameters of
seal water pumps are, LP Seal Water Pump: 31 cu.m/hr @ 126
MWC and HP Seal Water Pump: 14 cu.m/hr @ 152 MWC.
Seal water is started before starting of the above mentioned
equipments.
Out of the four pumps one pump each of HP seal water and LP
seal water is under stand by mode. The working/stand by
mode is selected from Compressor house HMI. The pump
which is selected in stand by mode automatically starts when
the operating pump trips and the starting permissive are
available.
20
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
The seal water pump trips if the suction water pressure is
below the set point.
There are two (2) nos. (1W+1S) BALP pumps provided for
catering to cooling water requirement of B.A Hopper and make-
up under various mode of operation for two units. The rated
parameter of BALP pumps are 260 cu.m/hr. @ 25 MWC. The
pumps can be started from Compressor house HMI. Each of
the pump can be started only if the water level in ash water
sump is above the preset level. The operating pump will trip if
the water level in the sump goes lower than preset level.
There are two (2) nos. (1W+1S) BAHP water pumps provided
to cater the requirement of Bottom ash Jet pump, Flushing &
Jetting for two units. The rated parameters of BAHP water
pumps are 540 cu.m/hr. @ 73 MWC. The BAHP water pumps
operate only when the Jet pumps of B.A system / Feeder
Ejector/ C.A Jet pump and ash slurry sump jetting is to operate.
As such, BAHP water pump operation is intermittent. Other
starting and running permissive of BAHP water pump is same
as BALP water pump.
There are two (2) nos. (1W+1S) RCW water pumps provided to
cater the cooling water requirement of B.A. hopper refractory
cooling of two units. The rated parameter of RCW water pumps
are 357 cu.m/hr. @ 25 MWC.
The pumps can be started from Compressor house HMI. Each
of the pump can be started only if the water level in ash water
sump is above the preset level. The operating pump will trip if
the water level in the sump goes lower than preset level.
21
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
12.1 There are two series (1W+1S) of ash slurry pumps provided for
ash slurry pumping system. The ash slurry sump has three
compartments. Each series has five pumps. Any one series will
take care of handling slurry of both the units. The first stage of
slurry pump is provided with fluid coupling having variable
speed drive arrangement. The operation of all the series is
similar. The sequences of operation, interlocks and per
missives are explained in the following clauses.
12.2 The entire operation of one series can be initiated through one
set of group start/group stop push button provided in Ash slurry
pump house HMI. Or else individual equipment in the series
can be started and stopped through individual switch option in
HMI. The selection between the auto operation of the entire
group or the manual operation of individual equipment will be
carried out from HMI.
Seal water pumps are started first before starting of first series
of slurry pump.
Slurry level in respective slurry sump is above the preset level.
22
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
12.4 Under group auto operation, the sequence and the permissive
of starting of all the equipment in the series are as below :
The suction valve will open first.
The seal water solenoid valve to all the six pumps in a series
shall open.
The cooling water pressure to respective Fluid coupling is
normal.
The first pump will not start unless the suction valve has
opened and the water level in the sump is above preset level.
The first stage pump will start.
After starting of the first pump there shall be a preset delay
after which the second stage pump will be started. It is to be
noted that normally this time delay will be provided 15 sec.
While the same may slightly vary during actual operation.
The other four pumps in series will take start as per earlier
sequence.
The discharge valve shall open after some preset time (5 sec.)
after starting of Second stage pump.
23
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
24
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
13.0 DRAINAGE SYSTEM
Two nos. Jet pump (1W + 1S) are provided for dewatering of
ash slurry from bottom ash hopper area. Suction of these jet
pumps are from B.A. area drain sump and this jet pump will
also discharge ash slurry to BA overflow sump.
13.2 DRAIN PUMP FOR ASH SLURRY & ASH WATER PUMP
HOUSE AREA
Two nos. drain sump pump (1W + 1S) has been provide near
ash slurry pump house for dewatering of collected water from
ash slurry pump house. This drain pump will discharge the
collected water to ash slurry sump. The drain pump can be
operated from Compressor house HMI. The pump parameters
are 27 cu.M/Hr. @17 MWC
The pump will trip is the above conditions are not fulfilled.
Two nos. drain sump pump (1W + 1S) has been provide near
vacuum pump house for dewatering of collected water from
vacuum pump area. This drain pump will discharge the
collected water to ash slurry sump. The drain pump is to be
operated from compressor house HMI. The pump parameters
are 50 cu.M/Hr. @15 MWC.
25
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
Drain sump level is above low.
The pump will trip is the above conditions are not fulfilled.
Two nos. drain sump pump (1W + 1S) has been provide near
remote silo area for dewatering of collected ash water of silo
area. This drain pump will discharge the collected ash water to
ash slurry sump. The drain pump is to be operated from silo
control panel. The pump parameters are 20 cu.M/Hr.
@25MWC.
The pump will trip is the above conditions are not fulfilled.
Two nos. drain sump pump (1W + 1S) has been provide near
remote silo area for dewatering of collected ash water of silo
area. This drain pump will discharge the collected ash water to
ash slurry sump. The drain pump is to be operated from
compressor house HMI. The pump parameters are 20 cu.M/Hr.
@25 MWC.
The pump will trip is the above conditions are not fulfilled.
26
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
14.0 FLUIDIZING AIR SYSTEM
Two nos.(1W + 1S) air blowers are provide for catering the
fluidizing air requirements of ESP hoppers and buffer hoppers
of each unit. The rated parameter of ESP/Buffer hopper
fluidizing air blower is 750 cu.m/hr. @ 4000 MMWG.
Three nos.(2W + 1S) air blowers are provide for catering the
fluidizing air requirements of HCSD silo. The rated parameter
of HCSD silo air blower is 1000 cu.m/hr. @ 6000 mmwc.
27
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
The above blowers are to be operated from HMI located at
compressor house.
One no. air heater is provided on discharge header of each air
blower. Two. Nos. temperature switch is also provided for
automatic ON/OFF purpose of the fluidizing blower. Initially the
heater can be on by the operator from HMI located in ash
slurry pump house. Whenever the temperature in the fluidizing
airline is above the preset value the heater will automatically
OFF. If it is below the preset value, the heater will be
automatically ON. The heater which is in standby blower line
cannot be started.
Three nos. (2W + 1S) air blowers are provide for catering the
fluidizing air requirements of two nos. silos. The rated
parameter of silo fluidizing air blower is 1000 cu.m/hr. @ 6000
mmwc.
28
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
one no. air blower will cater the requirement of fluidizing air of
one silo.
There are two (2) nos. (1W+1S) Dust conditioning water pump
provided to cater the requirements of conditioning water to
Dust conditioner for unloading of moist ash to open truck from
the two nos. dry fly ash storage silo. The rated parameter of
D.C water pump are 58 cu.m/hr. @ 53 MWC.
The entire operation, control philosophy, sequence and
interlocks of D.C water pump is as below:
If the level in silo area wash water sump is above the low
level.
In case the water level in the sump goes below danger low
level, the pump will trip.
One no. dry ash unloading spout is provided in each Fly ash
remote silo for dry ash unloading to close tanker. There are two
nos. limit switch provided for full up and full down position of
dry ash unloading spout (as well as to stop the higher run and
lower run operation). There are three nos. push buttons
provided in silo unloading panel for dry ash unloading spout
operation. If lower run is required then press lower push button.
29
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
Lower run lamp glows till the lower run is completed, lamp
goes off. If higher run is required then press the raise push
button. Raise lamp glows till the higher run is completed. Then
lamp goes off. If intermediate stop is required, then press the
stop push button, the stop lamp glows.
One no. scavenger fan is provided for each dry ash unloading
spout for unloading dry ash to close tanker. The scavenger fan
can start from silo utility control desk through start/ stop push
button only when the dry ash-unloading spout full down limit
switch is actuated.
Stop Sequence
30
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
One no. Paddle Feeder is provided in each silo for moist ash
unloading to open truck. For moist ash unloading to open truck
through the Paddle Feeder, first open the Paddle Feeder water
line valve from open/close selection switch located in silo utility
control desk. Then the Paddle Feeder shall be started from silo
unloading panel through the respective start/stop push button if
unloader conditioning water pressure is above the preset
value.
Stop Sequence
31
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
16.0 VACUUM PUMP
There are six (6) nos. vacuum pumps (4W+ 2S). Normally one
vacuum pump will be operated from HMI located at
compressor house for one vacuum stream. Vacuum pump can
be started if the following conditions are fulfilled.
32
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
bypassed at the starting. The pressure switch in the control
manifold (having the discharge air pressure) will trigger a
mechanism of keeping the suction open when no discharge of
air is required. However, with the consumption of air from the
air receiver tank the pressure falls below the preset level and
accordingly, unloading mechanism is deactivated. Therefore,
the suction valve opens as per stroke position allowing
discharge of air from compressor.
The Lub. Oil pressure switch is brought into circuit after a few
moments of starting the compressor. By this time the lub. Oil
pressure is fully developed.
33
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
temperature is below the preset value, after cooler outlet
temperature is not at high level, receiver air pressure is not at
high level, cylinder jacket cooling water outlet temperature is
not at high level, cooling water outlet flow is not less than the
desired level, lub oil pressure is available.
Two nos. (1W + 1S) refrigerant type air driers are provided for
supply of moisture free compressed air to various instruments.
The control of these air drier are from HMI located at
compressor house. The air drier can be started under the
following condition:
34
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
Required due point temperature is achieved.
There are five (6) nos. (4W + 2S) transport air compressor
provided for catering the conveying air requirement for
transportation of dry fly ash from buffer hopper to silo. The
T.A.Cs are to be started before the dry ash evacuation through
pressure conveying system. The rated parameter of T.A.C. are
2895 cu.m/hr. @ 45 MWC. There are four streams of pressure
conveying system which are independent of each other. One
no. compressor will be running per stream and there is a
common air receiver provided for
If the above conditions are not fulfilled, the compressor will trip.
35
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
The total conveying air is spited into two segments. While one
part of air is directly provided to the conveying line and the
other part of air is allowed to enter the Air Lock Vessel from the
bottom. Referring to the construction detail of Air Lock Vessel,
it can be observed that the air induced into the vessel fluidizes
the ash and conveys the same through outlet of the vessel into
the transport line. As such, the two air are called Transport Air
and Fluidizing Air for regular reference.
There is a control requirement between the preparation of
Fluidizing Air and Transport Air. Accordingly, there are two
control valves to control the respective air flow. There is one
Pressure Transmitter provided at outlet of conveying line
control valve which indicate the back pressure of ash
conveying line. It is to be noted that the back pressure of
conveying air line is dependent on the actual flow condition of
ash in the transport air line. If the ash conveying is on the
higher side, the back pressure will be high and when the
transportation of ash comes down, it is generally assumed that
the ash flow has been reduced. PLC Control panel monitors
36
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
reduce the opening of fluidizing line control valve and increase
the opening of transport air line control valve. As such, the ash
discharge from the air lock vessel will reduce and system will
balance an optimum level. On the other hand back pressure
will drop in case there is less ash discharge from the air lock
vessel. Under such situation the fluidizing line control valve is
open to a higher percentage but upto the limit, allowing more
air to go in the air lock vessel. This will result in higher rate of
ash discharge from ALV. Correspondingly, conveying line back
pressure will increase and the PLC signal will reverse. With this
adjustment the ash conveying from pressure vessels will be
carried out pneumatically in a optimized condition and to
achieve desired ash flow capacity.
20.1 INTRODUCTION
The pump speed shall be varied through VFD drive over the
range of 10% to 100% of maximum flow rate. Necessary
remote and manual speed control provision is there. There are
37
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
two nos. of dedicated transformer to feed the power supply to
VFD and after VFD to HCSS motor.
PADDLE FEEDER
38
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
Zero level (0%) is set at the start of the lower part of tank. The
90% level is the maximum slurry level allowable in the tank.
There are five sets of HCSD Pump (4W + 1S) each having ash
disposal of 150 TPH (Dry ash basis) with motor and VFD are
provided for total five streams. Capacity of HCSD Pump is
156cu.m/hr @ 1500 MWC. Among the five independent high
concentration slurry disposal stream, two are working for each
unit and one is common standby. Five HCSD Pumps are
connected with four no. slurry disposal line with necessary
interconnection and instrumentation.
39
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
The start permissive of HCSD Pump from main PLC are as follows :
40
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
CONTROL WRITE UP
CHAPTER III
Control Systems
There are in total three nos. of control rooms for the entire Ash
Handling System as follows:
3. Silo Control Room: The silo control room is located in the silo
utility building. This room consists of a silo RIO cum control
41
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
There are also two nos. silo unloading panel located near the
silo platform. These panels are for operating the silo ash
unloading system.
42
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
43
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
The under listed drives are controlled by the Silo control room.
44
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
110
70 60
100
TIME (SEC.)
60
60
70
45
TECPRO ASHTECH LTD. KHAPERKHEDA T.P.S
EXPANSION PROJECT
(1 X 500 MW)
CONTROL WRITE UP
TATL DOC. No. 543-E-02
*****************
46
PROJECT: KHAPERKHEDA T.P.S. TATL DOC. NO.: 543-E-02
REV-R0
PACKAGE NAME: ASH HANDLING SYSTEM CONTROL WRITE-UP PROJECT NAME: Khaperkheda thermal Power Station extn:- 500
MW
PROTECTION INTERLOCK
CHAPTER IV
Interlocks Controlled
S.No. Equipment Ref. Drg. Annunciation Indications/ Mimic Controls Provided
Starting Permissive Running Permissive From
1 2 3 4 5 6 7 8 9
i) Seal water suction pressure i) Seal water suction pressure i) Discharge Water Pressure "Low" i) Red LAMP for pump "Start" i) Start & Stop push
above preset valve above preset valve (OS) (OS) button (OS)
ii) Green LAMP for pump ii) Auto Manual
ii) MCC module not disturbance ii) MCC module not disturbance ii) MCC module "Disturbance" (OS) "Stop" (OS) selector switch (OS)
HP & LP iii) Amber LAMP for pump
Seal Water iii) Start command initiated iii) LPBS not pressed iii) Inlet water Pressure Low (OS) "Trip" (OS)
Pump iv) Stop push button not iv) Red LAMP for Seal water
1 [Total 4 Nos. Dwg. No.: 543-01-iv) Remote Selection pressed. iv) Individual seal water pump fail (OS) inlet pressure Normal(OS) OS
(2W+2S) 01 v) Red LAMP for Seal water
Common for Discharge Pressure Normal
both units] v) LPBS not pressed (OS)
Note: v) No electrical trip
i) If selected pump is failed, then
another pump selected on standby
will start automatically subject to
i) MCC module not disturbance i) Seal water pressure normal i) Seal water pressure "Low" (OS) i) Red LAMP for pump "Start" i) Start & Stop push
(OS) button (OS)
ii) Start command initiated ii) MCC module not disturbance ii) MCC module "Disturbance" (OS) ii) Green LAMP for pump
Drain Sump "Stop" (OS)
Pump iii) Drain sump water level above iii) Stop push button not iii) Drain sump water " Danger Low" iii) Amber LAMP for pump
(Ash Slurry low pressed. (OS) "Trip" (OS)
P/H Area) iv) Drain sump water level iv) Drain sump pump "Failed". iv) Red LAMP for drain sump
2 Dwg. No.: 543-01- OS
[Total 2 Nos. iv) Remote Selection above danger low level "Low" (OS)
01
(1W+1S) v) Red lamp for Seal water
Common for v) LPBS not pressed v) LPBS not pressed pressure Normal (OS)
both units] vi) No electrical trip iv) Red LAMP for drain sump
level "High" (OS)
iv) Red LAMP for drain sump
level "Danger Low" (OS)
i) MCC module not disturbance i) Seal water pressure normal i) Seal water pressure "Low" (OS) i) Red LAMP for pump "Start" i) Start & Stop push
(OS) button (OS)
ii) MCC module not disturbance ii) MCC module "Disturbance" (OS) ii) Green LAMP for pump
ii) Remote Selection "Stop" (OS)
Sludge Pump iii) Start command initiated iii) Stop push button not iii) Sludge pump "Failed". iii) Amber LAMP for pump
(Settling pressed. "Trip" (OS)
47
PPD. BY: P.G. CONTROL WRITE UP
PROJECT: KHAPERKHEDA T.P.S. TATL DOC. NO.: 543-E-02
REV-R0
PACKAGE NAME: ASH HANDLING SYSTEM CONTROL WRITE-UP PROJECT NAME: Khaperkheda thermal Power Station extn:- 500
MW
PROTECTION INTERLOCK
CHAPTER IV
Interlocks Controlled
S.No. Equipment Ref. Drg. Annunciation Indications/ Mimic Controls Provided
Starting Permissive Running Permissive From
1 2 3 4 5 6 7 8 9
Tank) iv) Settling tank water level above iv) Settling tank water level iv) Settling Tank Level 'Danger Low'
3 [Total 2 Nos. Dwg. No.: 543-01- low above danger low (OS) iv) Red LAMP for Settling OS
(1W+1S) 01 Tank Level "Danger Low" (OS)
Common for v) Red lamp for Seal water
both units] v) LPBS not pressed v) LPBS not pressed pressure Normal (OS)
vi) No electrical trip iv) Red LAMP for sump level
"High" (OS)
iv) Red LAMP for drain level
"Danger Low" (OS)
i) Ash water sump level above i) MCC module not disturbance i) Ash water sump level "High" (OS) i) Red LAMP for pump"Start" i) Start & Stop push
low (OS) button (OS)
ii) MCC module not disturbance ii) Stop push button not pressed. ii) Ash water sump level "Low" (OS) ii) Green LAMP for pump
"Stop" (OS)
iii) Start command initiated iii) Ash Water Sump level iii) Ash water sump level "Danger iii) Amber LAMP for pump
above danger low Low" (OS) "Trip" (OS)
iv) Bearing temp. not high iv) MCC module "Disturbance" (OS) iv) Red LAMP for Ash water
iv) LPBS not pressed sump level "Danger Low" (OS)
v) Winding temp. not high v) No electrical trip v) Discharge Water Pressure "Low" for v) Red LAMP for Ash water
BAHP Water
common header (OS) sump level "High" (OS)
Pump [Total
4 Dwg. No.: 543-01- vi) Bearing temp. not too high vi) Electrical Trip (OS) vi) Red LAMP for Ash water OS
2 Nos.
05 vi) Remote Selection sump level "Low" (OS)
(1W+1S) ]
vii) Winding temp. not too high vii) Red LAMP for pump
discharge Water Pressure
vii) LPBS not pressed vii) Discharge pressure low.(OS) "Normal" (OS)
viii) MCC module available viii) Bearing temp. High (OS) viii) Read out of Bearing Temp
(OS)
ix) Winding temp. High (OS) ix) Read out of Winding Temp
(OS)
x) Individual pump failed (OS)
i) Ash water sump level above i) MCC module not disturbance i) MCC module "Disturbance" (OS) i) Red LAMP for pump "Start" i) Start & Stop Push
low (OS) button (OS)
ii) MCC module not disturbance ii) Stop push button not pressed. ii) Discharge Water Pressure "Low" for ii) Green LAMP for pump
common header (OS) "Stop" (OS)
iii) Start command initiated iii) Ash Water Sump level iii) Amber LAMP for pump
above danger level "Trip" (OS)
48
PPD. BY: P.G. CONTROL WRITE UP
PROJECT: KHAPERKHEDA T.P.S. TATL DOC. NO.: 543-E-02
REV-R0
PACKAGE NAME: ASH HANDLING SYSTEM CONTROL WRITE-UP PROJECT NAME: Khaperkheda thermal Power Station extn:- 500
MW
PROTECTION INTERLOCK
CHAPTER IV
Interlocks Controlled
S.No. Equipment Ref. Drg. Annunciation Indications/ Mimic Controls Provided
Starting Permissive Running Permissive From
1 2 3 4 5 6 7 8 9
BALP Water iv) MCC module available iii) Ash water sump level "High" (OS)iv) Red LAMP for pump
Pump [Total discharge Water Pressure
5 Dwg. No.: 543-01- OS
2 Nos. iv) LPBS not pressed "Normal" (OS)
05
(1W+1S) ] v) No electrical trip iv) Ash water sump level "Low" (OS) v) Red LAMP for Ash water
v) Remote Selection sump level "Danger Low" (OS)
v) Ash water sump level "Danger Low" vi) Red LAMP for Ash water
vi) LPBS not pressed (OS/ANN) sump level "High" (OS)
vi) Individual pump failed (OS) vii) Red LAMP for Ash water
sump level "Low" (OS)
vii) Discharge pressure low.(OS)
i) Ash water sump level above i) MCC module not disturbance i) MCC module "Disturbance" (OS) i) Red LAMP for pump "Start" i) Start & Stop Push
low (OS) button (OS)
ii) MCC module not disturbance ii) Stop push button not pressed. ii) Discharge Water Pressure "Low" for ii) Green LAMP for pump
common header (OS) "Stop" (OS)
iii)) Start command initiated iii)) Ash Water Sumpp level iii)) Amber LAMP for pump
p p
above danger level iii) Discharge pressure low.(OS) "Trip" (OS)
Refractory iv) No electrical trip iv) Electrical Trip (OS/ANN) iv) Red LAMP for pump
Cooling discharge Water Pressure
6 Water Pump Dwg. No.: 543-01- iv) Remote Selection "Normal" (OS) OS
[Total 2 Nos. 05 v) MCC module available v) Ash water sump level "High" (OS) v) Red LAMP for Ash water
(1W+1S) ] v ) LPBS not pressed sump level "Danger Low" (OS)
vi) Ash water sump level "Low" (OS) vi) Red LAMP for Ash water
vi ) LPBS not pressed sump level "High" (OS)
vii) Ash water sump level "Danger vii) Red LAMP for Ash water
Low" (OS/ANN) sump level "Low" (OS)
viii) Individual pump failed (OS)
i) Suction valve open i) Respective sump i) MCC module "Disturbance" (OS) i) Red LAMP for pump "Start" i) Start & Stop push
compartment above danger (OS) buttons for each series
level & fluid-coupling oil
pump (OS)
ii) Respective sump compartment ii) Seal water pressure Normal ii) Slurry sump level "High" (OS) ii) Green LAMP for pump
level above low level "Stop" (OS)
iii) Discharge Valve closed iii) Pump trip if the discharge iii) Slurry sump level "Low" (OS) iii) Amber LAMP for pump
valve fails to open within a "Trip" (OS)
preset time.
49
PPD. BY: P.G. CONTROL WRITE UP
PROJECT: KHAPERKHEDA T.P.S. TATL DOC. NO.: 543-E-02
REV-R0
PACKAGE NAME: ASH HANDLING SYSTEM CONTROL WRITE-UP PROJECT NAME: Khaperkheda thermal Power Station extn:- 500
MW
PROTECTION INTERLOCK
CHAPTER IV
Interlocks Controlled
S.No. Equipment Ref. Drg. Annunciation Indications/ Mimic Controls Provided
Starting Permissive Running Permissive From
1 2 3 4 5 6 7 8 9
iv)Fluid coupling cooling water iv) All/individual pumps of the iv) Slurry sump level "Danger Low" iv) Red LAMP for Slurry sump
pressure normal series start operating within a (OS/ANN) level "Danger Low" (OS)
preset time.
v) As soon as start command is v) Fluid coupling oil pump v) Fluid coupling oil pump Tripped v) Red LAMP for Slurry sump
initiated for any series, respective "Running" for first pump. (OS) level "High" (OS)
fluid coupling oil pump motor
will start automatically.
vi) Fluid coupling oil temp not vi) Slurry pump fluid coupling cooling vi) Red LAMP for Slurry sump
Ash Slurry vi) Remote Selection high water pressure "Low" (OS) level "Low" (OS)
vii) Fluid coupling oil temp below vii) MCC module not vii) Fluid coupling oil temp "High" vii) Red LAMP for pump OS
Pump
8 Dwg. No.: 543-01-high disturbance (OS) discharge slurry Pressure
[Total 5 X 2
05 "Low" (OS)
Nos. ]
viii) MCC module not viii) Stop push button not viii) Electrical Trip (OS) viii) Fluid coupling oil pump
disturbance pressed. Tripped (OS)
ix) Start command initiated ix) No electrical trip ix) Slurry pump fluid coupling
cooling water pressure "Low"
(OS)
x) second stage pump start after ix) Pump discharge slurry pressure x) Fluid coupling oil temp.
getting the running feedback of "Low" (OS) "High" (OS)
first stage pump considering all
the start permissive within preset
time delay. x ) LPBS not pressed
x) Slurry pump individual series failed viii) Red Lamp for pump seal
xi ) LPBS not pressed (OS) Water Pressure "normal" (OS)
Note: xi) Seal water pressure "Low" (OS)
i) Second stage pump run
feedback will open the discharge
valve.
ii) Other series of pumps starts
after preset time delay.
i) Open/Close Selector
i) Red lamp for valve open (OS) switch (OS)
Ash Slurry ii) Green lamp for valve close
Pump (OS)
Suction Dwg. No.: 543-01-
9 OS
Valve 05
[Total 3 Nos.
]
50
PPD. BY: P.G. CONTROL WRITE UP
PROJECT: KHAPERKHEDA T.P.S. TATL DOC. NO.: 543-E-02
REV-R0
PACKAGE NAME: ASH HANDLING SYSTEM CONTROL WRITE-UP PROJECT NAME: Khaperkheda thermal Power Station extn:- 500
MW
PROTECTION INTERLOCK
CHAPTER IV
Interlocks Controlled
S.No. Equipment Ref. Drg. Annunciation Indications/ Mimic Controls Provided
Starting Permissive Running Permissive From
1 2 3 4 5 6 7 8 9
]
Second pump running Series not trip i) Red lamp for valve open (OS) i) Open/Close Selector
Ash Slurry Note: ii) Green lamp for valve close switch (OS)
Pump (OS)
Discharge Dwg. No.: 543-01-valve opens after preset time OS
10
Valve 05 delay of 2nd series pump start
[Total 3 Nos. command
]
i) In Auto Mode Ash Slurry Sump i) In Auto Mode closes i) Red lamp for valve "Open" i) Open- Close- Auto
's water level low automatically when ash slurry (OS) selector switch (OS)
sump level reaches high level
Ash Slurry
only.
Sump Make
Dwg. No.: 543-01-or or ii) Green lamp for valve "Close"
11 up water OS
05 (OS)
valve
[Total 1 No ] ii)Through selector switch at ii)Through selector switch at
"Open" position "Close"position (OS)
i) BA Overflow Sump level above i) Seal water pressure "Normal" i) Seal water pressure "Low" (OS) i) Red Lamp for Pump "Start" i) Stop Push button
low (OS/BALP) (BALP)
ii) MCC module not disturbance ii) MCC module not disturbance ii) Discharge water pressure "Low" ii) Green LAMP for pump ii) Pump# 1or 2
(OS) "Stop" (OS/BALP) selector switch (BALP)
iii) Start P.B. switch actuated iii) Respective BAOF sump iii) BA Overflow sump level "High" iii) Amber LAMP for pump
level above danger level (OS) "Trip" (OS)
iv) Stop push button not iv) BA Overflow sump level "Low" iv) Red LAMP for BAOF sump
BA Overflow iv) Remote Selection pressed. (OS) level "High" (OS/BALP)
Pump v) BA Overflow sump level "Danger v) Red LAMP for BAOF sump
12 Dwg. No.: 543-01- BALP
[Total 2 Nos. v ) LPBS not pressed v ) LPBS not pressed Low" (OS) level "Low" (OS/BALP)
01
(1W+1S) ] vi) No electrical trip vi) Individual BA Overflow pump vi) Red LAMP for BAOF sump
failed (OS) level "Danger Low"
(OS/BALP)
51
PPD. BY: P.G. CONTROL WRITE UP
PROJECT: KHAPERKHEDA T.P.S. TATL DOC. NO.: 543-E-02
REV-R0
PACKAGE NAME: ASH HANDLING SYSTEM CONTROL WRITE-UP PROJECT NAME: Khaperkheda thermal Power Station extn:- 500
MW
PROTECTION INTERLOCK
CHAPTER IV
Interlocks Controlled
S.No. Equipment Ref. Drg. Annunciation Indications/ Mimic Controls Provided
Starting Permissive Running Permissive From
1 2 3 4 5 6 7 8 9
vii) MCC module "Disturbance" (OS) vii) Red Lamp for pump
discharge Water Pressure
"normal" (OS/BALP)
The Following Starting & Running Permissive will be applicable i) Grinder seal water pressure "Low" i) Red Lamp - grinder running i) Forward push button
for Clinker Crusher irrespective of mode of reversal (OS) in forward direction (OS/ (BALP)
BALP)
ii) MCC module "Disturbance" (OS) ii) Green lamp - grinder ii) Reverse push button
stopped (OS/ BALP) (BALP)
i) Seal water pressure for corresponding grinder "Normal" iii) Clinker Grinder "Jammed" iii) Blue lamp - grinder running iii) Stop push button
(OS/ANN BALP) in reverse directions (OS/ (BALP)
BALP)
ii) MCC module not "Disturbance" iv) BA jet-pump inlet water pressure iv) Amber LAMP for grinder iv) Auto-Manual
"Low" (OS) "Trip" (OS) selector switch (BALP)
(2 nos)
iii) Start P.B. switch actuated v) Red Lamp BA jet-pump inlet v) Grinder selector
water pressure "Normal"(OS/ switch (BALP) (2 nos)
BALP)
iv) Standby Clinker Grinder of same section of B.A. hopper not vi) Red Lamp Clinker Grinder
Clinker
running seal water pressure
Grinder
13 Dwg. No.: 543-01- "Normal"(OS/ BALP) BALP
[Total 4 Nos.
01 v) Jet pump inlet water pressure for corresponding grinder vii) Amber lamp for Clinker
(2W+2S) ]
"Normal" Grinder Jammed (OS)
vi) Remote Selection
vii) No electrical trip
Note: In Auto mode of operation in the event of tripping of the
clinker grinder motor due to its overloading, the motor will
automatically reverse in rotation, subject to availability of seal
water pressure, in short impulse to remove the jammed
material. Reversal operation will continue for a preset time
period after which the motor will again start rotating in normal
direction. Even if after three times consecutive forward and
reverse rotation, overload persists due to jamming after or if
not the motor had already tripped during reversal operation,
the motor will trip with parallel closure of feeder gate. The
Clinker grinder can be restarted only after judiciously selected
preset time period
52
PPD. BY: P.G. CONTROL WRITE UP
PROJECT: KHAPERKHEDA T.P.S. TATL DOC. NO.: 543-E-02
REV-R0
PACKAGE NAME: ASH HANDLING SYSTEM CONTROL WRITE-UP PROJECT NAME: Khaperkheda thermal Power Station extn:- 500
MW
PROTECTION INTERLOCK
CHAPTER IV
Interlocks Controlled
S.No. Equipment Ref. Drg. Annunciation Indications/ Mimic Controls Provided
Starting Permissive Running Permissive From
1 2 3 4 5 6 7 8 9
i) BA Jet Pump Water Suction valve i) Red Lamp valve open (OS/ i) Open/Close Selector
"Failed" (OS) BALP) switch (BALP)
ii) Green Lamp valve closed
BA Jet Pump (OS/ BALP)
Water line
14 valve Dwg. No.: 543-01- BALP
[Total 2 01
Nos.]
i) Other gate connected to same V i) Clinker Grinder is Running in i) Red Lamp feed gate fully i) Open/Close selector
section is fully closed. forward direction. i) Hopper Feed Gate "Failed" (OS) open (OS/ BALP) switch (BALP)
ii) Clinker Grinder is running in ii) Selector Switch not in Close ii) Green Lamp feed gate fully
forward direction Position closed (OS/ BALP)
BA Hopper iii) Selector Switch in Open
Feed Gate Position
15 Dwg. No.: 543-01- BALP
[Total 4 Nos.
01
(2W+2S)]
i) In Auto Mode BA Overflow i) In Auto Mode closes i)Overflow Sump make-Up Valve i) Red lamp for valve "Open" i) Open- Close- Auto
Sump 's water level is at low automatically when BA "Failed" (OS/BALP) selector switch (BALP)
overflow sump level reaches
high level only.
BA Overflow
Sump Make- Dwg. No.: 543-01-or or (OS)
16 ii)Through selector switch at ii)Through selector switch at ii) Green lamp for valve "Close" BALP
Up valve 01
[Total 1 No ] "Open" position "Close" position (BALP) (OS/BALP)
53
PPD. BY: P.G. CONTROL WRITE UP
PROJECT: KHAPERKHEDA T.P.S. TATL DOC. NO.: 543-E-02
REV-R0
PACKAGE NAME: ASH HANDLING SYSTEM CONTROL WRITE-UP PROJECT NAME: Khaperkheda thermal Power Station extn:- 500
MW
PROTECTION INTERLOCK
CHAPTER IV
Interlocks Controlled
S.No. Equipment Ref. Drg. Annunciation Indications/ Mimic Controls Provided
Starting Permissive Running Permissive From
1 2 3 4 5 6 7 8 9
i) MCC module not disturbance i) Seal water pressure above low i) Seal water pressure "Low" (OS) i) Red LAMP for pump "Start" i) Start & Stop push OS
(OS) button (OS)
ii) MCC module not disturbance ii) MCC module "Disturbance" (OS) ii) Green LAMP for pump
ii) Remote Selection "Stop" (OS)
iii) Start command initiated iii) Sump level above danger iii) Individual Drain sump pump failed. iii) Amber LAMP for pump
Drain Sump
low "Trip" (OS)
Pump
iv) Sump level above low iv) Stop push button not iv) red LAMP for sump level
(Mechanical
17 Dwg. No.: 543-01- pressed. 'High' (OS)
Exh. Area)
02 iv) Drain Sump Level 'High' (OS) v) Red LAMP for sump level
[Total 2 Nos.
v ) LPBS not pressed v ) LPBS not pressed 'Danger Low' (OS)
(1W+1S) ]
vi) No electrical trip Discharge pressure "Low" (OS) vi) Red LAMP for sump level
'Low' (OS)
vi) Drain Sump Level 'Danger Low' vii) Red Lamp for pump seal
(OS) Water Pressure "normal" (OS)
Open one at a time Remains open provided Ash Intake Valve Failed (OS) LAMP Display unit i) By pass facility for OS
forindicating the hopper each A/I valve through
number which is under OS.
operating in red colour.
in sequence per stream provided For Manual Mode: Hopper Plugged (OS)
For Manual Mode: i) Vacuum Breaker closed
i) Vacuum Breaker closed ii) Selected branch header valve
open
ii) Selected branch header valve iii) Vacuum pump running
open
iii) Vacuum pump running iv) Silo ash level below high
54
PPD. BY: P.G. CONTROL WRITE UP
PROJECT: KHAPERKHEDA T.P.S. TATL DOC. NO.: 543-E-02
REV-R0
PACKAGE NAME: ASH HANDLING SYSTEM CONTROL WRITE-UP PROJECT NAME: Khaperkheda thermal Power Station extn:- 500
MW
PROTECTION INTERLOCK
CHAPTER IV
Interlocks Controlled
S.No. Equipment Ref. Drg. Annunciation Indications/ Mimic Controls Provided
Starting Permissive Running Permissive From
1 2 3 4 5 6 7 8 9
i) Vacuum Breaker closed ii)Vacuum Pump running
i) Vacuum Breker Close i) Vacuum Breker Close Branch Header Valve Failed (OS) i) Red lamp for valve Open
(OS)
i) Seal water pressure is adequate i) Seal water pressure is i) Seal water pressure "Low" (OS) i) Red LAMP for pump "Start" i) Start & Stop Push
adequate (OS) Buttons (OS)
ii) MCC module not disturbance ii) MCC module not disturbance ii) MCC module "Disturbance" (OS) ii) Green LAMP for pump
"Stop" (OS)
Vacuum iii) Amber LAMP for pump
Pump iii) Remote Selection iii ) LPBS not pressed "Trip" (OS)
20 Dwg. No.: 543-01-iv) Start command initiated iv) Stop push button not iii) Individual pump failed (OS) iv) Red Lamp for pump seal OS
[Total 6 Nos.
02 pressed. Water Pressure "normal" (OS)
(4W+2S) ]
v) Vacuum breaker open v) No electrical trip
vi) Suction valve of standby
vacuum pump is closed
vii ) LPBS not pressed
55
PPD. BY: P.G. CONTROL WRITE UP
PROJECT: KHAPERKHEDA T.P.S. TATL DOC. NO.: 543-E-02
REV-R0
PACKAGE NAME: ASH HANDLING SYSTEM CONTROL WRITE-UP PROJECT NAME: Khaperkheda thermal Power Station extn:- 500
MW
PROTECTION INTERLOCK
CHAPTER IV
Interlocks Controlled
S.No. Equipment Ref. Drg. Annunciation Indications/ Mimic Controls Provided
Starting Permissive Running Permissive From
1 2 3 4 5 6 7 8 9
i) Corresponding vacuum pump i) Corresponding vacuum pump Vacuum Pump Suction Valve Failed i) Red lamp for valve Open Open/ Close selector
running running (OS) (OS) switch (OS)
ii) Green lamp for valve Close
Vacuum
(OS)
Pump
21 Dwg. No.: 543-01- OS
Suction
02
Valve
i) Start command initiated. i) MCC module not disturbance i) MCC module "Disturbance" (OS) i) Red LAMP for blower "Start" i) Start & Stop Push
(OS) Buttons (OS)
ESP & ii) MCC module not disturbance ii) Discharge pressure "low" ii) Green LAMP for blower
Buffer ii ) LPBS not pressed "Stop" (OS)
Hopper
pp iii)) Stopp push
p button not iii)) Amber LAMP for blower
22 Fluidizing Dwg. No.: 543-01-iii) Remote Selection pressed. "Trip" (OS) OS
Blower 02 iv ) LPBS not pressed iv) No electrical trip
[Total 2 Nos.
(1W+1S) ]
i) Corresponding air blower is i) Till start permissive are i) Fluidizing blower air heater i) Red Lamp for heater ''ON' i)Start & Stop Push
running available If temp. in header temperature "Low-" (OS) (OS) Buttons (OS)
crosses the preset value heater
ESP & ii) Heater temp. is below preset will be 'OFF' and restarts after ii) Green lamp for heater 'OFF'
Buffer value droppingdown temp. below (OS)
Hopper iii) Start command initiated. preset value. iii) Red lamp for temperature
Fluidizing Dwg. No.: 543-01- normal (OS)
23 OS
Blower Air 02
Heater iv) MCC module not disturbance ii) MCC module not disturbance iv) Red Lamp for outlet
[Total 2 Nos. pressure normal(OS)
(1W+1S) ] v) Outlet air pressure is above iii) MCC module available
preset value
vi) Remote Selection iv ) LPBS not pressed
vii ) LPBS not pressed v) No electrical trip
i) All start pernissive are i) Red lamp for Ash Intake i) Start-Stop PB for
i) Instrument air pr. Is adequate available. i) Hopper empty (OS) Valve Open (OS) each stream (OS)
56
PPD. BY: P.G. CONTROL WRITE UP
PROJECT: KHAPERKHEDA T.P.S. TATL DOC. NO.: 543-E-02
REV-R0
PACKAGE NAME: ASH HANDLING SYSTEM CONTROL WRITE-UP PROJECT NAME: Khaperkheda thermal Power Station extn:- 500
MW
PROTECTION INTERLOCK
CHAPTER IV
Interlocks Controlled
S.No. Equipment Ref. Drg. Annunciation Indications/ Mimic Controls Provided
Starting Permissive Running Permissive From
1 2 3 4 5 6 7 8 9
ii) In case transport air line
pressure increases above preset
value running fluidzing valve to
airlock vessel will close and ii) Auto / Manual
ii) Start command is initiated reopens as soon as pressure ii) Red lamp for Branch Header Selection through
through start push button. drops down to preset value ii) Vacuum breaker open (OS) valve open (OS) monitor (OS)
iii) Green lamp for Branch iii) Silo selector switch
iii) Silo is selected iii) FA Hopper plugged (OS) Header valve closed (OS) common system (OS)
Fly Ash
24 Dwg. No.: 543-01- iii) As soon as "silo is selected OS
System
02 and "start" comand of respective
group is initiated operation of iv) Transport air line
ALV will start sequentially. stream selection valve
open/ close selection
iv) No load vacuum established switch(OS)
v) Vacuum pump is running &
corresponding
di vacuum breaker
b k
close
iv) Transport air line stream
selection valve is open.
i) Vacuum Pump is operating i) Vacuum Pump is operating Vacuum Breaker Failed (OS) i) Red Lamp for Breaker i) Open/Close Selector
ii) Vacuum level not very high ii) Vacuum level not very high Close (OS) switch (OS)
Vacuum
Breaker
25 (Dry system) Dwg. No.: 543-01- OWS
[Dry System 03
Total 4 Nos. ]
57
PPD. BY: P.G. CONTROL WRITE UP
PROJECT: KHAPERKHEDA T.P.S. TATL DOC. NO.: 543-E-02
REV-R0
PACKAGE NAME: ASH HANDLING SYSTEM CONTROL WRITE-UP PROJECT NAME: Khaperkheda thermal Power Station extn:- 500
MW
PROTECTION INTERLOCK
CHAPTER IV
Interlocks Controlled
S.No. Equipment Ref. Drg. Annunciation Indications/ Mimic Controls Provided
Starting Permissive Running Permissive From
1 2 3 4 5 6 7 8 9
i) Bag filter differential pressure high i)Start & Stop Push
i) Plant IA pressure is adequate i) Pulse valves remain open (OS) i) Red Lamp for timer ON (OS) Buttons (OS)
Pressure at air receiver is below operate till all start permissive ii) Air Receiver pressure "Low" (OS) "Start" (OS) push button (OS)
preset value. are available. iii) Cooling water pressure "Low" (OS) ii) Green LAMP for TAC
ii) Discharge temp. normal ii) Compressor can be started iv) Return water Temp. "High" (OS) "Stop" (OS)
iii) Cooling water pressure above
low through push button & v) Diff. Pressure across iii) Amber LAMP for TAC
Transport Air
iv) Return line Temp. normal continue to run between load & suction filter "High" (OS) "Trip" (OS)
Compressor
27 (TAC) Dwg. No.: 543-01-v) Diff. Pressure across unload condition through vi) Individual TAC Trip (OS) iv) Cooling water pressure OS
[Total 6 Nos. 03 suction filter normal pressure switch. vii) Bearing temp. High (OS) "Low" (OS)
(4W+2S) ]
iii) Stop push button not v) Return water Temp. " High"
vi) MCC module not disturbance pressed. viii) Winding temp. High (OS) (OS)
vii) Remote Selection iv ) LPBS not pressed vi) Diff. Pressure across
viii) Start command initiated v) No electrical trip suction filter "High" (OS)
ix) No electrical trip vii) Air Receiver pressure
58
PPD. BY: P.G. CONTROL WRITE UP
PROJECT: KHAPERKHEDA T.P.S. TATL DOC. NO.: 543-E-02
REV-R0
PACKAGE NAME: ASH HANDLING SYSTEM CONTROL WRITE-UP PROJECT NAME: Khaperkheda thermal Power Station extn:- 500
MW
PROTECTION INTERLOCK
CHAPTER IV
Interlocks Controlled
S.No. Equipment Ref. Drg. Annunciation Indications/ Mimic Controls Provided
Starting Permissive Running Permissive From
1 2 3 4 5 6 7 8 9
x) Bearing temp. not too high "Low" (OS)
xi) Winding temp. not too high viii) Bearing temp. High (OS)
xii ) LPBS not pressed ix) Winding temp. High (OS)
Remains open for preset time or
upto ALV level high whichever i) Red Lamp for valve "Open" i) Open/Close Selector
is earlier Air Lock Ash Intake Valve Failed (OS) (OS) switch (OS)
i) ALV cycle start command is ii) Green Lamp for valve
Air lock inlet initiated i) stop command not pressed "Close" (OS)
valve ii) Respective buffer hopper iii) Red lamp for ALV level
28 Dwg. No.: 543-01-selected ii) ALV not deselected high (OS) OS
[Total 8 Nos.
03
] iii) ESP Fluidizing Blower
running iii) Silo level not high
iv) ALV ash level below high
v) Silo level not high
59
PPD. BY: P.G. CONTROL WRITE UP
PROJECT: KHAPERKHEDA T.P.S. TATL DOC. NO.: 543-E-02
REV-R0
PACKAGE NAME: ASH HANDLING SYSTEM CONTROL WRITE-UP PROJECT NAME: Khaperkheda thermal Power Station extn:- 500
MW
PROTECTION INTERLOCK
CHAPTER IV
Interlocks Controlled
S.No. Equipment Ref. Drg. Annunciation Indications/ Mimic Controls Provided
Starting Permissive Running Permissive From
1 2 3 4 5 6 7 8 9
Remains connected for preset i) Red Lamp for valve "Open" i) Open/Close Selector
i) Discharge valve is close. time Air Lock Fluidising Valve Failed (OS) (OS) switch (OS)
Air lock
ii) Equilizer valve fully closed.
fluidzing
Dwg. No.: 543-01-iii) Air lock inlet valve is fully ii) Green Lamp for valve
31 valve OS
03 closed. "Close" (OS)
[Total 8 Nos.
iv) Conveying air pressure not
]
high
i) The compressor starts, i) The compressor continue to i) Red LAMP for IAC "Start" i) Start & Stop push
provided operate till all start permissive i) MCC module "Disturbance" (OS) (OS) button (OS)
are available. In manual mode ii)Air Receiver Pressure 'Low' ii) Green LAMP for IAC "Stop"
Pressure at air receiver is below compressor can be started (OS/ANN) (OS) ii)Auto-Manual
through push button &continue iii) Amber LAMP for IAC iii) IAC#1&2 selctor
preset value. to run between load &unload iii) Cooling water pressure "Low" (OS) "Trip" (OS) switch (OS)
condition through pressure iv) Return water Temperature " High" iv) Red lamp for Air Receiver
ii) Discharge temp. normal switch. In auto mode (OS) Pressure 'Low' (OS)
compressor will start v) Red lamp for Cooling water
iii) Lub. oil pressure above low automatically below preset v) IAC "Failed" pressure "normal" (OS)
iv) Cooling water pressure above pressure and will continue to vi) Red lamp forReturn water
low run till pressure reaches above vi) Lub oil pressure Low (OS) temperature "High" (OS)
v) Return water temperature preset pressure
below high vii) Diff. Pressure across suction
vi) Diff. Pressure across filter High (OS)
suction filter normal
I t t
60
PPD. BY: P.G. CONTROL WRITE UP
PROJECT: KHAPERKHEDA T.P.S. TATL DOC. NO.: 543-E-02
REV-R0
PACKAGE NAME: ASH HANDLING SYSTEM CONTROL WRITE-UP PROJECT NAME: Khaperkheda thermal Power Station extn:- 500
MW
PROTECTION INTERLOCK
CHAPTER IV
Interlocks Controlled
S.No. Equipment Ref. Drg. Annunciation Indications/ Mimic Controls Provided
Starting Permissive Running Permissive From
1 2 3 4 5 6 7 8 9
Instrument
Air
vii) MCC module not disturbance
Compressor
Dwg. No.: 543-01-viii) Remote Selection
33 (In Plant OS
03
Area)
[Total 2 Nos. ii) Compressure will continue to
(1W+1S) ] run on full capacity and after
reaching the unloading point
Compressor will automatically
unload with the help of
ix) Start command initiated unloading pressure switch.
iii) During starting lubricating
oil pressure is bypassed for
preset time delay. The
compressor will trip if lub oil
pressure is not normal within
v ) LPBS not pressed preset time.
Note:
In auto mode if one compressor
trips the standby compressor
starts after preset time if other iv) Stop push button not
start permissives are available pressed.
v ) LPBS not pressed
i) Monitor & indications on Dryer local i) Red lamp IAC dryer
i) Respective IAC is running i) Respective IAC is running panel operating (OS)
Instrument ii) Green LAMP for IAC Drier
Air Dryer ii) MCC module not disturbance ii) MCC module not disturbance ii) Instrument air dryer "Failed" "Stop" (OS)
(In Plant Dwg. No.: 543-01- iii) Amber LAMP for IAC Drier
34 OS
Area) 03 iii) MCC module not disturbance "Trip" (OS)
[Total 2 Nos.
(1W+1S) ]
61
PPD. BY: P.G. CONTROL WRITE UP
PROJECT: KHAPERKHEDA T.P.S. TATL DOC. NO.: 543-E-02
REV-R0
PACKAGE NAME: ASH HANDLING SYSTEM CONTROL WRITE-UP PROJECT NAME: Khaperkheda thermal Power Station extn:- 500
MW
PROTECTION INTERLOCK
CHAPTER IV
Interlocks Controlled
S.No. Equipment Ref. Drg. Annunciation Indications/ Mimic Controls Provided
Starting Permissive Running Permissive From
1 2 3 4 5 6 7 8 9
Conveying
Line Control Dwg. No.: 543-01-iii) start command initiated i) Stop command not actuated
35
Valve [4 03
Nos.]
Fluidizing
Line Control Dwg. No.: 543-01-iii) start command initiated i) Stop command not actuated
36
Valve [4 Nos. 03
]
i) Start command initiated. i) MCC module not disturbance i) MCC module "Disturbance" (OS) i) Red LAMP for blower i) Start & Stop
ii) MCC module not disturbance ii ) LPBS not pressed ii) Discharge pressure "low" "Start" (OS/ SCP) Push Buttons (SCP)
Silo Aeration
iii) Stop push button not
Blower
37 Dwg. No.: 543-01-iii) Remote Selection pressed. iii) Blower failed ii) Green LAMP for blower SCP
[Total 3 Nos.
04 iv) No electrical trip
(2W+1S) ]
ii ) LPBS not pressed "Stop" (OS/SCP)
"Trip" (OS)
i) Corresponding air blower i) Till start permissive i) Red lamp heater i) On & Off
is running are available If temp. in header "ON" (OS/SCP) push button (SCP)
crosses the preset value heater
ii) Heater temp. is below will ii) Green lamp heater
Sil A i
62
PPD. BY: P.G. CONTROL WRITE UP
PROJECT: KHAPERKHEDA T.P.S. TATL DOC. NO.: 543-E-02
REV-R0
PACKAGE NAME: ASH HANDLING SYSTEM CONTROL WRITE-UP PROJECT NAME: Khaperkheda thermal Power Station extn:- 500
MW
PROTECTION INTERLOCK
CHAPTER IV
Interlocks Controlled
S.No. Equipment Ref. Drg. Annunciation Indications/ Mimic Controls Provided
Starting Permissive Running Permissive From
1 2 3 4 5 6 7 8 9
Silo Aeration be 'OFF' and restarts after
Heater [Total
38 Dwg. No.: 543-01-preset value dropping OFF' (OS/SCP) SCP
3 Nos.
04
(2W+1S) ] iii) Start command initiated. down temp. below preset value. iii) Amber LAMP for heater
iv) MCC module not disturbance ii) MCC module not disturbance "Trip" (OS)
v) Remote Selection iii) No electrical trip
i) MCC module not disturbance i) Seal water pressure above low i) Seal water pressure "Low" (OS) i) Red LAMP for pump i) Start & Stop
ii) Remote Selection ii) MCC module not disturbance ii) MCC module "Disturbance" (OS) "Start" (OS/SCP) push button (SCP)
Drain Sump iii) Start command initiated iii ) LPBS not pressed iii) Drain sump water level ii) Green LAMP for pump
Pump iv) Drain sump water level above iv) Stop push button not
(Ash Silo
39 Dwg. No.: 543-01-low pressed. "Danger Low" (OS) "Stop" (OS/SCP) SCP
Area)
04 v ) LPBS not pressed v) Drain sump water level iv) Drain sump pump iii) Amber LAMP for pump
[Total 2 Nos.
(1W+1S) ] above danger low "Failed" "Trip" (OS)
vi) No electrical trip iv) Red LAMP for drain sump
level "Danger Low" (OS/SCP)
v)Red lamp for seal water
pressure
normal (OS)
i)MCC module not disturbance i) MCC module not disturbance i) Discharge Water Pressure "Low" i) Red LAMP for pump i) Start & Stop
ii) Remote Selection ii ) LPBS not pressed for common header (OS) "Start" (OS/SCP) push button (SCP)
iii) Stop push button not
iii) Start command initiated pressed. ii) MCC module "Disturbance" (OS) ii) Green LAMP for pump
iv) Silo area Ash water sump iv) Silo Ash water sump iii) Dust conditioner water pump "Stop" (OS/SCP)
level above low level above danger low "Failed" iii) Amber LAMP for pump
Dust
Conditioner v) Atleast one isolation valve v) Atleast one isolation valve iv) Ash water sump level "High" (OS) "Trip" (OS)
63
PPD. BY: P.G. CONTROL WRITE UP
PROJECT: KHAPERKHEDA T.P.S. TATL DOC. NO.: 543-E-02
REV-R0
PACKAGE NAME: ASH HANDLING SYSTEM CONTROL WRITE-UP PROJECT NAME: Khaperkheda thermal Power Station extn:- 500
MW
PROTECTION INTERLOCK
CHAPTER IV
Interlocks Controlled
S.No. Equipment Ref. Drg. Annunciation Indications/ Mimic Controls Provided
Starting Permissive Running Permissive From
1 2
Conditioner 3 4 5 6 7 8 9
40 Water Pump Dwg. No.: 543-01- iv) Red LAMP for pump SCP
[Total 2 Nos. 04 for dust conditioner open for dust conditioner open v) Ash water sump level "Low" (OS) discharge
(1W+1S) ] vi) No electrical trip Water Pressure "Normal"
vi ) LPBS not pressed (OS/SCP)
v) Red LAMP for Ash water
"Danger Low" (OS/ANN) sump
level "Danger Low" (OS/SCP)
vi) Red LAMP for Ash water
sump
level "High" (OS/SCP)
vii) Red LAMP for Ash water
sump
level "Low" (OS/SCP)
Ash Water Sump Makeup Valve failed
i)Through
) g selector switch. i)Through
) g selector switch. ( )
(OS) i)) Red lampp for valve i)) Open-
p Close
when sump level reaches low when sump level reaches low
Ash Water
level level "Open" (OS/SCP) selector switch (SCP)
Sump
Dwg. No.:543-01- or or ii) Green lamp for valve
41 Make- Up SCP
04 through selector switch in open through selector switch in open ii) Auto Manual
valve
position position "Close" (OS/SCP) selector switch (SCP)
[Total 1 No]
64
PPD. BY: P.G. CONTROL WRITE UP
PROJECT: KHAPERKHEDA T.P.S. TATL DOC. NO.: 543-E-02
REV-R0
PACKAGE NAME: ASH HANDLING SYSTEM CONTROL WRITE-UP PROJECT NAME: Khaperkheda thermal Power Station extn:- 500
MW
PROTECTION INTERLOCK
CHAPTER IV
Interlocks Controlled
S.No. Equipment Ref. Drg. Annunciation Indications/ Mimic Controls Provided
Starting Permissive Running Permissive From
1 2 3 4 5 6 7 8 9
i) "STOP" command is not
i) "START" command initiated i) MCC module "Disturbance" (OS) i) Red lamp for RF i) Start and stop
Rotary is initiated ii) MCC module not disturbance operating (SULP) push button (SULP)
Feeder above ii) MCC module not disturbance iii ) LPBS not pressed ii) Green lamp for not in
Silo iii) Remote Selection iv) No electrical trip operation (SULCP)
43 Telescopic Dwg. No.: 543-01- v) Tellescopic spout full SULP
chute 04 iv ) LPBS not pressed lowered. iii) Amber Lamp for Trip (os)
[for each Silo
unit] v) Tellescopic spout full lowered.
i) Respective 'RF'
RF is operating i)Rotary feeder is operating KGV Above Rotary Feeder Failed (OS) i) Red lamp for valve open i) Open and Close
KGV above ii) Close command is not
Rotary ii) Open command is initiated. initiated. (SULP) push button (SULP)
Feeder and iii) Dust conditioner is running ii) Green lamp for valve close
44 Rotary Dwg. No.: 543-01-iii) Dust conditioner is running (SULP) SULP
Unloader 04
[Total 1 No
for each silo]
i) Respective 'RF' is operating i)Rotary feeder is operating KGV Above Telescopic Spout Failed i) Red lamp for valve open i) Open and Close
KGV above ii) Close command is not
Rotary ii) Open command is initiated. initiated. (OS) (SULP) push button (SULP)
Feeder and
Silo iii) Scavanger fan is running. iii) Scavanger fan is running. ii) Green lamp for valve close
45 Dwg. No.: 543-01- SULP
Telescopic iv) Ash level of close tanker is not
04
chute [Total high. iv) High level of close tanker (SULP)
1 No for each
silo] is not achieves.
65
PPD. BY: P.G. CONTROL WRITE UP
PROJECT: KHAPERKHEDA T.P.S. TATL DOC. NO.: 543-E-02
REV-R0
PACKAGE NAME: ASH HANDLING SYSTEM CONTROL WRITE-UP PROJECT NAME: Khaperkheda thermal Power Station extn:- 500
MW
PROTECTION INTERLOCK
CHAPTER IV
Interlocks Controlled
S.No. Equipment Ref. Drg. Annunciation Indications/ Mimic Controls Provided
Starting Permissive Running Permissive From
1 2 3 4 5 6 7 8 9
i) MCC module not disturbance i) MCC module not disturbance i) MCC module "Disturbance" (OS) i) Red Lamp for fan Start-Stop P.B. (SULP)
Scavanger iii) Remote Selection iii ) LPBS not pressed "Start" (SULP)
Fan
47 Dwg. No.: 543-01-iii) Start initiated iii) stop not pressed ii) Green Lamp for fan SULP
[Total 1 No
04 iv) Lower limit switch of iv) No electrical trip
for each unit]
telescopic spout actuated "Stop" (SULP)
iii ) LPBS not pressed
66
PPD. BY: P.G. CONTROL WRITE UP
PROJECT: KHAPERKHEDA T.P.S. TATL DOC. NO.: 543-E-02
REV-R0
PACKAGE NAME: ASH HANDLING SYSTEM CONTROL WRITE-UP PROJECT NAME: Khaperkheda thermal Power Station extn:- 500
MW
PROTECTION INTERLOCK
CHAPTER IV
Interlocks Controlled
S.No. Equipment Ref. Drg. Annunciation Indications/ Mimic Controls Provided
Starting Permissive Running Permissive From
1 2 3 4 5 6 7 8 9
i) Corrsponding silo selected i) Corrsponding silo selected Ash Inlet Valve to Silo Failed (OS/) i) Red lamp for i) Close-open selector
ii) Corresponding ash inlet valve ii) Corresponding ash inlet valve open (OS/SCP) switch (SCP)
Ash Inlet
Valve to Silo of other silo close valve of other silo close ii) Green lamp for valve
49 Dwg. No.: 543-01- SCP
[Total 4 Nos. close (OS/SCP)
04
for each silo]
i) MCC module not disturbance i) MCC module not disturbance i) MCC disturbance (OS) i) Red Lamp for fan i) Start and stop
iii) Remote Selection iii ) LPBS not pressed ii) Rotary unloader failed (Gr. Ann) "Start" (SULP) push button (SULP)
Rotary iii) Start command initiated iii) Stop command not initiated ii) Green Lamp for fan
50 Unloader Dwg. No.: 543-01- SULP
iv) Inlet water pressure normal iv) Inlet water pressure normal "Stop" (SULP)
[ 2 nos.] 04
iii ) LPBS not pressed v) No electrical trip
67
PPD. BY: P.G. CONTROL WRITE UP
PROJECT: KHAPERKHEDA T.P.S. TATL DOC. NO.: 543-E-02
REV-R0
PACKAGE NAME: ASH HANDLING SYSTEM CONTROL WRITE-UP PROJECT NAME: Khaperkheda thermal Power Station extn:- 500
MW
PROTECTION INTERLOCK
CHAPTER IV
Interlocks Controlled
S.No. Equipment Ref. Drg. Annunciation Indications/ Mimic Controls Provided
Starting Permissive Running Permissive From
1 2 3 4 5 6 7 8 9
i) GEHo Pump ON Red Lamp Start / Stop P.B. Switch
i.) VFD Ready to Run i.) VFD Ready to Run i) VFD Trip (OS) (OS) (OS)
ii) GEHO Pump OFF Green
ii). Silo Fluidizing Blower ON ii). LPBS not pressed ii) GEHO Pump Failed (OS) Lamp (OS)
iii) Mixure Tank Level Danger Low iii) GEHO Pump Trip Amber
iii) Agitator ON iii) Agitator ON (OS) Lamp (OS)
iv) Mixure Tank Level above iv) Mixure Tank Level Low
iv) Mixure Tank Level normal Low iv) Density Low (OS) Red Lamp (OS)
HCSD Pump iv) Mixure Tank Level High
52 Dwg. No.: 550-01-
[ 3 nos.] v) IAC Pressure Normal v) IAC Pressure Normal iv) Density High (OS) Red Lamp (OS)
01
vi) GEHO PLC Ready vi) GEHO PLC ON v) Density Low Red Lamp (OS)
iv) Mixure Tank Level Danger
vii).Dust Conditioner Healthy vii) No Electric Trip Low Red Lamp (OS)
viii) Silo Level not Low viii) Silo Level not Low v) Density High Red Lamp
ix). Rotary Feeder Healthy ix) Manual suction Valve Open
x) Mixing Tank Density more x) Mixing Tank Density more
than preset value than preset value
xi) Remote Selection
xii) Manual suction Valve Open OS
Start / Stop P.B. Switch
i) Start Command Initiated i) Stop Command not Initiated i) Mixure Tank Level Low (OS) Start Red Lamp (OS) (OS)
Agitator ii) MCC Not disturbance ii) MCC Not disturbance ii) Agitator Failed (OS) Stop Green Lamp
53 (HCSD) Dwg. No.: 550-01-iii) Remote Selection iii) LPBS not pressed iii) Trip Amber Lamp (OS)
[ 3 nos.] 01 iv) Tank Level normal iv) Tank Level not Low Tank Level Low Red lamp (OS)
v) Tank Level High Red Lamp
iii) LPBS not pressed v) No Electric Trip (OS) OS
i) HCSD water sump level above i) MCC module not disturbance i) MCC module "Disturbance" (OS)
i) Red LAMP for pump "Start" i) Start & Stop Push
low
(OS) button (OS)
ii) MCC module not disturbance ii) Stop push button not pressed. ii) Discharge Water Pressure "Low" for ii) Green LAMP for pump
common header (OS) "Stop" (OS)
iii) Start command initiated iii) Ash Water Sump level iii) HCSD LP water pump "Failed" iii) Amber LAMP for pump
above danger level (Gr.ANN) "Trip" (OS)
HCSD LP iv) MCC module available iv) HCSD water sump level "High" iv) Red LAMP for pump
54 Pump [ Dwg. No.: 550-01- (OS) discharge Water Pressure OS
2 nos.] 01 iv) LPBS not pressed "Normal" (OS)
v) No electrical trip v) HCSD water sump level "Low" (OS) v) Red LAMP for Ash water
v) Remote Selection sump level "Danger Low" (OS)
vi) HCSD water sump level "Danger vi) Red LAMP for Ash water
Low" (OS/ANN) sump level "High" (OS)
vii) Individual pump failed (OS) vii) Red LAMP for Ash water
iv) LPBS not pressed sump level "Low" (OS)
68
PPD. BY: P.G. CONTROL WRITE UP
PROJECT: KHAPERKHEDA T.P.S. TATL DOC. NO.: 543-E-02
REV-R0
PACKAGE NAME: ASH HANDLING SYSTEM CONTROL WRITE-UP PROJECT NAME: Khaperkheda thermal Power Station extn:- 500
MW
PROTECTION INTERLOCK
CHAPTER IV
Interlocks Controlled
S.No. Equipment Ref. Drg. Annunciation Indications/ Mimic Controls Provided
Starting Permissive Running Permissive From
1 2 3 4 5 6 7 8 9
69
PPD. BY: P.G. CONTROL WRITE UP
PROJECT: KHAPERKHEDA T.P.S. TATL DOC. NO.: 543-E-02
REV-R0
PACKAGE NAME: ASH HANDLING SYSTEM CONTROL WRITE-UP PROJECT NAME: Khaperkheda thermal Power Station extn:- 500
MW
PROTECTION INTERLOCK
CHAPTER IV
Interlocks Controlled
S.No. Equipment Ref. Drg. Annunciation Indications/ Mimic Controls Provided
Starting Permissive Running Permissive From
1 2 3 4 5 6 7 8 9
i) MCC module not disturbance i) Seal water pressure above low i) Seal water pressure "Low" (OS) i) Red LAMP for pump i) Start & Stop
ii) Remote Selection ii) MCC module not disturbance ii) MCC module "Disturbance" (OS) "Start" (OS) push button (OS)
iii) Start command initiated iii ) LPBS not pressed iii) Drain sump water level ii) Green LAMP for pump
iv) Drain sump water level above iv) Stop push button not
HCSD Drian
low pressed. "Danger Low" (OS) "Stop" (OS)
55 Pump [ 2 Dwg. No.: 550-01- OS
iii ) LPBS not pressed v) Drain sump water level vi) Drain sump pump iii) Amber LAMP for pump
nos.] 01
above danger low "Failed" (Gr. ANN) "Trip" (OS)
vi) No electrical trip iv) Red LAMP for drain sump
level "Danger Low" (OS)
Red lamp for seal water
pressure
normal (OS)
i) Start
S commandd initiated.
i ii d i) MCC module
d l not disturbance
di b i) MCC module
d l "Disturbance"
"Di b " (OS) i) Red
R d LAMP ffor bl
blower "S
"Start"" i) Start
S & Stop
S P
Pushh
(OS) Buttons (OS)
HCSD
ii) MCC module not disturbance ii) Green LAMP for blower
Blower [
56 Dwg. No.: 543-01- ii ) LPBS not pressed "Stop" (OS) OS
2 nos. per
04 iii) Stop push button not iii) Amber LAMP for blower
unit]
iii) Remote Selection pressed. "Trip" (OS)
ii ) LPBS not pressed iv) No electrical trip
i) Corresponding air blower is i) Till start permissive are i) Fluidizing blower air heater i) Red Lamp for heater ''ON' i)Start & Stop Push
running available If temp. in header temperature "Low-" (OS) (OS) Buttons (OS)
ii) Heater temp. is below presetcrosses the preset value heater ii) Green lamp for heater 'OFF'
value will be 'OFF' and restarts after (OS)
HCSD iii) Start command initiated. droppingdown temp. below iii) Red lamp for temperature
Blower preset value. normal (OS)
57 Dwg. No.: 543-01- OS
Heater [ 2 iv) MCC module not disturbance ii) MCC module not disturbance iv) Red Lamp for outlet
04
nos. per unit] pressure normal(OS)
v) Outlet air pressure is above iii) MCC module available
preset value
vi) Remote Selection iv ) LPBS not pressed
iv ) LPBS not pressed v) No electrical trip
70
PPD. BY: P.G. CONTROL WRITE UP
PROJECT: KHAPERKHEDA T.P.S. TATL DOC. NO.: 543-E-02
REV-R0
PACKAGE NAME: ASH HANDLING SYSTEM CONTROL WRITE-UP PROJECT NAME: Khaperkheda thermal Power Station extn:- 500
MW
PROTECTION INTERLOCK
CHAPTER IV
Interlocks Controlled
S.No. Equipment Ref. Drg. Annunciation Indications/ Mimic Controls Provided
Starting Permissive Running Permissive From
1 2 3 4 5 6 7 8 9
i) Red Lamp for valve open
Coarse Ash
i) Water Line Pressure not low (OS)
Hopper Ash
ii) Water line valve Open
58 Intake Valve Dwg. No.: 543-01- OS
Water line valve of other hoppers
[12 nos. per 01
will not open if any two water
unit]
line valve is open.
Ash Water Sump Makeup Valve failed
i)Through selector switch. i)Through selector switch. (OS) i) Red lamp for valve i) Open- Close
Ash Water when sump level reaches low when sump level reaches low OS
59 Sump Dwg. No.: 543-01-level level "Open" (OS) selector switch (OS)
Makeup 05 or or ii) Green lamp for valve
Valve [ 2 through selector switch in open through selector switch in open ii) Auto Manual
Nos.] position position "Close" (OS) selector switch (OS)
i)) Red Lampp for valve open
p
C
Coarse Ash
Ah
i) Water Line Pressure not low (OS)
Jet Pump Ash
ii) Water line valve Open
60 Intake Valve Dwg. No.: 543-01- OS
Water line valve of other hoppers
[Total 3 Nos. 01
will not open if any two water
per unit]
line valve is open.
71
PPD. BY: P.G. CONTROL WRITE UP