An indigenous woman in Monte Olivo, Guatemala, whose community has suffered repression linked to an
1
IFC-backed project. Photo: Santiago Botn, TeleSUR Guatemala
Financial sector lending has come to dominate the WBGs portfolio. It comprises
62 percent of the IFCs total spending, which in turn represents half of WBG
activity.5 It is also increasingly a favoured model of lending for many of the
biggest and most influential lending institutions in the world: from the Brazilian
development bank BNDES and the European Investment Bank, to the Green
Climate Fund and the new Global Infrastructure Facility.6
The IFCs rationale for investing in the financial sector is that it spurs economic
growth and allows it to expand its reach and development impact.7 It argues
that IFC invests in FIs [financial intermediaries] as a means to achieve the twin
goals of ending extreme poverty and boosting shared prosperity.8 In developing
economies there is indeed a gap to be filled: access to financial services and
private finance plays a critical role in economic and social development, and is While public institutions
claim that this approach
often sorely lacking.9 However, the IFCs flawed system of measuring
allows for more efficient
development impacts of financial intermediary (FI) lending means that it has little allocation of capital,
proof of positive development outcomes. According to a highly critical report by increased leverage of
the WBGs Independent Evaluation Group, this system is based on proxy private funds, or better
figures from the financial institutions portfolio, such as number of loans given to targeting of small and
a targeted business segment and the quality of that portfolio. IFC has limited medium enterprises,
knowledge about the underlying results on its end-beneficiaries, and any claims they have little proof
would be difficult to attribute to the IFC intervention.10 that investments create
positive development
But such criticisms are not new. In numerous reports,12 letters exchanged outcomes, let alone do
between civil society organizations (CSOs) and the Bank,13 and in audits and no harm to communities
or the environment.
monitoring reports,14 proponents and critics of this financing model have traded
11
technical arguments and statistics. What has been neglected is the human Bretton Woods Project
storythe tangible impacts on some of the poorest and most vulnerable people
in developing countries. The crux of the issue is whether, by channelling funds
through third parties, the IFC loses control over how the money is eventually
spent. Under the model currently followed, the IFC requires its client to adhere to
its social and environmental safeguard policies.15 However, the IFC does not
ensure those same standards are met in the majority of the projects the client
then funds. If, as the Banks own watchdog claims,16 the IFC often does not
know where its money ends up, and cannot therefore guarantee that it does no
harm (or indeed has a positive development impact), what does this mean for
the people on the ground affected by the projects that this distant money
finances? This is the critical question, and one that the WBG, its Board and
shareholders, as well as other lending institutions need to examine and address
before ploughing headlong into further expansion of FI lending.
2
The IFC has already enacted reforms to its FI lending in response to criticisms
over the last couple of years. The Vice-President of the IFC Jin-Yong Cai has
stated We will measure our success by the development impact of our
projectsnot by the dollar volume of our investments. Toward that end, we are
changing our institutional culture.17
But do such intended reforms go far enough? This report aims to examine some
basic but critical questions: first and foremost, what are the human costs of FI
lending when environmental and social safeguards fail? Why do those
safeguards fail? How far have reforms addressed these problems? What more
needs to be done to ensure communities do not suffer, and if they do, how can
they hold funders to account?
3
PEOPLES STORIES FROM CAMBODIA AND
LAOS, HONDURAS, INDIA AND GUATEMALA
Cambodia and Laos: IFC investment in Dragon
Capital Group Ltd
Kanat Thom community confront the companys bulldozer to protect their spirit forest. Photo: Equitable
Cambodia
Project summary
Since 2002, the IFC has invested a total of $26.95m in Vietnam-based
investment group Dragon Capital Group Ltd (DCGL) and one of its managed
funds, Vietnamese Enterprise Investments Ltd (VEIL).18 According to the IFC,
the objectives of its investment are to support the Vietnamese governments
market reform initiatives and promote the development of the Vietnamese
securities market. One of the ways the IFC envisaged achieving these objectives
was by furthering good corporate governance in DCGL, making it an example to
be emulated by Vietnamese companies.19 The investments were categorized by
the IFC as high/medium risk (FI Type 1/Type 2). According to publicly available
documentation, the required social and environmental management system
included ensuring compliance with host country requirements, including for
subprojects financed with IFC funds through the credit line. DCGL was also
required to ensure compliance with IFC environmental and social safeguards
policies.20
4
efforts were made to compel its client to improve its environmental and social
management system (ESMS) and ensure that its subproject was in compliance
with Cambodian laws, these efforts were not effective.21
Project impacts
We work very hard now we do not have enough food to eat since the
concession when there is insufficient food, we keep food for our kids
and husband.
Female villager, Kak village, Ratanakiri
On a sliver of land surrounded by a HAGL plantation, Mam Sen of Inn village refuses to leave the land which
has been in her family since her great grandparents. Photo: Equitable Cambodia
Neither HAGL, nor authorities in either country, sought the free, prior and
informed consent of indigenous communities despite the serious and direct
effects on their lands, territories and natural resources. Threats and intimidation
have precluded the possibility of free expression of opposition to the project.
5
According to a recent survey of 13 affected villages, at least 164 households lost
residential plots and individually held farmland, while entire communities
suffered losses of communal lands, and forests.25 Sites sacred to the local
communities, including spirit forests and burial grounds, were also desecrated or
destroyed.
Our people used to have a large forest for finding vines, getting resin,
cutting trees for building homes. But now, since the company came,
there is nothing. It is finished.
Male villager, Inn village, Ratanakiri
We want the World
The confiscation of land and destruction of forests has resulted in a sharp Bank to know that its
deterioration in living standards of the communities affected, with 91 percent money is being used to
reporting a drop in household income.26 The loss of land, forests and the destroy our way of life.
Nowadays, we are
pollution of streams by chemicals used in HAGLs plantations have drastically
surrounded by
reduced the ability of local residents to farm, hunt, fish and tap their resin. This companies. They have
has also led to food insecurity in some villages.27 Women face challenges in taken our community
fulfilling their daily tasks such as collecting non-timber forest products, including lands and forests. Soon
firewood and vegetables, tending cattle and working on their farms. we fear there will be no
more land left for us at
Affected communities have been unable to access effective remedies for these all and we will lose our
human rights violations. In some cases the company provided low amounts of identity. Does the World
compensation for loss of farming land; however households interviewed by Bank think this is
Equitable Cambodia and Inclusive Development International regard the development?
payments as inadequate and inappropriate, and they want their land to be Representative of one of the
communities that submitted the
returned. No compensation whatsoever has been provided for lost forests, CAO complaint
communal land and polluted streams.28
6
Honduras: IFC investment in Banco Ficohsa
A team from the Committee of Relatives of the Disappeared in Honduras (COFADEH) visits Marta Julia
Lpez, widow of Ciriaco de Jess Muoz. Photo: defensoresenlinea.com
Project summary
In 2011 the IFC invested $70m in Banco Ficohsa (Ficohsa), a Honduran bank
that funds small and medium-sized enterprises.33 Corporacin Dinant (Dinant) is
an integrated agribusiness company in Honduras which received a $15m direct
loan from the IFC in 2009.34 In response to allegations of violence against
farmers on and around Dinant oil palm plantations in Honduras Agun Valley,35
the CAO initiated a compliance audit of the Dinant investment in August 2012,
finding significant failures in the IFCs assessment of risk and implementation of
its environmental and social policies. During this audit in 2013, the CAO became
aware that Dinant was one of Ficohsas largest borrowers and as a result the
IFC had a significant exposure to Dinant through its investment in Ficohsa.36
Therefore in August 2013, the CAO initiated a second investigation into the
Ficohsa loan.37
The CAO report on the Ficohsa loan criticized the IFC for supporting Ficohsa
without proper vetting, as its earlier findings against Dinant meant the IFC was
now re-exposed to a company accused of fomenting land conflict and violence.38
The approval of the Ficohsa loan went ahead even after the IFC knew about the
problems with the Dinant loan. Not only was Dinant Ficohsas third largest client
at the time of the loan, but the CAO also noted that in 2012 Ficohsa reported 64
Category A clients those at high risk of causing negative environmental or
social impacts. Of these only 48 percent were in compliance with its
environmental and social policies. The CAO found that despite this, the IFC did
not identify measures its client should take to mitigate these risks: a large-scale
failure of due diligence.39 The IFCs lack of transparency on the identity of
Ficohsas high-risk clients makes it impossible to verify the full impact of these
failures.
7
Project impacts
Poor people need the land to cultivate I am no longer like I was
before when he [Teodoro Acosta] was here. Everything has changed and
no one is protecting me, only God.
Mara Concepcin Membreo, widow of Teodoro Acosta
In the 1990s and 2000s, the Honduran government passed a series of laws
assigning state-owned land that was formerly part of a military training centre to
landless farmers in the Agun Valley. While much of this land was transferred
without incident, controversy erupted over El Tumbador farm, a property that the
National Agrarian Institute (INA) considered state-owned, but that businessman
Miguel Facuss, owner of Dinant and Ficohsas third largest client, claimed as
his own.40 Due to the Honduran governments apparent inability to resolve the
dispute, members of the Agun Farmers Movement (MCA) occupied part of the
El Tumbador farm.41 They farmed for four months before being evicted by
Honduran armed forces and Dinants security guards on 14 August 2010.
On 15 November 2010, the farmers set out with the aim of retaking the land as a
last resort measure to pressure the government to take action to resolve the
dispute.42 According to witness statements, when the group of approximately
160 farmers approached El Tumbador they were fired on by members of the
Honduran militarys 15th Battalion and Dinant-hired security guards.43 Four
campesinos were wounded, and the group fled to a neighbouring farm. As one
witness recounted, Some of us had machetes and food, thats all. There was a
hail of bullets. I ran and got shot in the mouth, he told researchers, showing a
scar on his face from a gunshot wound.44
As news of the shooting spread, farmers began to receive telephone calls from
neighbours reporting that truckloads of security forces were approaching the
farm.45 Without warning, the crowd was fired upon from two sides with high-
calibre weapons. Farmers fled for cover in the brush in an attempt to escape.
For over four hours security forces combed the area for survivors. Some
witnesses report having been found by security forces who pointed guns at them
and told them to run. Others were not so lucky: Teodoro Acosta, Raul Castillo,
Ignacio Reyes Garca, Ciriaco de Jess Muoz and Jos Luis Sauceda
Pastrana were all killed during the attack.46 Autopsies show that Sauceda and
Castillo were shot from behind; that Acostas body had seven bullet wounds; and
that Reyes and Acosta were shot at close range. According to a witness from
the Guadalupe Carney community I was coming back home when they caught
up with him [Ignacio Reyes Garca], they got down from the military truck and
beat him savagely, then they shot him through the left side of his head.47 In
addition to the five deaths, there were reports of four women being raped during
the chaos.48
8
Mara Concepcin Membreo, widow of activist Teodoro Acosto, providing statements to the journalist
Marvin Palacios. Photo: defensoresenlinea.com
The farmers organizations vehemently deny the allegations, affirming that they
were unarmed and that weapons were posthumously placed on the farmers
bodies. The widow of one farmer who was killed, who to date does not know if
anyone is investigating her husbands death, expressed anger at photographs
which appeared in the Facuss-owned La Tribuna daily newspaper in which her
deceased husband appears with an AK-47 resting across his chest. Pointing to
her thatched house she said, How are we ever going to have one of those
weapons? Dont you see how we live? Sometimes we dont even have enough
to eat. She also stated that a local journalist told her that he was the first to take
photographs of the bodies, and that they had no such weapons on them at that
time.50
This tragedy has been compounded by failure to bring the killers to justice.
Though a judge charged five security guards with homicide in December 2012,
just one month later another judge provisionally dismissed the charges on the
grounds that the prosecution lacked evidence. The official investigation was rife
with procedural errors and has compounded the challenge of a successful
prosecution as prosecutors declined to appeal the judges dismissal.51 Dinant
9
owner Miguel Facuss refused to respond to a summons to testify and has
never been investigated for his supervisory role over the guards implicated in the
violence. To date no one has been held accountable for the massacre; in April
2014, however, the Special Unit for the Investigation and Prosecution of Violent
Deaths in the Bajo Agun Zone informed local non-government organization
COFADEH that the unit had initiated a new investigation into the killings.
In April 2014, in response to pressure from both civil society and its own Board52
following the CAOs investigation report on the IFCs loan to Dinant, the IFC
formulated an Action Plan53 and hired the Washington DC-based Consensus
Building Institute to determine whether mediation to resolve the conflicts
between the government, Dinant and affected communities is possible. The IFC
also contracted the law firm Foley Hoag to advise it on security forces and
human rights issues related to Dinants Security Action Plan, and to facilitate an
inquiry by a credible third party into past allegations related to Dinant security
forces actions in the Agun Valley. Dinant has committed itself to implementing
the Voluntary Principles on Security and Human Rights. For its part, the
Honduran government has created a special unit to investigate 147 killings that
have taken place in the framework of the Agun Valley conflict to determine the
real causes, identify those responsible and secure their capture and
prosecution.54 Oxfam hopes that these positive efforts will be maintained and
further strengthened to ensure that justice prevails in the resolution of the killings
and the land conflict.
Nevertheless, while these positive efforts may bring some improvements in the
situation, none of these actions will be able to compensate for the suffering of
the El Tumbador victims families, who face an uncertain future. The widows of
the deceased talk of the difficulty in feeding their children after losing their
partners support. Mara Concepcin Membreo, widow of Teodoro Acosta, is
now raising five children on a small plot of land in Guadalupe Carney
community. 55 For Martha Julia Lpez Oliva, widow of Ciriaco de Jess Muoz
and mother of four, the murder of my husband has changed my life, these are
very difficult days, facing fear and economic uncertainty, surviving is
complicated... it is not the same without him.56 The other widows endure similar
ordeals. Four years after the tragic events that destroyed the lives of these
farming families, their legal case is paralyzed and they have little hope of justice,
unless there is sufficient political will to ensure the effective and impartial
investigation of killings in the Bajo Agun.
10
Guatemala: IFC investment in Inter-American
Infrastructure Finance Corporation (CIFI)
Women and men of Barillas maintain a passive resistance and reject the construction of a hydroelectric dam.
Photo: Giovany Ujpan Mendoza, Oxfam
Project summary
In 2008, the IFC provided $20m in loans and $10m in equity to the Corporacin
Interamericana para el Financiamiento de Infraestructura (CIFI), a financial
institution that funds small and mid-sized infrastructure projects in Latin America.
CIFI, in turn, provided Hidro Santa Cruz (HSC) with a $8.2m loan and up to
$2.5m for a mezzanine facility.57
In 2009, HSC, a subsidiary of Spanish company Hidralia, began buying land in
Santa Cruz Barillas, a relatively calm and isolated region of Huehuetenango,
Guatemala. The company acquired 10 hectares of land through intermediaries,
explaining to sellers that the property would be used for coffee and cardamom
cultivation.58 In reality, the company was preparing to construct a hydroelectric
dam, called Cambalam. HSCs failure to consult openly with neighbouring
communities engendered distrust among local people, a predominantly
indigenous Mayan population that adheres to ancestral values and relies upon
subsistence farming. The communities began to voice opposition as armed
guards and security installations entered the region; tension escalated further
still as HSC started to construct access roads and install construction equipment
around a waterfall of spiritual significance to local people. The companys failure
to engage with the community and the resultant distrust has sparked a series of
kidnappings, arrests and violence that has left Barillas shrouded in fear.
11
are limited, and committed to conform to the IFCs Performance Standards on
indigenous peoples, environmental and social impacts, and land acquisition.60
The Qanbalm River, site of the proposed Cambalam dam, owes its name to the local Mayan language
Qanjobal, which means Yellow Jaguar. Photo: Giovany Ujpan Mendoza, Oxfam
Project impacts
We are not against hydroelectric power what we are against is the
treacherous way these men act, accusing people and transforming them
into criminals.
Interview with a community leader with an arrest warrant, 7 September 2012
Distrust boiled over into violence in 2009, when clashes led to local residents I never imagined that
detaining company security guards and asking them to sign a commitment to there would be deaths,
evacuate the region. From that moment on, the company began to use legal kidnappings, and all of
means against those who opposed the project. The company worked in tandem the chaos they
brought us. Until that
with the government to silence opposition, with state courts issuing dozens of
day we woke up,
arrest warrants against community leaders who, by virtue of their poverty, were because we had been
unable to defend themselves. The Barillas conflict has devolved into a cycle of fast asleep, I think.
community protests, violent crackdowns from state and company authorities, an Barillas resident Catarina
accompanying crackdown and arrest of local activists and ever-increasing
community dissent.
Extraordinarily, the dispute between HSC and local residents became so intense
that in 2012, the Guatemalan government declared a state of emergency in
Barillas for the first time since the end of Guatemalas civil war. A variety of civil
and political rights were suspended in the area. Local people reported house
raids, warrantless arrests, sexual violence, theft, intimidation, destruction of
property and other forms of abuse of authority.61 At least one local protestor,
Andrs Pedro Miguel,62 was killed and several others injured.63 As Barillas
resident Catarina reflects, I never imagined that there would be deaths,
kidnappings, and all of the chaos they brought us. Until that day we woke up,
because we had been fast asleep, I think.64
12
In a resistance camp, community members are informed about their rights and agree how to proceed with
their case. They ask that organizations and citizens of Guatemala and the world continue to show solidarity
with them. Photo: Giovany Ujpan Mendoza, Oxfam
The impacts of the project on local communities are most clearly seen in the
targeted arrest of local activists. Community leaders Maynor Lopez, Rubn
Herrera, Sal Mndez, and Rogelio Velsquez have all been jailed for their
outspoken opposition to the project.65 As of January 2015, Sal Mndez and
Rogelio Velsquez had spent one-and-a-half years in jail, having been
sentenced to 33 years in prison for two counts of murder, following a judicial
process fraught with inconsistencies. Nine activists from Barillas, who had been
arrested by private citizens without warrants back in 2012, remain imprisoned as
of publication of this paper. This has wrought devastating impacts on their
families, who have borne the economic costs. As Barillas resident Maria Cristina
explains, 11 women suffer daily, because they have to look after themselves,
their children, with a heavy load on their backs, [thinking] how to save their
imprisoned husbands. In September 2013 the Guatemalan Court for High Risk
Crimes acquitted two HSC employees of involvement in Pedro Miguels 2012
killing.66
Four years after the Cambalam project broke ground, operations have been
abandoned. Questions remain around why a relatively small project has
generated such a disproportionately large conflict, and why HSC has devoted so
many resources to a confrontation with local communities even though it
continues to fail to realize any economic benefits. Caterina sums up life in
Barillas after HSCs arrival: One lives in misery, for what we want is freedom at
once, because now all the families live in fear.67
Everyone would like to speak up and say no, we dont want it [the
project]. But they say if we speak up we will become criminals like them,
so its better that we stay quiet. When we return, we are going to
continue to lead our communities because our resources are at stake.
Fugitive community leader in Santa Cruz Barillas, interview 7 September 2012
13
India: IFC investment in India Infrastructure Fund
Project summary
In 2008, the IFC made a $100m equity investment in the India Infrastructure
Fund (IIF).68 The IFCs rationale for this investment was to address a key
constraint for developers of private or public-private partnership infrastructure
projects in India the availability of equity capital. [...] central to economic
growth, improved living standards, and broader development.69 The IFC also
claimed that the expected development outcome would include IFCs work with
the IIF to develop its Social & Environmental Management System, through
which the Fund will oversee the social and environmental risks of all Fund
investments, thus ensuring improved performance of all projects in which the
Fund invests.70 The IFC noted that given the types of infrastructure projects in
which the infrastructure fund would invest (including ports, roads, hydropower
and railways), the environmental and social impacts were likely to be
significant.71
14
Project impacts
Out of the total number of people affected, 25 percent are tribals
(indigenous people) and 35 percent are marginalized people (Dalits). The
Constitutional rights they enjoy are flouted and are made further
vulnerable. We hold World Bank responsible for our misery. Today, we
are left landless and without any livelihood.
Interview with Dukhbandhu Bhoi, from Achalkut village.
The GKEL project has been marked by serious environmental and social
concerns, including a flawed land acquisition process and the intimidation of
affected communities. The project required almost 1,200 acres of multi-crop
irrigated land to be diverted for industrial use, contrary to Odisha state law.75
Almost 1,300 families lost their agricultural lands and another 100 have been
economically displaced by the project. The acquisition of 78 acres of forest,
without recognizing the rights of the community, is in violation of the 2006
Recognition of Forest Rights Act.76 Families report being coerced and
threatened into parting with land at very low prices, over $1,600 lower than
mean values for the area for the three years prior to the beginning of the
project.77 Communities also maintain that land has been forcibly acquired from
indigenous and low-caste familieswhich include Scheduled Caste and Dalit
peoples who are constitutionally protected.78 The GKEL project has increased
landlessness in the area by approximately 23 percent, according to recent
research.79
Women affected by the GKEL project attending a meeting. Photo: Ranjan Panda
The complaint to the CAO80 claims that no adequate public hearing was held,
which is mandatory in any land acquisition process81 and that project
informationincluding Environmental Impact Assessmentswas not made
available to the affected communities. Echoing long-standing concerns from civil
society worldwide, the complaint argues that information about the IFCs
involvement in the project was extremely difficult to obtain, making it impossible
for affected communities to voice concerns about GKEL in advance of project
approval.82
15
Affected communities who have demanded a rehabilitation package have
suffered intimidation. In June 2010, thousands of villagers tried to attend a
meeting about rehabilitation but were refused entry, and angry clashes resulted.
Subsequently, police raided the villages, beat up men and women, registered a
case against 500 villagers and arrested 48 people, including four women.83
Villagers fled and hid in the forests for many days. Since then, people have been
living in fear.
The GKEL project has exacerbated the poor living conditions of communities
who already lived in a highly polluted areafound to be the second most
polluted area of 88 industrial clusters by Indias Central Pollution Control Board
in 2012.84 The Brahmani river on which members of affected communities
depend for their daily water usage has been declared unfit for drinking and
bathing by the Odisha State Pollution Control Board.85 Although water for the
project was supposed to be sourced from the river, affected communities claim
that GKEL has depleted the underground aquifer by drilling wells inside the
project area and in neighbouring private land.86 Also, the construction of a wall
around the factory has destroyed the local irrigation system, and the subcanals
which irrigated the land have now run dry.87
Contrary to the promises made by the company, very few jobs were created for
members of the community. Recent research found that only about 11 percent of
the project-affected people have gained work with GKEL, and those workers
were only offered subcontracts with no job security.88
The company maintains that they obtained all the required clearances from the
Government of India and Government of Odisha before setting up the project.
Company representatives note the companys commitment to good relations
with its host communities, for example through the GMR Varalakshmi
Foundation activities aimed at supporting local livelihoods.89 The CAO
investigation of this case has been completed and is expected to be published
later this year.
16
THE SUFFERING OF OTHERS: THE CASE
FOR REFORM
Acknowledging mistakes and making progress
In the face of substantial criticisms of its model of lending through financial
intermediariesfrom its own watchdog, Board and from CSOs and affected
communitiesthe IFC has taken steps to address concerns. Although its first
reaction to the highly critical CAO audit of its FI portfolio in 201290 was deeply
inadequateessentially one of denial and rejection of well-substantiated
evidence91after intervention from the World Banks Board through the
Committee on Development Effectiveness (CODE), the IFC responded and
proposed reforms.
The result, in September 2013, was an IFC Action Plan,92 which has since been
revised and updated93 as further criticisms have come to light. Important steps
by the IFC to improve environmental and social risk management include:
Such steps are welcome and in part a result of new blood at the IFC, marking
an acceptance of past faults and a new commitment to put things right. In
October 2014, the CAO published an update94 to its audit, assessing IFCs
reforms and acknowledging progress in several areas. The update is critical of
fundamental problems with the IFCs FI model, but does welcome the IFCs
acknowledgement of the importance of engaging with E&S [environmental and
social] risk at the subclient level; and finds that actions identified by the IFC
have the potential to improve the quality of E&S outcomes from IFC financial
intermediary investments over time.95
The vital questions remain however: will the reforms suffice to protect
communities from social and environmental harm? And are the cases detailed
here really just isolated bad apples or are they in fact just the tip of the iceberg,
resulting from deeper structural flaws?
17
However, it is extremely difficult to verify the IFCs figures relating to what
proportion of its FI portfolio it classifies as high risk. This is largely because there
is no transparency about the majority of projects supported by the IFCs FI
clients, so there can be no independent verification of its claim. Until there is full
disclosuresomething CSOs and communities have been pressing forwe
must simply take the IFC at their word. However, given the magnitude of IFC
investments in the financial sector and the failure of the IFC to track and monitor
its investments, it is probable that the scale of problem projects is in fact much
greater than claimed.
The IFC failed to classify the Santa Rita project as high risk despite severe conflict and repression of local
indigenous communities. Photo: Asociacin de Jvenes para el Desarrollo y Rescate Social (AJODER)
Risk miscategorization
18
2012 Performance Standardsand a range of environmental and social issues
related to IFC due diligence: project information disclosure and consultation,
impacts to local water sources, displacement, indigenous people and security
concerns.99
A year into the IFCs investment, communities filed complaints with the CAO in
which they claimed that the evictions had negatively impacted them by
displacing them from land, destroying their private property and forcing them to
forgo health, education and livelihood opportunities.107 The complaints also
voiced broader concerns about the due diligence surrounding the project,
including the lack of genuine or meaningful consultation around the evictions,
the lack of a baseline study or survey to accompany the process, and the lack of
due diligence on the part of the IFC and the company. The complaints made
specific reference to violations of IFCs Performance Standards 1, 4 and 5.108
Complainants asked for recognition and redress for their losses as well as a
compliance review of the project.
19
The CAO successfully facilitated a mediation process between the affected
communities and the company which resulted in agreements that are currently
being implemented. The communities remain far from restoring their livelihoods
but the outcome of the mediation process provides a basis for community
members to start to rebuild their lives. The communities have prioritized the
purchase of land for resettlement and farming.109 But what about the questions
regarding the IFCs pre-investment due diligence? These were not addressed by
the mediation process (as indeed it was not the objective of the mediation to do
so), which raises the critical question of how the IFC is ensuring institutional
learning from this case to ensure past mistakes are not repeated.
Beyond the issue of identifying and managing risk, a more fundamental question
remains: are cases involving conflict and abuses just isolated incidents or bad
apples, as the IFC has assured CSOs? New research110 into IFC FI
subprojectsusing commercial databaseshas revealed many possible further
cases of conflict, environmental or social harms. The desk-based research was
carried out over three months, examining the operations of IFC FI clients, where
data were available. It does not represent a full investigation of the IFCs FI
portfolio, given limited access to information and time constraints, and individual
cases are yet to be verified on the ground. However, the research points to
several potentially disturbing cases, including a mine in Vietnam which displaced
thousands of local people; further dam projects in Guatemala affecting indigenous
people; a number of rubber plantations in Cambodia involving forced evictions and
military violence; and an Indonesian conglomerate accused of land-grabbing in
West Papua (see Annex 1).
Furthermore, a review of all IFC high-risk FI investments since 2012 shows that There is no public
only two, in addition to Santa Rita above, have disclosed subprojects. This information about
represents just six percent of those investments classified FI-1or high risk. In where 94 percent
other words, there is no public information about where 94 percent of the IFCs of the IFCs recent
recent high-risk investments end up.112 Given this lack of transparency, it is a high-risk
long and laborious task to try to follow the money and verify that a particular investments end
up111
conflict or problem project ultimately involves IFC funds. Such impenetrability
has two grave results: accurately identifying the scale of problem projects or
high-risk investments funded by the IFC is impossible, and communities whose
lives are devastated by a project cannot know whether they have access to
justice or redress through the CAO. This situation is simply untenable. CSOs are
asking that at a minimum, the name and location of subprojects financed
through all financial intermediaries be disclosed.
20
However, both civil society and the CAO remain concerned that a more
fundamental problem is at play in FI lending that cannot be solved through quick
technical fixes alone. The cases highlighted here show a catalogue of suffering
by some of the poorest and most vulnerable communities in the world. Instead of
development benefits, local communities have endured displacement, loss of
livelihoods, fear, violence, criminalization and repression. Women are
particularly affected through loss of access to common resources on which their
families depend, and in some cases sexual violence. The cases also
demonstrate a systemic failure of the IFC to identify risks, and where they do
become aware of problems, to take effective action to intervene. The IFCs
failure to be able to account for the impacts of its clients subprojects renders it
blind to the disproportionate impacts of its investments on women.
Such risks will only escalate in coming years, given the IFCs plans to increase
its lending in fragile and conflict-affected states by 50 percent114 and the WBGs
strategy of investing more in transformational projects such as large
infrastructure, which will presumably involve the use of the FI financing model.115
In its recent review of IFC reforms,116 the CAO concluded that the IFC has yet to
address the fundamental problem highlighted by the CAOs original auditthat
the IFC cannot determine the full impact of its investments through financial
intermediaries and therefore cannot ensure they do no harm to the communities
they are mandated to support. The CAOs central finding is that the IFC does
not have a systematic methodology for determining whether the implementation
of an E&S management system actually achieves IFCs objectives of doing no
harm or improving E&S outcomes on the ground. The report adds that [t]his
means that IFC has no quantitative or qualitative basis on which to assert that its
financial intermediation investments achieve such outcomes, which are a crucial
part of its strategy and central to IFCs Sustainability Framework.117 This is
deeply problematic and indicates that reform has not gone far enough, as it calls
into question the very rationale for this type of investment. As this report has
shown, IFC lending through financial intermediaries has in numerous cases had
significant and long-term detrimental impact on already vulnerable communities.
At the core, the concerns of affected communities and civil society go beyond
just technical fixes, and relate to fundamental questions about the development
impact rationale for the IFC's investments in financial intermediaries. Given the
well-documented consequences, it remains incumbent on the IFC to
demonstrate that lending through financial intermediaries in each case has
positive pro-poor and sustainable developmental impact that cannot be achieved
through direct investments and that these impacts outweigh the potential risks
involved.
21
RECOMMENDATIONS
Beyond the specific technical short-term fixes that CSOs have recommended to
the IFC,118 we are calling on WBG President Jim Yong Kim and Vice-President
Jin-Yong Cai to acknowledge that more fundamental reforms of the IFCs model
of lending through financial intermediaries are needed, including the following:
Since the IFC lacks the capacity to provide adequate transparency and
oversight for the current investments it makes in the financial sector, it
should make fewer and better investments that it can ensure will do no
harm and will adhere to the Performance Standards.
The IFC should undertake a rigorous review of all IFC FI clients in its
current portfolio and make public the number of all high-risk projects, with
clear mitigation/contingency plans to address risks identified.
In rare circumstances, high-risk FI investments may have legitimate
development objectives that advance the WBGs goals, and may more
effectively meet those objectives than direct investments. In such cases,
the IFC should take the same level of responsibility for social and
environmental risk management of high-risk subprojects as it would for
direct project investments.
However, until it reforms the current inadequate systems of risk
management, the IFC should not invest in new high-risk FI projects and
clients.
The IFC should include binding measures in contracts with FI clients to
enable sanction for wrong-doing. All new IFC contracts should include
language requiring the suspension of IFC support and immediate
refunding of investment, without prejudice or fee, and the imposition of
sanctions (including financial), in the event of breach of environmental
and social requirements.
The use of third-party verification, during assessment, monitoring and
supervision, would greatly enhance the ability of the IFC to identify and
manage risk. At a minimum, annual third-party verification should be
applied for all high-risk subprojects in FI-1 and FI-2 investments.
The IFC should close the rights issue loophole which in the
HAGL/Cambodia case enabled it to provide additional investment to an
FI after the introduction of the performance standards, but not be
required to apply those stricter safeguards as the additional funding was
considered part of an ongoing agreement.
Transparency
The IFC should make the disclosure of all subclients and subprojects a
condition of receiving IFC investment. This should apply to all FI clients,
not just private equity funds. Where national laws prohibit disclosure of
certain information, as much information as is legally allowed should be
disclosed, with a note explaining why this was withheld.
22
Capacity building
Institutional reform
23
ANNEX 1
Examples of additional investments by the IFC in financial intermediaries that
initial research has indicated may present risks to communities.
Hidro Xacbal and other hydropower dams (Guatemala): the IFC is exposed
to the Hidro Xacbal dam, which was built on indigenous peoples land who claim
not to have been properly compensated.119 The IFC is also exposed to the Hidro
Norte dam through investment in the Central American Mezzanine Infrastructure
Fund.120
Masan Group (Vietnam): the IFC is exposed to one of the largest open-pit
tungsten mines in the world, which the World Bank estimated would affect 7,464
villagers.123
EDL Generation (Laos): the IFC is exposed to a subsidiary of the Lao state-run
electricity company that operates seven hydroelectric dams.125
24
NOTES
26
35 CAO (2012) Honduras/Dinant-01/CAOVice President Request, http://www.cao-
ombudsman.org/cases/case_detail.aspx?id=188
36 CAO (2014) CAO Investigation of IFC Environmental and Social Performance in
relation to investments in Banco Financiera Comercial Hondurea S.A.',
http://www.cao-ombudsman.org/documents/CAOInvestigationofIFC
RegardingFicohsa_C-I-R9-Y13-F190.pdf
37 CAO (2012) Honduras/Ficohsa-01/CAO Vice President Request, http://www.cao-
ombudsman.org/cases/case_detail.aspx?id=209
38 CAO (2014) CAO Investigation of IFC Environmental and Social Performance in
relation to investments in Banco Financiera Comercial Hondurea S.A.',
http://www.cao-ombudsman.org/documents/CAOInvestigationofIFC
RegardingFicohsa_C-I-R9-Y13-F190.pdf
39 Ibid. The CAO audit also notes that, Reviewing information available through the
media, CAO notes reports of E&S concerns in relation to a number Ficohsa clients
operating in the agribusiness, tourism, construction and hydropower sectors.
40 R. Falla (2000) Una Toma de Tierras abre Puertas a la Reforma Agraria, Revista
Envio, http://www.envio.org.ni/articulo/1032
41 CAO (2013) Auditoria de la Inversin de la IFC en la Corporacin Dinant S.A. de
C.V., Honduras, http://www.cao-ombudsman.org/cases/document-
links/documents/DinantAuditCAORefC-I-R9-Y12-F161_ESP.pdf
42 El Heraldo (2012) Acusan a Gaurdias de Cinco Muertes en Bajo Agun,
http://www.elheraldo.hn/csp/mediapool/sites/ElHeraldo/Sucesos/story.csp?cid=62070
7&sid=293&fid=219
43 RightsAction (2013) Human Rights Violations Attributed to Military Forces in the Bajo
Aguan Valley in Honduras, http://rightsaction.org/sites/default/files/Rpt
_130220_Aguan_Final.pdf
44 Human Rights Watch (2014) Aqui No Hay Investigaciones,
http://www.hrw.org/sites/default/files/reports/honduras0214spweb.pdf
45 RightsAction, op. cit.
46 Dina Meza (2010) Quinto Campesino Aparece Asesinado entre la Maleza en El
Tumbador, Defensores en Linea, http://www.defensoresenlinea.com/cms/index
.php?option=com_content&view=article&id=1061:quinto-campesino-aparece-
asesinado-entre-la-maleza-en-el-tumbador&Itemid=159
47 Plataforma de Derechos Humanos (2010) Situacin de los Derechos Humanos en el
Valle del Agun: Informe misin de organizaciones de DDHH.
48 Human Rights Watch, op. cit.
49 Corporacion Dinant (2011), E-mail to FIDH, 6 May 2011.
50 Plataforma de Derechos Humanos (2010), op. cit.
51 Human Rights Watch, op. cit.
52 CSO response to the CAO investigation into IFC investment in Corporacin Dinant,
Honduras, https://www.oxfam.org/sites/www.oxfam.org/files/cso-statement-cao-
investigation-ifc-dinant-investment-20jan2014.pdf
53 IFC (2014) Corporacin Dinant Enhanced Action Plan
FAQs, http://www.ifc.org/wps/wcm/connect/region__ext_content/regions/latin+americ
a+and+the+caribbean/strategy/corporacion_dinant_faq
54 O. Chinchilla, Fiscal General de la Repblica quoted in Proceso Digital (2014) Crean
unidad especializada para investigar crmenes en el Bajo
Agun, http://www.proceso.hn/component/k2/item/7159.html
55 M. Palacios (2014) El Caso Tumbador Suma en la Larga Lista de Impunidad en el
Agun, Defensores en Linea, http://www.defensoresenlinea.com/cms/index
.php?option=com_content&view=article&id=3187%3Ael-caso-tumbador-suma-en-la-
larga-lista-de-impunidad-en-el-aguan&Itemid=166
56 S. Rodrguez (2015) Campesinos asesinados en El Tumbador estaban alegres por
pronta cosecha, http://www.defensoresenlinea.com/cms/index.php?
option=com_content&view=article&id=3415:campesinos-asesinados-en-el-tumbador-
estaban-alegres-por-pronta-cosecha&catid=37:mem-y-imp&Itemid=150
57 CIFI (2014) Project: Canbalam, http://www.cifidc.com/wp-
content/uploads/2014/07/project_canbalam.pdf
58 A. Guerea and R. Zepeda (2012) Unwanted Development, Intermon Oxfam
Research Report, http://www.oxfamintermon.org/es/documentos/04/12/12/desarrollo-
que-no-queremos-conflicto-en-torno-al-proyecto-hidroelectrico-de-hidr
59 Guerea and Zepeda, op. cit.
27
60 CIFI, op. cit.
61 Guerea and Zepeda, op. cit.
62 S. Bastos (2013) Guatemala, Case 11/2012: Acoso y Derribo a la Justicia,
Periodismo Humano, http://periodismohumano.com/sociedad/libertad-y-
justicia/guatemala-caso-1182012-acoso-y-derribo-a-la-justicia.html
63 Guerea and Zepeda, op. cit.
64 Interview with Maria Cristina and Catarina (2014) Defenders of the Territory in Santa
Cruz, Barillas, copy on file with author.
65 Hidralia accuses Rubn Herrara of committing 12 crimes since 2009, including
kidnapping. The company also accused him of leading the 1 May 2012
demonstrations, for which he was jailed for 76 days in 2013. Between March and
April of 2012 the courts have turned out 23 warrants covering an array of charges,
including terrorism. Nine detained leaders have been incarcerated for nine months.
66 S. Bastos, op. cit.
67 Interview with Maria Cristina and Catarina, op. cit.
68 IFC India Infr. Fund: Summary of proposed project,
http://ifcext.ifc.org/ifcext/spiwebsite1.nsf/2bc34f011b50ff6e85256a550073ff1c/15378a
d7f9e4e3b7852576ba000e2a8d
69 Ibid.
70 Ibid.
71 CAO (2013) Complaint Regarding IFCs investment in the India Infrastructure Fund
IFC India Infrastructure Fund (#26237)', http://www.cao-
ombudsman.org/cases/document-links/documents/FinalCAOAssessmentReportIIF-
GMRcomplaintFebruary2013.pdf
72 CAO (2011) India / India Infrastructure Fund-01/Dhenkanal District, http://www.cao-
ombudsman.org/cases/case_detail.aspx?id=165
73 Ibid.
74 Complaint letter to the CAO (2011), http://www.cao-ombudsman.org/cases/document
-links/documents/IndiaIIFcomplaint_April152011_web.pdf
75 Complaint letter to the CAO (2011), http://www.cao-ombudsman.org/cases/document
-links/documents/IndiaIIFcomplaint_April152011_web.pdf; Letter from GKEL (2009)
GKEL/BBSR/ENERGY/09-10/139 to Additional secretary, Department of Energy.
dt.18.04.2009.
For a detailed examination of the irrigated land acquired and laws pertaining to it see:
The Research Collective (2012) Negotiating Power: Socio-economic impacts of the
GRM Kamalanga Energy Limited project affected area in Dhenkanal Odisha, p. 10.
76 The Research Collective (2012), op. cit., p. 17.
77 The mean average rate for agricultural land in Mangalpur in the three years prior to
acquisition was Rs.3,99,638 per acrealmost a Lakh (approximately US$1,600)
higher than the amount paid by GKEL to Mangalpur residents. See: The Research
Collective PSA (2014) Down the Rabbit Hole: What Bankers arent telling you - An
Analysis of Lending Practices Adopted by Banks to Finance Developmental
Projects in India, February 2014, p. 15.
78 For details of these allegations see The Research Collective (2012), op. cit., p. 12.
79 According to The Research Collective (2012), op. cit., p. 15, landlessness among
survey respondents increased from 6 percent to 29 percent after the project.
80 Complaint letter to the CAO (2011), http://www.cao-ombudsman.org/cases/document
-links/documents/IndiaIIFcomplaint_April152011_web.pdf
81 For an explanation of the flaws in the public consultation process see The Research
Collective (2012), op. cit., p. 12.
82 Complaint letter to the CAO (2011), http://www.cao-ombudsman.org/cases/document
-links/documents/IndiaIIFcomplaint_April152011_web.pdf
83 For an account of the events of June 2010 and subsequent police actions, please
see Complaint letter to the CAO (2011), http://www.cao-ombudsman.org/cases
/document-links/documents/IndiaIIFcomplaint_April152011_web.pdf, section 2.4.15
17; and The Research Collective (2012), op. cit., pp. 201.
84 The Research Collective (2012) op. cit., p. 4.
85 Ibid.
86 GKELs plans to sink bore wells in Durgapur village have also been mentioned in
district records. Minutes of a meeting between the company and the community at
the Office of the Sub-collector dated 13 April 2010.
28
87 The Research Collective (2012) Negotiating Power found that GKEL had obtained
the Environmental Clearance from MoEF on the basis of a fraudulent Environment
Assessment Report (EIA) report. This report was prepared for GKEL by SS
Environics and claimed that the project would not acquire double crop or irrigated
lands; however 455 ha of land irrigated by the Rengali Irrigation Canal was acquired.
The EIA claimed to only acquire 1,038 acres, but acquired over 1,175 acres.
88 Ibid.
89 CAO (2013) Complaint Regarding IFCs investment in the India Infrastructure Fund
IFC India Infrastructure Fund (#26237)', http://www.cao-
ombudsman.org/cases/document-links/documents/FinalCAOAssessmentReportIIF-
GMRcomplaintFebruary2013.pdf
90 CAO (2012) CAO Audit of a Sample of IFC Investments in Third-Party Financial
Intermediaries, http://www.cao-ombudsman.org/documents/Audit_Report_C-I-R9-
Y10-135.pdf
91 R. Kaldany (2013) The World Bank/IFC/M.I.G.A Office Memorandum,
http://www.cao-ombudsman.org/newsroom/documents/FINALIFC
ResponsetoCAOReport1-31-2013.pdf
92 IFC (2013) E&S Risk Management of Financial Institutions at the IFC,
http://www.cao-ombudsman.org/documents/IFCpresentationforCODE-ESRMforFIs-
final.pdf
93 IFC (2014) IFCs Environmental & Social Lessons Learned, Technical Briefing for
the Board, http://www.ifc.org/wps/wcm/connect/557c4180438e1ed48f72bf869243d45
7/IFC_EnvironmentalSocialLessonsLearned-042014.pdf?MOD=AJPERES; and IFC
(2014) IFC Environmental and Social Update,
http://www.ifc.org/wps/wcm/connect/cea2640045e78c329befbb9916182e35/Dinant_
E%2BS_Update_CSO_Meeting_Oct-10-2014.pdf?MOD=AJPERES
94 CAO (2014) Monitoring of IFCs Response to: CAO Audit of a Sample of IFC
Investments in Third-Party Financial Intermediaries, http://www.cao-
ombudsman.org/documents/CAOFIAuditMonitoringReport_October102014.pdf; also
see, M. Romero (2014) Watchdog warns World Bank private-sector lending reforms
show progress, but still fall short, http://eurodad.org/Entries/view/1546
286/2014/11/04/Watchdog-warns-World-Bank-private-sector-lending-reforms-show-
progress-but-still-fall-short
95 CAO CAO Compliance Audit of IFC's Financial Sector Investments, http://www.cao-
ombudsman.org/newsroom/archive/index.html
96 Presentation by the IFC to the World Banks Committee on Development
Effectiveness, 4 September 2013, E&S risk management of financial institutions at
the IFC, http://www.cao-ombudsman.org/documents/IFCpresentationforCODE-
ESRMforFIs-final.pdf
97 International Rivers Chixoy Dam,
http://www.internationalrivers.org/campaigns/chixoy-dam
98 See Bretton Woods Project (2014) IFC lending through financial intermediaries a
year on from the action plan, what have we learned?,
http://www.brettonwoodsproject.org/2014/10/ifc-lending-financial-intermediaries-year-
action-plan-learned/ and IFC Real LIRF: Summary of Investment Information
http://ifcext.ifc.org/ifcext/spiwebsite1.nsf/ProjectDisplay/SII31458
99 CAO (2014) Guatemala / Real LRIF-01/Coban, http://www.cao-
ombudsman.org/cases/case_detail.aspx?id=227
100 See CAO audits including Tata Mundra: CAO (2013) CAO Audit of IFC Investment in
Coastal Gujarat Power Limited, India, http://www.cao-
ombudsman.org/cases/document-links/documents/CAOAuditReportC-I-R6-Y12-
F160.pdf; Ficohsa: CAO (2013) Honduras / Ficohsa-01/ CAO Vice President
Request, http://www.cao-ombudsman.org/cases/case_detail.aspx?id=209; and
Dinant: CAO (2012) Honduras / Dinant-01/CAO Vice President
Request, http://www.cao-ombudsman.org/cases/case_detail.aspx?id=188
101 CAO (2013) CAO Audit of IFC Investment in Corporacin Dinant S.A. de C.V.,
Honduras, http://www.cao-ombudsman.org/cases/document-
links/documents/DinantAuditCAORefC-I-R9-Y12-F161_ENG.pdf
102 CAO (2014) CAO Releases Investigation of IFC Environmental and Social
Performance in relation to Investments in Banco Financiera Comercial Hondurea
S.A. (Ficohsa), http://www.cao-ombudsman.org/cases/document-
links/documents/CAOCommunique_Ficohsa_SummaryofFindings_August112014.pdf
103 Jin-Yong Cai (2014), op. cit.
104 La Plataforma Agraria de Honduras, Movimiento Madre Tierra (Honduras), SOMO
(Netherlands), Urgewald (Germany), Inclusive Development International, Bank
Information Center, Oxfam, Global Witness, Bretton Woods Project, and the Center
29
for International Environmental Law (2014) New investigation finds dont ask, dont
tell policy leads to IFC blunders in Honduras human rights scandal,
http://oxf.am/ux4.
105 IFC (2010) Agri-Vie: Summary of Proposed Investment, http://ifcext.ifc.
org/ifcext/spiwebsite1.nsf/projectdisplay/spi_dp27674
106 R. Novozhilov (2010) Back to Office Report presented to IFC, March 2010
107 See: CAO (2011) Uganda / Agri-Vie Fund-01/Kiboga, http://www.cao-
ombudsman.org/cases/case_detail.aspx?id=180 and CAO (2011) Uganda / Agri-Vie
Fund-02/Mubende, http://www.cao-ombudsman.org/cases/case_detail.aspx?id=181
108 IFC (2012), Policy on Environmental and Social Sustainability, 1 January 2012.
109 See: Oxfam (2014) Mubende community in Uganda moves forward with
implementation of agreement with New Forests
Company, http://www.oxfam.org.uk/get-involved/campaign-with-us/latest-campaign-
news/2014/04/mubende-community-moves-forward and Oxfam Second Ugandan
community reaches agreement with British company,
http://www.oxfam.org/en/campaigns/second-ugandan-community-reaches-
agreement-british-company
110 D. Roasa (forthcoming) IFC Financial Intermediary Investments Research: Phase 1.
111 Of 49 investments classified FI-1 since 2012, just three have listed subprojects: IFC
(2012) GC Credit Summary of Investment Information,
http://ifcext.ifc.org/ifcext/spiwebsite1.nsf/651aeb16abd09c1f8525797d006976ba/450
d889a34690ea885257ab4006a8c14?opendocument; IFC (2013) Lereko Metier
Sustainable Capital Fund Trust: Summary of Investment Information,
http://ifcext.ifc.org/ifcext/spiwebsite1.nsf/651aeb16abd09c1f8525797d006976ba/f516
a8eb5128c9fc85257b430065fe98?opendocument; IFC (2012) Real LRIF: Summary
of Investment Information, http://ifcext.ifc.org/ifcext/spiwebsite1.nsf/ProjectDisplay
/SII31458
112 Ibid.
113 CAO (2014) Monitoring of IFCs Response to: CAO Audit of a Sample of IFC
Investments in Third-Party Financial Intermediaries, http://www.cao-
ombudsman.org/documents/CAOFIAuditMonitoringReport_October102014.pdf
114 IFC IFC in Fragile and Conflict Affected-Situations, http://www.ifc.org/wps/wcm
/connect/aad96f804f36e47f9be0df032730e94e/AM2014_IFC_Issue_Brief_FCS+.pdf
?MOD=AJPERES
115 WBG (2013) World Bank Group Strategy, https://openknowledge.worldbank.
org/bitstream/handle/10986/16095/32824_ebook.pdf?sequence=5
116 CAO (2014) Monitoring of IFCs Response to: CAO Audit of a Sample of IFC
Investments in Third-Party Financial Intermediaries, http://www.cao-
ombudsman.org/documents/CAOFIAuditMonitoringReport_October102014.pdf
117 Eurodad (2014) Watchdog warns World Bank private-sector lending reforms show
progress, but still fall short, http://eurodad.org/Entries/view/1546286/2014/
11/04/Watchdog-warns-World-Bank-private-sector-lending-reforms-show-progress-
but-still-fall-short
118 See for example: Bretton Woods Project (2014) Response letter to the head of IFC
Jin-Yong Cai re: IFC investment in the financial sector,
http://www.brettonwoodsproject.org/2014/03/13785/; Bretton Woods Project (2013)
Letter to World Bank President Dr. Jim Yong Kim re: IFC investment in the financial
sector, http://www.brettonwoodsproject.org/2013/03/art-572178/; Bretton Woods
Project (2013) Response letter to World Bank President Dr. Jim Yong Kim re: IFC
investment in the financial sector, http://www.brettonwoodsproject.org/2013
/11/response-letter-wb-pres-ifc-fis/; Bretton Woods Project (2014) Civil society letter
re: the IFC and lessons learned, http://www.brettonwoodsproject.org/2014/06/civil-
society-letter-re-ifc-lessons-learned/
119 IFC IFC Invests in Guatemalas Banco G&T Continental, Promoting Access to
Finance for SMEs, http://ifcext.ifc.org/IFCExt/pressroom/IFCPressRoom
.nsf/0/BBECDE9D9E59DDFB85257496004C3B3D?OpenDocument; IFC IFC
Capitalization Fund Invests $100 Million in Banco G&T Continental to Support SMEs
in Central America, http://ifcext.ifc.org/ifcext/pressroom/IFCPressRoom
.nsf/0/95C767891A6E848085257AD300547039; Nisgua (2007) Ixil communities
demand greater benefits from new hydroelectric dam,
http://www.nisgua.org/themes_campaigns/index.asp?id=2982&mode=pf
120 IFC (2007) CAMIF: Summary of Proposed Investment,
http://ifcext.ifc.org/ifcext/spiwebsite1.nsf/0/688B9122C3914B8F852576BA000E2B0A;
In November 2012, the CAMIF acquired a 3% equity stake in Hidronorte SA; IFC
(2007) CIFI: Summary of Proposed Investment,
http://ifcext.ifc.org/ifcext/spiwebsite1.nsf/0/4AE7AE952CF18EEC852576BA000E2B3
5; Telesur (2014) Clashes over dam construction in Guatemala leave two dead,
30
http://www.telesurtv.net/english/news/Clashes-Over-Dam-Construction-in-
Guatemala-Leave-Two-Dead-20141118-0051.html
121 IFC (2011) VI Fund II Summary of Proposed Investment,
http://ifcext.ifc.org/ifcext/spiwebsite1.nsf/ProjectDisplay/SPI_DP30272; Gemadept
Corporation (2012) Announcement On Convertible Debt Issuance,
http://www.gemadept.com.vn/assets/uploads/myfiles/files/ThongBao_CoDong/20120
816-GMD-TBPHNCD_en.pdf; Sahrika (2012) Mondulkiri villagers face eviction
deadline, http://sahrika.com/2012/05/23/mondulkiri-villagers-face-eviction-deadline/;
Human Rights Council (2012) Report of the Special Rapporteur on the situation of
human rights in Cambodia, Surya P. Subedi,
http://www.ohchr.org/Documents/HRBodies/HRCouncil/RegularSession/Session21/A
-HRC-21-63-Add1_en.pdf; IFC (2002) Vietnam--IFC Invests in Dragon Capital,
http://ifcext.ifc.org/ifcext/pressroom/ifcpressroom.nsf/1f70cd9a07d692d685256ee100
1cdd37/2961065042a04f9e85256c5c005412de?OpenDocument; Dong Phu Rubber
JSC, http://www.4-traders.com/DONG-PHU-RUBBER-JSC-6499369/company/; Land
Matrix Vietnam Rubber Group, http://landmatrix.org/en/get-the-detail/by-investor-
name/117/?order_by=; Tay Ninh Rubber JSC (TRC), http://www.4-traders.com/TAY-
NINH-RUBBER-JSC-6500786/company/; Global Witness (2013) Rubber Barons:
How Vietnamese companies and international financiers are driving a land grabbing
crisis in Cambodia and Laos, https://www.globalwitness.org/sites/default/files/library
/RubberBaronsSummaryENGLISH.doc.pdf
122 IFC IFC Invested about $300 Million in Indonesia Last Fiscal Year to Support Private
Sector Development, http://ifcext.ifc.org/ifcext/pressroom/IFCPressRoom.nsf/0/
9D0E74CE6C1AB70085257A9200342E2F; T. Sipahutar (2014) Medco Power to
have IPO, http://www.thejakartapost.com/news/2014/05/08/medco-power-have-
ipo.html; MIFEE (2015) Kamoro people take a stand against Freeport smelter plans,
https://awasmifee.potager.org/; http://www.redd-monitor.org/wp-
content/uploads/2012/05/mifee_en.pdf
123 IFC (2010) Masan Group: Summary of Proposed Investment,
http://ifcext.ifc.org/ifcext/spiwebsite1.nsf/c9aba76ed1df1938852571c400727d66/f2d9
89ba07ba43fd852576c6005d49dd?opendocument; IFC (2003) Summary of Project
Information (SPI), http://ifcext.ifc.org/ifcext/spiwebsite1.nsf/651aeb16abd09c
1f8525797d006976ba/dfe5879675a79794852576ba000e24f9?opendocument; Nui
Phao Mining Joint Venture Company (2006) Nui Phao Mining Project, Dai Tu
District, Thai Nguyen Province: Resettlement Action Plan,
http://documents.worldbank.org/curated/en/2006/07/6981373/vietnam-nui-phao-
mining-project-resetlement-action-plan
124 IFC (2006) Nicaragua Sugar Estates Limited S.A.: Summary Of Proposed
Investment, http://ifcext.ifc.org/ifcext/spiwebsite1.nsf/DocsByUNIDForPrint/B03A85F
8D867C21E852576BA000E2900?opendocument; Land Matrix Grupo pellas,
http://www.landmatrix.org/en/get-the-detail/by-investor-
name/2514/?download_format=csv&order_by=&starts_with=G; http://www.ghrc-
usa.org/our-work/current-cases/polochic/
125 IFC (2002) Vietnam--IFC Invests in Dragon Capital,
http://ifcext.ifc.org/ifcext/pressroom/ifcpressroom.nsf/1f70cd9a07d692d685256ee100
1cdd37/2961065042a04f9e85256c5c005412de?OpenDocument; Dragon Capital
First investment by MBCDF, http://www.dragoncapital.com/dragon-capital-
funds/first-investment-by-mbcdf; IFC (2012) Leopard Bangladesh: Summary of
Investment Information, http://ifcext.ifc.org/ifcext/spiwebsite1.nsf/78e3b305216fcdba
85257a8b0075079d/c008ec29ff01ad5485257ac2006ad92d?opendocument&Highligh
t=0,Bangladesh; A. Davis (2011) Leopard Capital takes stake in Laos hydro-power
firm, http://www.avcj.com/avcj/news/1935754/leopard-capital-takes-stake-laos-hydro-
power-firm; EDL-Gen Business Development Planning of EDL-Gen,
http://www.edlgen.com.la/en/page.php?post_id=8; International Rivers Other
Destructive Pipeline and Legacy Projects, http://www.internationalrivers.org/
campaigns/other-destructive-pipeline-and-legacy-projects
31
Oxfam International April 2015
This paper was written by Kate Geary, with case studies contributed by Ricardo Zepeda,
George Redman, Natalie Bugalski, Thuon Ratha, Johanna van Strien, Luiz Fernando
Vieira, Joe Athialy, Lakshmi Premkumar, Vijayan MJ, Diana Kearney, and Radhika Sarin.
Oxfam, Inclusive Development International, Global Witness, Bretton Woods Project,
Bank Information Center, Madre Selva, Nisgua, Programme for Social Action, Equitable
Cambodia, Urgewald, Committee of Relatives of the Disappeared in Honduras
(COFADEH) and Movimiento Madre Tierra Honduras (Mother Earth Movement
Honduras) acknowledge the assistance of Arantxa Guerena, Anne Bordatto, Ellen Moore,
Dustin Roasa, Maria-Jose Romero and Rob Nash in its production. It is part of a series of
papers written to inform public debate on development and humanitarian policy issues.
This paper is dedicated to the memory of Joseph Ntamashakiro and Eriphaz
Rutaryabusha, who struggled courageously for justice for their communities.
For further information on the issues raised in this paper please e-mail
[email protected]
This publication is copyright, but the text may be used free of charge for the purposes of
advocacy, campaigning, education, and research, provided that the source is
acknowledged in full. The copyright holder requests that all such use be registered with
them for impact assessment purposes. For copying in any other circumstances, or for re-
use in other publications, or for translation or adaptation, permission must be secured
and a fee may be charged. E-mail [email protected].
OXFAM
Oxfam is an international confederation of 17 organizations networked together in more
than 90 countries, as part of a global movement for change, to build a future free from the
injustice of poverty. Please write to any of the agencies for further information, or visit
www.oxfam.org.