Pipeline Daily Construction Report

This daily construction progress report summarizes work on a header project pipeline from station 0+00 to 214+59. No construction progress was made today due to stormy weather conditions in the morning. The report details weather conditions, contractor manpower on site, and notes that abnormal weather adversely affected construction but no crews were impacted. Welding and inspection data fields were left blank as no work was performed.

Uploaded by

Katie Benson
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
86% found this document useful (7 votes)
4K views2 pages

Pipeline Daily Construction Report

This daily construction progress report summarizes work on a header project pipeline from station 0+00 to 214+59. No construction progress was made today due to stormy weather conditions in the morning. The report details weather conditions, contractor manpower on site, and notes that abnormal weather adversely affected construction but no crews were impacted. Welding and inspection data fields were left blank as no work was performed.

Uploaded by

Katie Benson
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

DAILY CONSTRUCTION PROGRESS REPORT

PIPELINE
AFE # 0 Project Name: Header Project Date:
Origin (U/S) Station No: 0 + 00 Contractor: MPG Pipeline Contractor M
Terminus (D/S) Station No: 214 + 59 Contractor PM: John-Ryan House
Total Project Length (LF): 21459 Contractor Supt.: Geoff Fontenot Total number of hour
Contractor/Crew Work
Total HDD Length (LF): 0 Contractor Welding FM Dennis Miller (Actual Hours)
Total Kicker Gas (LF): 0 Welding System: 0
WORKING CONDITIONS
Weather Conditions AM Storms Temperature: 7 A.M. 68 F 12 P.M. 77 F 5 P.M.
ROW Conditions: Muddy Wind: 7 A.M. SE @ 5 mph 12 P.M. SE @ 12 mph 5 P.M.
Did ABNORMAL conditions exist that adversely affected construction p Yes No (If YES, Exp
Any Crews affected by adverse weather, ROW or other working conditi Yes No (If YES, Exp
CONSTRUCTION PROGRESS
Contractor Mainline Pipeline Station # Feet REMARKS
Construction Operation From To Today (LF) Future Use
Base Lay
0 + 00 0 + 00 0
0 + 00 0 + 00 0
0 + 00 0 + 00 0
0 + 00 0 + 00 0
0 + 00 0 + 00 0
0 + 00 0 + 00 0
0 + 00 0 + 00 0
0 + 00 0 + 00 0
0 + 00 0 + 00 0
0 + 00 0 + 00 0
0 + 00 0 + 00 0
0 + 00 0 + 00 0
0 + 00 0 + 00 0
HDD
Pilot Hole Completion 0 + 00 0 + 00 0
Ream Pass Completion 0 + 00 0 + 00 0
Pipe Pull Back 0 + 00 0 + 00 0
Rock & Kicker Gas
Rock Ditch 0 + 00 0 + 00 0
Rock Shield 0 + 00 0 + 00 0
Kicker Gas Line Installed 0 + 00 0 + 00 0
Contractor Specialty
Construction Operation Station # Quantity Size
Pig Trap Testing 0 + 00 0
Pig Trap Repair 0 + 00 0
Pig Trap Installation 0 + 00 0
Meter Assembly Installation 0 + 00 0
Discharge Spool Installation 0 + 00 0
Above Ground Valve 0 + 00 0
WELDING DATA CONTRACTOR MANPOWER/EQUIP
Welds (ML) Today 0 X-rayed (ML) Today 0 Foreman 0 Dozers
Tie-Ins Today 0 Tie-Ins X-rayed Today 0 Straw 0 Excavators
Fab. Welds Today 0 Fab. Welds X-rayed Today 0 Welders 0 Skidsteers
Repairs Today 0 Repairs X-rayed Today 0 Welder Helpers 0 Bending Machines
Temporary Welds 0 Temporary Welds X-rayed 0 Laborers 0 Welding Rigs
Cut-Outs Today 0 TOTAL X-RAYED > 0 Operators 0 Pickup Trucks
TOTAL TODAY > 0 TOTAL REJECT WELDS > 0 Truck Drivers 0 1-Ton (>)Trucks
TOTAL WELDS TO DATE > 0 TOTAL X-RAY TO DATE > 0 X-ray Tech 0 Marooka/Compressors
COMPANY MANPOWER
Construction Management Jordan Hunter Safety Inspection 0 Environmental Inspection
Construction Inspection John Dougherty Survey Personnel Thomas Brooks ROW Personnel

Chief Inspector: Johnny Doughterty


Work Date:

Signature: _______________________________________________
Report No.:
Date: 5/20/2014
TION PROGRESS REPORT
PIPELINE
5/20/2014
Contractor Manpower

Total number of hours


Contractor/Crew Worked 0
(Actual Hours)

NG CONDITIONS
82 F
SE @ 15 mph
(If YES, Explain Below in Remarks)
(If YES, Explain Below in Remarks)
UCTION PROGRESS
REMARKS

CONTRACTOR MANPOWER/EQUIPMENT
0
0
0
0
0
0
0
0
ANY MANPOWER
0
0

5/20/2014

14

You might also like