HEAT LOAD CALCULATION Doc.No.
TEC-HLC-101
FOR REV 0
TEC-MEP OFFICE BUILDING @ HYDERABAD CITY DATE 3/16/2017
SPACE SHEET
EXPOSURE INTERNAL LOAD FRESH AIR
AREA WALL(SQFT) GLASS(SQFT)
# SPACE LIGHTING ELECT CFM
(FT) ROOF No of CFM per Total
PARTITION LOAD LOAD PER
(SQFT) People (WATTS/FT) (WATTS) ft CFM
N E S w N E S w PERSON
1 FF LIVING ROOM 195.0 88.8 24.5 66.3 297.0 2.0 1.6 2500.0 5.0 0.06 21.7
2 GF SECTION HEAD 29 272.0 147.6 210.0 10.3 10.3 272.0 46.0 2.0 1.0 500.0 5.0 0.06 27.0
2 MEETING ROOM 406.4 308.5 150.5 20.0 1.4 1000.0 5.0 0.06 124.4
3 STAFF ROOM 141.0 161.7 5.0 1.0 600.0 5.0 0.06 33.5
TEC-MEP 1 OF 3 Space sheet
HEAT LOAD CALCU
FOR
ESEC MEP FIVE STAR HOTEL @
SPACE SHEET FOR
EXPOSURE
EQUIP AREA
# WALL(SQMT)
REF (M)
N NNE NE ENE E ESE SE SSE S SSW sw wsw w WNW NW NNW N NNE
1 RF.FCU.01 27.5 19.3
SERVICE-01
2 RF.FCU.02
SERVICE-02 17.1 11.5
15.0 11.3
ROOM SREVICE
3 RF.FCU.03
STORE 4.6 38.2 14.7 9.0 8.6
4 RF.FCU.04 STAIR-01 26.7
5,6 RF.FCU.05& 06 PUMP ROOM 74.4 13.3 21.7 52.0
7 RF.FCU.07 STAIR-02 23.2
8 RF.FCU.08 SERVICE ROOM-03 48.2 15.5
9 RF.FCU.09 SERVICE-04 21.0 13.7
ESEC MEP 2 OF 3 Space sheet for Roof floor FCU (SI UNITS)
AT LOAD CALCULATION Doc. No. P-115-HLC-001
FOR Rev. 0
STAR HOTEL @ HAIL CITY Date 7/10/2010
HEET FOR ROOF-FCU
EXPOSURE INTERNAL LOAD VENTILATION
NO. OF
GLASS(SQMT) PARTITION LIGHTING ELECT L/S
PEOPLE L/S per Total
ROOF LOAD LOAD PER
m L/S
NE ENE E ESE SE SSE S SSW sw wsw w WNW NW NNW 1 2 Factor Total (WATTS) (WATTS) PERSON
48.2 18.9 2.0 12.0 150.0
17.1 2.0 150.0
0.0 15.0 14.3 37.4 - 2.0 13.0 0.0 2.5 0.3 9.5
4.6 1.0
26.7 102.0 24.0 8.0 2.5 0.3 68.0
74.4 1.0 16.2 7460.0
23.2 102.0 24.0 8.0 2.5 0.3 67.0
48.2 9.3 68.6 - 2.0 12.0 0.0 2.5 0.3 19.5
21.0 2.0 0.0 2.5 0.3 11.3
ESEC MEP 3 OF 3 Space sheet for Roof floor FCU (SI UNITS)