This document is a checklist for the handover of a factory building. It lists 38 items that need to be inspected on different floors to check their status and completion percentage. The items include construction elements like brick walls, plastering and tiles as well as mechanical, electrical and safety systems like ducting, lighting, plumbing, fire detection and more.
This document is a checklist for the handover of a factory building. It lists 38 items that need to be inspected on different floors to check their status and completion percentage. The items include construction elements like brick walls, plastering and tiles as well as mechanical, electrical and safety systems like ducting, lighting, plumbing, fire detection and more.
This document is a checklist for the handover of a factory building. It lists 38 items that need to be inspected on different floors to check their status and completion percentage. The items include construction elements like brick walls, plastering and tiles as well as mechanical, electrical and safety systems like ducting, lighting, plumbing, fire detection and more.
This document is a checklist for the handover of a factory building. It lists 38 items that need to be inspected on different floors to check their status and completion percentage. The items include construction elements like brick walls, plastering and tiles as well as mechanical, electrical and safety systems like ducting, lighting, plumbing, fire detection and more.
Download as XLSX, PDF, TXT or read online from Scribd
Download as xlsx, pdf, or txt
You are on page 1of 2
Checklist of Factory Building Handover
Project: EFL-Ex Date of Inspection:
Floor Ground Floor 1st Floor 2nd Floor 3rd Floor 4th Floor 5th Floor Status Y N % Y N % Y N % Y N % Y N % Y Sl Items 1 Brick Wall 2 Plaster 3 Pointing 4 Column Finishing 5 Beam Finishing 6 Slab Finishing 7 Fin Finishing 8 Floor Tiles 9 Grill 10 Glass Partition 11 Glass Windows 12 Glass Doors 13 Wooden Doors 14 Fire Doors 15 Duct
16 Lift wall Facing/Cladding
17 Railing 18 Paint 19 Water repellant 20 Toilet PVC Partition 21 Plumbing work 22 Sanitary work 23 Industrial Fan 24 Ceiling 25 Cable laying 26 Bus Bar Installation 27 DB installation 28 Light fitting 29 Steam Line 30 Machine Installation 31 Furniture setup 32 Lift Installation 33 Water Line 34 Safety Sign 35 Fire Extinguisher 36 Lighting Arrester 37 Fire Detection System 38 Fire Protection System 5th Floor N %