SIMOPs Matrix - Combined - Rev-1

Its a simple SIMPOS Matrix designed for mutli contractor interface environment in an operating plant.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views1 page

SIMOPs Matrix - Combined - Rev-1

Its a simple SIMPOS Matrix designed for mutli contractor interface environment in an operating plant.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

C311394- RHIP - SIMOPS MATRIX - HMPS ( ATE CONSTRUCTION )

Location Area - 5 Manifold Area Area - 4 RV platforms Area -3 EW Goal Post Area -2 Dabhan Interface Area -1 P2 Line
Activity 1) Installation of new Trains(Manifolds) near to Existing
1) RV Platform Structure , 2) Piping works on structure 1) Installation of EW Goal Post Structure Work and Piping 1) Installaltion of Combined Goalposts and Piping 1) Installaltion of Goalposts and P2 Line
Train and Piping
Heavy Lifting for Heavy Lifting for Heavy Lifting for Heavy Lifting for Heavy Lifting for
machinery/vehi installation of Hot Works and Tie-in to Pre- machinery/vehi installation of Hot Works and Tie-in to Pre- machinery/vehi installation of Hot Works and Tie-in to Pre- machinery/vehi installation of Hot Works and Pre- machinery/vehi installation of Hot Works and Tie-in to Pre-
Heavy Lifiting of X-Ray Heavy Lifiting of More than One X-Ray Heavy Lifiting of More than One X-Ray Heavy Lifiting of More than One X-Ray Heavy Lifiting of X-Ray
Excavation cle movement piping, valves, use of Hand existing commissioning/ ERP Excavation cle movement piping, valves, use of Hand existing commissioning/ ERP Excavation cle movement piping, valves, use of Hand existing commissioning/ ERP Excavation cle movement piping, valves, use of Hand commissioning/ ERP Excavation cle movement piping, valves, use of Hand existing commissioning/ ERP
Foundations Radiography Foundations contractors Radiography Foundations contractors Radiography Foundations contractors Radiography Foundations Radiography
close to live platform and power tools facilities Hydro-testing close to live platform and power tools facilities Hydro-testing close to live platform and power tools facilities Hydro-testing close to live platform and power tools Hydro-testing close to live platform and power tools facilities Hydro-testing
Line goal posts. Line goal posts. Line goal posts. Line goal posts. Line goal posts.

Area - 5 1) Installation Excavation


Manifold of new A2 A4
Area Trains(Manif Heavy Lifiting of Foundations
olds) near to A1 A1 A3 A4
Existing Train Heavy machinery/vehicle
and Piping movement close to live Line A1 A1 A4
Lifting for installation of
piping, valves, platform and
goal posts.
A1 A1 A3 A4
Hot Works and use of Hand
power tools A2 A3 A3 A4
X-Ray Radiography

Tie-in to existing facilities


A4 A4 A4 A4 A4
Pre- commissioning/ Hydro-
testing

Emergency Response

Area - 4 1) RV Excavation
RV Platform A4 A1 A2 A1 A2 A2 A4 A1 A1 A2 A1 A2 A2 A4 A1
platforms Structure , 2) Heavy Lifiting of Foundations
Piping works A4 A1 A1 A2 A1 A1 A2 A4 A1 A1 A1 A2 A1 A1 A2 A4 A1
on structure More than One contractors
A4 A2 A2 A2 A1 A1 A2 A4 A1 A2 A2 A2 A1 A1 A2 A4 A1
Heavy machinery/vehicle
movement close to live Line A4 A1 A1 A1 A1 A2 A2 A4 A1 A1 A1 A1 A1 A2 A2 A4 A1
Lifting for installation of
piping, valves, platform and
goal posts.
A4 A2 A1 A1 A2 A1 A2 A4 A1 A2 A1 A1 A2 A1 A2 A4 A1
Hot Works and use of Hand
power tools A4 A2 A2 A2 A2 A2 A2 A4 A1 A2 A2 A2 A2 A2 A2 A4 A1
Tie-in to existing facilities
A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A1 A4 A4 A4 A4 A4 A4 A4 A1
Pre- commissioning/ Hydro-
testing A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1
X-Ray Radiography

ERP

Area -3 1) Installation Excavation


EW Goal of EW Goal A1 A2 A1 A2 A2 A4 A1 A1 A2 A1 A1 A1 A4
Post Post Heavy Lifiting of Foundations
Structure A1 A1 A2 A1 A1 A2 A4 A1 A1 A2 A1 A1 A1 A4
Work and More than One contractors
Piping A2 A2 A2 A1 A1 A2 A4 A1 A2 A2 A2 A2 A1 A4
Heavy machinery/vehicle
movement close to live Line A1 A1 A1 A1 A2 A2 A4 A1 A1 A1 A2 A1 A1 A4
Lifting for installation of
piping, valves, platform and
goal posts.
A2 A1 A1 A2 A1 A2 A4 A1 A1 A1 A2 A1 A1 A4
Hot Works and use of Hand
power tools A2 A2 A2 A2 A2 A2 A4 A1 A1 A1 A1 A1 A1 A4
Tie-in to existing facilities
A4 A4 A4 A4 A4 A4 A4 A1 A4 A4 A4 A4 A4 A4
Pre- commissioning/ Hydro-
testing A1 A1 A1 A1 A1 A1 A1 A1
X-Ray Radiography

Emergency Response

Area -2 1) Instalaltion Excavation


Dabhan of Combined A1 A2 A1 A2 A2 A4 A1 A1 A2 A1 A1 A1
Interface Goalposts Heavy Lifiting of Foundations
and Piping A1 A1 A2 A1 A1 A2 A4 A1 A1 A2 A1 A1 A1
More than One contractors
A2 A2 A2 A1 A1 A2 A4 A1 A2 A2 A2 A2 A1
Heavy machinery/vehicle
movement close to live Line A1 A1 A1 A1 A2 A2 A4 A1 A1 A1 A2 A1 A1
Lifting for installation of
piping, valves, platform and
goal posts.
A2 A1 A1 A2 A1 A2 A4 A1 A1 A1 A2 A1 A1
Hot Works and use of Hand
power tools A2 A2 A2 A2 A2 A2 A4 A1 A1 A1 A1 A1 A1
Pre- commissioning/ Hydro-
testing A1 A1 A1 A1 A1 A1 A1 A1
X-Ray Radiography

ERP

Area -1 1) Instalaltion Excavation


P2 Line of Goalposts A1 A2 A1 A2 A4
and P2 Line Heavy Lifiting of Foundations
A1 A1 A1 A1 A4
Heavy machinery/vehicle
movement close to live Line A2 A1 A2 A2 A4
Lifting for installation of
piping, valves, platform and
goal posts.
A1 A1 A2 A1 A4
Hot Works and use of Hand
power tools A2 A1 A2 A1 A4
Tie-in to existing facilities
A4 A4 A4 A4 A4
Pre- commissioning/ Hydro-
testing

X-Ray Radiography

ERP

CELL COLOR LEGEND CELL CONDITION LEGEND


A1 - BOTH ACTIVITIES COULD BE PERFORMED SEPERATELY WITH 30 MT RADIUS APART AUTHORISED SIGNATORIES
RED - NOT ALLOWED TWO SIMOPS ACTIVITIES
A2 - INTEGRATED PLAN TO BE FOLLOWED WHILE PERFORMING THE ACTIVITIES
YELLOW - ALLOWED TWO SIMOPS ACTIVITIES WITH CONDITION
A3 - BOTH ACTIVITIES CAN BE PERFORMED WITH CONJUSTED SPACE CONTINGENCIES
GREEN - -ALLOWED TWO SIMOPS ACTIVITIES
A4 - BOTH ACTIVITES TO BE PERFORMED DURING SHUT DOWN

You might also like