Location Area - 5 Manifold Area Area - 4 RV platforms Area -3 EW Goal Post Area -2 Dabhan Interface Area -1 P2 Line
Activity 1) Installation of new Trains(Manifolds) near to Existing
1) RV Platform Structure , 2) Piping works on structure 1) Installation of EW Goal Post Structure Work and Piping 1) Installaltion of Combined Goalposts and Piping 1) Installaltion of Goalposts and P2 Line
Train and Piping
Heavy Lifting for Heavy Lifting for Heavy Lifting for Heavy Lifting for Heavy Lifting for
machinery/vehi installation of Hot Works and Tie-in to Pre- machinery/vehi installation of Hot Works and Tie-in to Pre- machinery/vehi installation of Hot Works and Tie-in to Pre- machinery/vehi installation of Hot Works and Pre- machinery/vehi installation of Hot Works and Tie-in to Pre-
Heavy Lifiting of X-Ray Heavy Lifiting of More than One X-Ray Heavy Lifiting of More than One X-Ray Heavy Lifiting of More than One X-Ray Heavy Lifiting of X-Ray
Excavation cle movement piping, valves, use of Hand existing commissioning/ ERP Excavation cle movement piping, valves, use of Hand existing commissioning/ ERP Excavation cle movement piping, valves, use of Hand existing commissioning/ ERP Excavation cle movement piping, valves, use of Hand commissioning/ ERP Excavation cle movement piping, valves, use of Hand existing commissioning/ ERP
Foundations Radiography Foundations contractors Radiography Foundations contractors Radiography Foundations contractors Radiography Foundations Radiography
close to live platform and power tools facilities Hydro-testing close to live platform and power tools facilities Hydro-testing close to live platform and power tools facilities Hydro-testing close to live platform and power tools Hydro-testing close to live platform and power tools facilities Hydro-testing
Line goal posts. Line goal posts. Line goal posts. Line goal posts. Line goal posts.
Emergency Response
Area - 4 1) RV Excavation
RV Platform A4 A1 A2 A1 A2 A2 A4 A1 A1 A2 A1 A2 A2 A4 A1
platforms Structure , 2) Heavy Lifiting of Foundations
Piping works A4 A1 A1 A2 A1 A1 A2 A4 A1 A1 A1 A2 A1 A1 A2 A4 A1
on structure More than One contractors
A4 A2 A2 A2 A1 A1 A2 A4 A1 A2 A2 A2 A1 A1 A2 A4 A1
Heavy machinery/vehicle
movement close to live Line A4 A1 A1 A1 A1 A2 A2 A4 A1 A1 A1 A1 A1 A2 A2 A4 A1
Lifting for installation of
piping, valves, platform and
goal posts.
A4 A2 A1 A1 A2 A1 A2 A4 A1 A2 A1 A1 A2 A1 A2 A4 A1
Hot Works and use of Hand
power tools A4 A2 A2 A2 A2 A2 A2 A4 A1 A2 A2 A2 A2 A2 A2 A4 A1
Tie-in to existing facilities
A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A1 A4 A4 A4 A4 A4 A4 A4 A1
Pre- commissioning/ Hydro-
testing A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1
X-Ray Radiography
ERP
Emergency Response
ERP
X-Ray Radiography
ERP