This document summarizes the results of a CT secondary injection test conducted on 1/6/2016 at the 132kV Salboukh 9018 substation. It provides details of the CT tested, including panel number, class, adopted ratio, and function. Current values were injected and measured at various terminals. Equipment used for the test is also listed, along with calibration dates. The test verified single point earthing, star point, terminal block shorting and isolation facility, and color coding of external wires. Loop resistance excluding the CT was measured to be 0.9 ohms. The test was performed and witnessed by named technicians from Xervon and NG-CSD respectively.

Uploaded by

Humayun Ahsan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
712 views2 pages

CT Secondary Injection

This document summarizes the results of a CT secondary injection test conducted on 1/6/2016 at the 132kV Salboukh 9018 substation. It provides details of the CT tested, including panel number, class, adopted ratio, and function. Current values were injected and measured at various terminals. Equipment used for the test is also listed, along with calibration dates. The test verified single point earthing, star point, terminal block shorting and isolation facility, and color coding of external wires. Loop resistance excluding the CT was measured to be 0.9 ohms. The test was performed and witnessed by named technicians from Xervon and NG-CSD respectively.

Uploaded by

Humayun Ahsan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

SITE TEST REPORT DATE : 1/6/2016

NCC
132KV SALBOUKH 9018 132KV SALBOUKH 9018
CT Secondary Injection Test Report CT Secondary Injection Test Report
CT Details:

PANEL NO BCT Class Adopted Ratio Function


LCP (GT-03) 13 PX 3000/1A 87T1

Current Injected:
IN 1A

Panel LCP (GT 03) 6XGT-02.1405+R1 6XGT-02.1405+R1 6XGT-02.1405+R1 6XGT-02.1405+R1


Phas
Terminals Value(A) Terminals Value(A) Terminals Value(A) Terminals Value(A) Terminals Value(A)
e
IN X9:48 0.994 X1C:1 0.982 TS2:17,18 0.992 87T1:C14 0.992
87T1 DISPLAY 0.991
INE X9:50 0.974 X1C:3 0.990 TS2:19,20 0.990 87T1:C13 0.987

LOOP BURDEN:
PHASE CURRENT(A) VOLTAGE(V) BURDEN (VA)
IN-INE 1 0.723 0.723

Eqpt : Feja 300 Eqpt : Digital Clamp Meter Eqpt : Digital Multi Meter Fluke
Test Inst. Used ID# : 7601706 ID# : 43651 ID# : 30850258
Calibration Due Date :2-03-2017 Calibration Due Date : 18-08-2016 Calibration Due Date : 08-10-2016
Tested By Witnessed By
Company Name: Abdullah Sharif XER/001 Company Name: R.RIYAS
Xervon NG-CSD
Signature: Signature:
SITE TEST REPORT DATE : 1/6/2016

NCC
132KV SALBOUKH 9018 132KV SALBOUKH 9018
CT Secondary Injection Test Report CT Secondary Injection Test Report

LOOP RESISTANCE EXCLUDING CT


PHASE RESISTANCE()
Single point Earthing is checked:
IN-INE 0.9 Star point is verified :
T.B shorting and Isolation Facility is Checked:
Color coding of external wires is checked:

Eqpt : Feja 300 Eqpt : Digital Clamp Meter Eqpt : Digital Multi Meter Fluke
Test Inst. Used ID# : 7601706 ID# : 43651 ID# : 30850258
Calibration Due Date :2-03-2017 Calibration Due Date : 18-08-2016 Calibration Due Date : 08-10-2016
Tested By Witnessed By
Company Name: Abdullah Sharif XER/001 Company Name: R.RIYAS
Xervon NG-CSD