0% found this document useful (0 votes)
132 views24 pages

Single Site Verification Report

This report summarizes the results of a single site verification test conducted at site GLDC25 on November 26, 2016, which found that the site's UMTS network met key performance indicators for coverage, throughput, call setup success rate and more, though one cell was found to have an overshoot issue with its coverage area extending too far.

Uploaded by

Vũ Quốc Oai
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
132 views24 pages

Single Site Verification Report

This report summarizes the results of a single site verification test conducted at site GLDC25 on November 26, 2016, which found that the site's UMTS network met key performance indicators for coverage, throughput, call setup success rate and more, though one cell was found to have an overshoot issue with its coverage area extending too far.

Uploaded by

Vũ Quốc Oai
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 24

Single Site Verification Report

Site GLDC25
Project NSN 2016 - MLMT

Nng 12/2016
Single Site Verification Check List

1 |Page
1.General site information
2. R
Site Name GLDC25 Technology UMTS
Longitude 107.79066 Latitude 13.77125 F
Drive Test Date 26/11/2016 Drive Tester Trnh Minh Dng Cluster Gia Lai

Data

2.1 UMTS

3. RNC ID 360 LAC/RAC 31411/111 CID 54811/54812/54813


Azimuth 30/210/300 Tilt 3/3/3 Height 42

Site location and driving test routes

2 |Page
Figure 1: Site Location and test routes
There are some missing route areas because the road cant go. Detail as below:

3 |Page
Area 1:

4 |Page
Area 2

5 |Page
6 |Page
4. CQT summary

4.1UMTS

Test case No Activity/ Process Cell 1 Cell 2 Cell 3 Comment


Psc UARFCN Psc UARFCN Psc UARFCN
1 Frequency and Scrambling Code correctly defined
182 3088 183 3088 176 3088

Idle Mode
LAC: 31411 LAC: 31411 LAC: 31411
2 The LAC/RAC is correctly defined (SIB 1)

RAC: 111 RAC: 111 RAC: 111


3 CPICH_RSCP >= -75 dBm near site OK OK OK 200 meters in urban
4 CPICH_EcIo >= -10 dB near site OK OK OK 200 meters in urban
500 meters in
RRC 5 CPICH_RSCP >= -75 dBm near site OK OK OK
suburban
Connecte
500 meters in
d Mode 6 CPICH_EcIo >=-10 dB near site OK OK OK
suburban
7 Call origination & Termination test for Voice OK OK OK
8 The Voicecall service quality is good by the engineer feeling OK OK OK
Soft
9 Handover for voice service OK OK OK
Handover
11 Max throughput test for HSDPA (Target KPI: 3Mbps) 15.94 12.86 13.16
12 Average throughput test for HSDPA (Target KPI: 2Mbps) 12.71 16.42 16.50
Integrity
13 Max throughput test for HSUPA (Target KPI: 1Mbps) 2.77 1.60 3.11
14 Average throughput test for HSUPA (Target KPI: 0.7 Mbps) 3.88 2.07 3.88

7 |Page
5.Serving cell coverage:
5.1 UMTS (RSCP, MS3 lap 1)

5.1.1 Sector A

Figure 2: Footprint of sector A.

8 |Page
5.1.2 Sector B

Figure 3: Footprint of sector B.

9 |Page
5.1.3 Sector C

Figure 4: Footprint of sector C.

10 |Page
6.DT KPI summary:
6.1 UMTS

No KPI Formula Call Setup Blocked/DroppedC Result Notes


all

1 RSCP % sample RSCP >= - 95 dBm 100% MS3 lap 1

2 EcNo % sample ECNo >= -12 dB 100% MS3 lap 1

3 Pilot pollution Pilot pollution point/total RSCP 100% MS3 lap 1

4 CSSR Call setup/(Call Setup + Blocked MS1 lap 1


53 0 100%
call)*100

5 CDR Dropped Call/Call Setup*100 53 0 0% MS1 lap 1

100%
6 PDP context Number PDP Context Accept / Number MS2 lap1
activation SR PDP Context Request * 100

100% MS2 lap 1

7 PS download Mbps MS2 lap 1


6.70
throughput

11 |Page
8 PS upload Mbps MS6 lap 2
1.62
throughput

12 |Page
7.DT KPI in details:

7.1 RSCP (MS3 lap 1)

Figure 5: RSCP.

13 |Page
7.2 EcIo (MS3 lap 1)

Figure 6: EcIo.

14 |Page
7.3 RSCP (MS5 lap 2)

Figure 7: RSCP.

15 |Page
7.4 EcIo (MS5 lap 2)

Figure 8: EcIo.

16 |Page
7.5 Pilot Pollution- Poss No Of AS Member>= 4, Assumed Reporting Range = 5 (dB) (MS3 lap

1)

Figure 9: Pilot Pollution.

17 |Page
7.6 3G PS DL throughput (MS2 lap 1)

Figure 10: PS DL throughput.

18 |Page
7.7 3G PS UL throughput (MS6 lap 2)

Figure 11: PS UL throughput.

19 |Page
8.Existing issues

No Description of Problems Date Solution

Cell GLDC25X Overshoot Cell GLDC25X


1 05/12/2015 (H=32, Az=30,
M.tilt=0, E.tilt=4)
kim tra li lp t,
cha ng th hiu
chnh v ng thit
k, nu lp ng th
chnh E.titl=4 -> 6

20 |Page
8.1 Description issue no.1

- Cell GLDC25X Overshoot , vng ph ca cell chng ln sang trm i din


8.2 Description issue no.2

You might also like