Project Status Report Template

The project is 7% behind schedule due to inclement weather affecting fiber optic installation. Costs are over budget as servers delivered were incorrectly configured. Issues are being addressed by having crews work extended hours to make up time and by working with vendors to resolve configuration problems, though the project completion date is still expected to be met. Risks remain high due to weather impacts and server issues, though mitigation efforts are underway.

Uploaded by

kareem3456
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
277 views2 pages

Project Status Report Template

The project is 7% behind schedule due to inclement weather affecting fiber optic installation. Costs are over budget as servers delivered were incorrectly configured. Issues are being addressed by having crews work extended hours to make up time and by working with vendors to resolve configuration problems, though the project completion date is still expected to be met. Risks remain high due to weather impacts and server issues, though mitigation efforts are underway.

Uploaded by

kareem3456
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

PROJECT STATUS REPORT TEMPLATE

Project Status Summary Percent Complete: xx%


Scope Schedule Cost Risks Quality

This section of the project status report provides a quick executive overview of the status of the project. It is intended for high level management
so it should not get too much into the details of the project. However, it should highlight anything specific which should be brought to their
attention. The Scope/Schedule/Cost/Quality table above is a quick way to present a color coded dashboard for the status report. Typically a
variance of +/- 5% will warrant a yellow cautionary color and +/- 10% will warrant a red warning color. For a project which needs tighter control
+/- 2% and +/- 5% are used for these thresholds; whereas, other projects with less strict control may use 10% and 20% variances. The percent
complete here should be the percent completion of the entire project. For any constraint which is yellow or red this section should contain brief
explanation the reason why.
The project schedule is 7% behind schedule due to inclement weather which has affected the installation of the fiber optics throughout the
campus. This should not affect the project completion date as crews are planning to make up the time by working weekends and extended hours
next month.
The project risks is red due to the inclement weather and servers which were delivered last month weren't configured with the correct hardware
specifications. The impact of the inclement weather on the schedule will be mitigated by having crews make up the time by working weekends
and extended hours next month. Currently we are working with the server vendor to resolve the server hardware configuration problem. The
configuration delivered will not handle the work load of going live in two months; however, it is sufficient for development and testing activities
scheduled prior to going live.

Worked Planned Last Week


For this section of the project status report you can copy the "Worked Planned for Next Week" section from last week's status report and paste it
into this section.

Work Completed Last Week


In this section you should provide a highlight of work performed and milestones and/or deliverables met during the past week.

Work Planned for Next Week


Provide an overview of the work being performed during the next week and any milestones or deliverables you expect to meet.

Open Issues
This part of the project status report should contain a list of open issues along with their status.

Open Risks
This section should contain a list of all open risks (risks which have occurred, or are on the verge of occurring).

Deliverables and Milestones


This section is a quick table which shows the status of the project milestones and deliverables.
The first column is for the name of the Milestone or Deliverable as it's in the project plan. The next column is the WBS number, this makes it
easier to find the milestone/deliverable in the project plan. Planned is the planned date according to the approved project plan, the forecasted is
the date you expect and actual is the actual date the milestone was met or deliverable was delivered. The status is a simple one or two word status
such as; completed, on schedule, behind schedule, accepted, etc.
Milestone WBS Planned Forecasted Actual Status

Deliverable WBS Planned Forecasted Actual Status

Open Change Requests


Use this section of the project status report to track all changes to the project and report the status of those changes. Tracking of changes starts
with the request for the change, tracks the approval status and ends when the change is added to the project, the project plan and schedule update
and it has become a part of the project.
Change Request Name Change Request No. Request Date Current Status

Add xyz Functionality CR55043 3/14/20xx In Review by CCB

Add Redundant Servers CR55012 2/17/20xx Approved and Being Added to the Project Plan

Key Performance Indicators (KPI's)


Many managers turn right to this section as it provide a clear view of the status of the project according the earned value metrics. In your project
you need to decide which metrics to monitor, but be sure not to include too many as you may end up providing the same information but in
different forms. We like to track SV, SPI, CV and CPI in the layout below. Next to the schedule and cost headings you should state whether the
project is ahead of or behind schedule and over or under budget. Notice we left out the word on - it is highly unlikely that you. If you like you can
also include a paragraph at the beginning of this section of the project status report presenting the earned value results in verbose.
Schedule - Project is Ahead/Behind Schedule
Schedule Variance (SV): $xxxx
Schedule Performance Index (SPI): x.xx
Cost - Project is Over/Under Budget
Cost Variance (CV): $xxxx
Cost Performance Index (CPI): x.xx