Hardware Staging Checklist

This document outlines the hardware installation requirements and project plan for a new project. It includes details on funding, space requirements, key activity dates, cabinet types and configurations, electrical power specifications, network and installation issues, data center standards, vendor issues, and assigned actions and statuses. The project team must ensure the hardware is delivered and installed properly according to the checklist, and meets requirements for space, power, networking and data center standards.

Uploaded by

Alan Mudary
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
514 views3 pages

Hardware Staging Checklist

This document outlines the hardware installation requirements and project plan for a new project. It includes details on funding, space requirements, key activity dates, cabinet types and configurations, electrical power specifications, network and installation issues, data center standards, vendor issues, and assigned actions and statuses. The project team must ensure the hardware is delivered and installed properly according to the checklist, and meets requirements for space, power, networking and data center standards.

Uploaded by

Alan Mudary
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

Hardware installation requirement - check list and project plan

Project Name and Acronym:


Date: Development Org:
Sum Total Po($): Line of Business:
Project Team:
Customer Project Management-
Customer Technical Representative-
-
IT Production Support-
-
Production Monitoring-
Site Coordinator(s)-
-
Hardware Vendor(s)-
-
Agenda / Requirement
Funding PO # -
PO or Check Request-
Space Cabinet Type(s)-
Requirements Quantity, each-
External (H x W x D)-

Capacity Co-location
Planning Cable Length
Limitations-
Approved Site(s)-
Bay Assignment(s)-

Key Activity Production-


Dates Staging
Network Connectivity-
Hardware Installation -
Hardware Delivery-
Power Ready-
Provisioning Request-
Cabinet Types Original Equipment-
And
Configurations
Other Equipment
Manufacturer (OEM)-
Required OEM
Configuration-
OEM Options-
Hardware installation requirement - check list and project plan

Electrical Power Qty. Cabinet per type-


Specs. Qty. of Power Cords/ cab.-
Plug and Connector Type-
Special Order lead time-
Volts and Amps-
Power Multiple drops per cabinet-
Boundary
Multiple cabinets per set-
Split
Analog Quantity-
Line For Dial PBX or Telecom
Modem
Security-
Network Issues Fiber Optic Cable tray-
Plenum Rated Cabling-
Hardware Installation Team-
Install Issues Installation Plan-
Hardware Compliant-
Power On/Off restrictions- (Site dependent)
Installation drawing- (Provided by CM with dimensions)
Floor Tile Cut(s) - (Dimensions and locations)
Cabinet Bracing- (NIC sites and earthquake zones)
Installation CMR-
Change Manage Request
Data Center Site Rules of Conduct-
Standards Service Level Agreement-
Site Staff Training-
Scheduling Site Visit-
Hardware Shipments-

Prod. Support Alarm Monitoring-


7 x 24 On-call Support
Tape backup-
Hardware installation requirement - check list and project plan

Vendor Issues:

Action:

Assignee(s):
Response date:
Status:

Action:

Assignee(s):

Response date:
Status:

Action:

Assignee(s):
Response date:
Status:

Action:

Assignee(s):
Response date:
Status: