Assignment 1 2017
Assignment 1 2017
Task
SLIITs master plan (1999) also include building(s) for a three year nursing degree program, a
primary and secondary school, a swimming pool, and a wastewater treatment plant, in addition to
what it has now. Also, it want to improve the drainage of the northern half by fully utilizing the
natural (?) stream flowing through. You are completely free in your choice of buildings
(including net/gross foot print) and locations, access, utilities, foundations etc. However, as in
any civil engineering work quality and cost need to be thought of.
# Faculty of Nursing: (batch size 150; four lecture rooms of the size E101; three laboratories
each of the size of the water laboratory)
# School: Mix gender; 2000 students; no need to provide separate sport infrastructure
# Swimming pool: 32 m long; six lanes
Specific tasks
1) The site plan (survey map/boundary survey map) of SLIIT: identify SLIIT land
boundaries, mark internal/external roads, buildings, waterways and special geological
features. In addition spot heights may be taken to accommodate elevation differences if it
is needed for the other tasks.
2) Identify the appropriate layout of all buildings and other facilities (existing and proposed)
on the site map. Assume you are free to change the locations and dimensions of the
existing infrastructure, and the terrain has not been changed with time. This will insinuate
whether the existing layout is the best
3) The layout of the proposed components on the existing layout (this is what that could be
done, as demolish and reconstruct options are infeasible)
4) The internal, and external (i.e. on public roads) pedestrian and vehicular movements with
improvements needed once the new components are added
5) Preliminary costing for the proposed improvements/additions (low cost with an
appropriate quality should be aimed; e.g. may be a 10 story building on piles can be more
cheap than two five stories on rafts, but it should be structurally acceptable)
Page 1 of 2
Deliverables
NOTES:
1. Approximate maps (site plans) are enough; accuracy expected: linear ( 10%); area
(10%) and elevation/spot heights (nearest 1 m). You may use an aerial
map/photograph/topo-sheet and digitize or may do a cadastral survey
2. Surveying equipment will be issued for a predefined period. Unable to complete within
the given time, means the group need to resort to other options, hiring from an external
organization!
3. All maps should be drawn using a software like AutoCAD with different layers
4. In CDP I and II self-studying is expected in addition to what were taught
Page 2 of 2