Concrete Services Standard Subcontract

Download as pdf or txt
Download as pdf or txt
You are on page 1of 21

Job No.

: number
Subcontract No.: number
Cost Code: number
Vendor No.: number

SUBCONTRACT AGREEMENT
AGREEMENT made this date day of month, year (hereinafter Agreement or Subcontract) between

Concrete Services (Contractor)


15 Business Park Way, Suite 101
Sacramento, CA 95828
Attn: project manager
Phone: number
Fax: number
Email: project manager email address
and
Subcontractor Name (Subcontractor)
street address
city, state, zip
Attn: contact name
Phone: number
Fax: number
Email: contact email address

For Subcontractor to perform work as described in Item B below for the following Project:

Project is:
project name
project address

Owner:
owner's name
owner's address

Architect:
architect's name
architect's address

Contractor and Subcontractor (the Parties) agree as set forth below:

A. Except for modifications and change orders issued after execution of this Agreement, the Subcontract
Documents, consist of the following documents, all of which are either attached hereto as Attachments
or are hereby incorporated by this reference and made a part hereof as follows:

Subcontract Agreement
commitment date

Page 1 of 21
1. This Subcontract Agreement, and the following Attachments:

MBE/WBE/DVBE
A Insurance / Bonding Requirements date J date
Construction Program
B Contract Document List date K Subcontract Modifications date
Scope of Work (Standard and Trade
C date L Prevailing Wage date
Specific)
Virtual Design & Construction
D Contract Recapitulation date M date
Guidelines
E Billing Procedures date N LEED Project Procedures date

F Project Schedule date O Federal Project Requirements date

G Project Procedures Manual date P Not used at this time date


Quality Management
H Collective Bargaining Agreement date Q date
Requirements
Safety, Health, Environmental
I date
Minimum/MPS

2. The Prime Contract No. number, owner name & date, the following Amendments to the Prime Contract
number & date or N/A and all documents incorporated therein including, but not limited to, drawings and
specifications. An index of the Prime Contract Documents is attached hereto as Attachment B.
(Attachment B is not applicable for this Agreement ).

B. Subcontractor shall execute the following scope of work (Work) in accordance with the Subcontract
Documents generally described as:

Brief description of scope of work (Scope of Work continues on Attachment C)

C. Contractor shall pay Subcontractor for performance of the Work the stipulated sum of
written amount dollars ($ ) (Subcontract Sum) subject to additions and deletions and retention as
provided in the Subcontract Documents.

D. Subcontractor shall provide 100% Performance and Payment Bonds, pursuant to Terms and Conditions
Yes No

E. Subcontractor shall provide certified payroll Yes No

Page 2 of 21
SUBCONTRACT AGREEMENT
CALIFORNIA FORM

Further, Contractor and Subcontractor agree upon the Standard General Terms and Conditions below.

1. SUBCONTRACT DOCUMENTS

(a) Definition and Access to Subcontract Documents. The term Subcontract Documents as used herein,
means the Agreement, Swinerton Builders Subcontract Terms and Conditions, all attachments identified
in the Agreement, and modifications and change orders issued after execution of the Agreement, and the
Prime Contract Documents. The Prime Contract Documents as used in the Subcontract Documents are
defined to mean and include the Prime Contract between the Owner and Contractor, including, but not
limited to, all drawings and specifications, general and special or supplementary conditions and all other
documents or attachments incorporated in the Prime Contract. An Index of Prime Contract Documents is
attached hereto as Attachment B. Upon Subcontractors request, Contractor shall make copies of the
Subcontract Documents available for review and reproduction, however, Contractor reserves the right to
redact confidential, financial and trade secret information from the Prime Contract Documents made
available to Subcontractor.

(b) Assumption of Prime Contract Documents. By signing this Agreement, Subcontractor certifies that it
is fully familiar with all the terms and conditions of all Subcontract Documents and Prime Contract
Documents, including but not limited to provisions relating to insurance, payment, change orders, claims
presentation and dispute resolution, and certifies that it is familiar with the location of the job site, and the
conditions under which the Work is to be performed and that it enters into this Subcontract based upon its
investigation of all such matters and is not relying on any opinions or representations of Contractor. This
Subcontract represents the entire agreement between the Parties. The Prime Contract Documents are
incorporated in this Subcontract by reference. The Work to be performed hereunder is a portion of the
work required of Contractor under the Prime Contract Documents. Subcontractor and its sub-
subcontractors, of any tier, will be and are bound by and shall strictly comply with the terms and
conditions of the Prime Contract Documents insofar as they relate in any way, directly or indirectly, to
the Work covered by and supplied under this Subcontract. Subcontractor agrees to be bound to
Contractor in the same manner and to the same extent as Contractor is bound to Owner under the Prime
Contract Documents, to the extent of the Work provided for in this Subcontract, and that where reference
is made to Contractor in the Prime Contract Documents, and the Work or specifications therein pertains
to Subcontractors trade, craft, or type of work, then such Work or specification shall be interpreted to
apply to Subcontractor instead of Contractor. All rights and remedies reserved to the Owner under the
Prime Contract Documents shall apply to and be possessed by Contractor in its dealings with
Subcontractor. Subcontractor agrees to incorporate the Subcontract Documents and Prime Contract
Documents by reference into all sub-subcontracts and supplier agreements.

(c) Interpretation. Capitalized terms defined in this Agreement shall apply to all Subcontract Documents,
and terms not defined herein shall have the same meaning defined in other Subcontract Documents. The
misplacement, addition or omission of a word or character shall not change the intent of the Subcontract
Documents. The Subcontract Documents are complementary, and what is required by any one shall be as
binding as if required by all. Subcontractor shall promptly report to Contractor in writing any
discrepancies or errors which come to its attention in the Prime Contract Documents or the Subcontract
Documents.

(d) Effective Date. Subcontractor confirms that the Work performed by Subcontractor on the Project, prior
to the date on which this Agreement is executed by the Parties, is subject to the terms and conditions of
the Subcontract Documents and that all obligations, representations and warranties made by
Subcontractor herein are retroactive to the date on which Subcontractor commenced Work on the Project.

(e) Order of Precedence. In the event of conflicts in the Subcontract Documents, the order of precedence,
highest to lowest, shall be as follows:

(1) All modifications and change orders;


(2) Subcontract Agreement and Attachments; and

Page 3 of 21
SUBCONTRACT AGREEMENT
CALIFORNIA FORM

(3) The Prime Contract Documents.

In the event that there is an inconsistency or conflict among any of the provisions of the Subcontract and
the obligations and duties arising therefrom, the provision imposing the most stringent obligation on the
part of the Subcontractor will control.

2. PERFORMANCE OF THE WORK

(a) The Subcontract Work or Work includes all labor, services, materials, freight, packaging, supplies,
hardware, fasteners, fixtures, tools, layout, engineering, value engineering, detailing, equipment,
scaffolds, hoisting, administration, supervision, transportation, warehousing, storage and other facilities,
permits, and all other items and services necessary for the proper and complete performance and
acceptance of the work and obligations set forth in the Subcontract Documents for a Project.

(b) Subcontractor agrees (a) that materials and equipment furnished by Subcontractor shall conform strictly
to the subcontract Documents, (b) to furnish all materials within the time specified herein, with all
necessary certificates and permits for installation and erection of same, and to layout, install and erect
same and complete said work within the time specified, according to the Subcontract Documents and to
the satisfaction of Owner, Architect and Contractor, (c) to furnish all scaffold and equipment (including
equipment for hoisting) that may be necessary to do its work expeditiously and to provide traffic and
safety controls at all times while using such equipment on the job site, (d) to remove and replace any
defective materials or work forthwith on notice from Architect or Contractor and to bear the expense of
making good all work of others, including the Contractor, which is destroyed or damaged by such
removal and replacement, (e) to perform the work entirely at Subcontractors risk, (f) to provide all
proper and sufficient and necessary safeguards against all injuries and damage whatsoever, and to comply
with all safety requirements imposed by law, (g) to secure and pay for those permits required by the
Subcontract Documents to be secured for the work applicable to this Subcontract, (h) to provide a full-
time competent superintendent acceptable to Contractor who shall have authority to act on behalf of
Subcontractor and who shall attend all meetings as requested by Contractor and who shall supervise the
work hereunder.

(c) Subcontractor shall prepare, and obtain approval as required by the Subcontract Documents for, all shop
drawings, details, samples, and do all other things necessary and incidental to the prosecution of its work
all in conformance with Contractors progress schedule. Subcontractor shall submit a schedule of values
for approval at the commencement of the work. Approval of shop drawings, submittals, details and
samples by Contractor shall not relieve Subcontractor of its obligation to perform its work according to
the terms and consistent with the intent of the Subcontract Documents.

(d) The installation of the Subcontractors work will be considered evidence of its acceptance of the
conditions as being correct and to its approval. The entire responsibility for proper configurations and
dimensions for prefabrications of any part of the work shall rest with Subcontractor.

3. SCHEDULE

(a) Time is of the essence of this Agreement. Subcontractor shall provide Contractor with scheduling
information and a proposed schedule for performance of its work in a form and by a date acceptable to
Contractor. Subcontractor shall conform to Contractors reasonable progress schedule and all reasonable
revisions or changes made thereto, which Subcontractor recognizes shall be made for the benefit of the
Progress of Project, and not necessarily the Subcontractor or its Work, however, Contractor shall make all
reasonable efforts to incorporate Subcontractors reasonable requests into any Project schedules. As such,
Subcontractor shall prosecute its work in a prompt and diligent manner in accordance with Contractors
progress schedule without delaying or hindering Contractors work or the work of other contractors or
subcontractors. Subcontractor shall coordinate the work covered by this Agreement with that of all other

Page 4 of 21
SUBCONTRACT AGREEMENT
CALIFORNIA FORM

contractors, subcontractors, and of Contractor, in a manner that will facilitate the efficient completion of
the entire work.

(i) Subcontractor agrees to notify Contractor, in writing within two (2) working days (or 24-
hours prior to the time within which Contractor must provide notice to the Owner pursuant to the
terms of the Prime Contract, whichever is earlier) of any delays or anticipated delays in the
performance of the work and to state the cause of said delays. If Subcontractor fails to provide
the written notice in the time set forth in this provision, Subcontractor agrees that its failure shall
constitute a waiver of all rights to recover any additional time or costs associated with all delays
or anticipated delays for which timely notice was not given. If Contractor is properly notified,
then, should the cause be a condition upon which the Owner permits extension of time in the
Prime Contract Documents, Contractor will apply for such extension.

(ii) In the event Subcontractor fails to maintain its part of Contractors schedule, it shall, without
additional compensation, accelerate the work as Contractor may direct until the Subcontract
Work is in accordance with such schedule. Contractor shall have complete control of the
premises on which the work is to be performed and shall have the right to decide the time and
order in which various portions of the work shall be installed and the relative priority of the work
of Subcontractor and other subcontractors, and, in general, all other matters pertaining to the
timely and orderly conduct of the work of Subcontractor.

(b) No claims for additional compensation or damages for delays, including, but not limited to, force majeure
delays, delays caused by third-party utilities, governmental bodies and regulatory authorities, delays
caused by the Owner, its agents, employees, or its separate contractors, or any other delay beyond the
Control of Contractor shall be recoverable from Contractor, and the above-mentioned extension of time
for completion shall be the sole remedy of Subcontractor; provided, however, that in the event Contractor
obtains additional compensation from Owner, on account of such delays to Subcontract Work,
Subcontractor shall be entitled to such portion of the additional compensation so received by Contractor
from as is equitable under all of the circumstances. In the event that Contractor prosecutes a claim against
Owner for additional compensation for any delay, Subcontractor shall cooperate fully with Contractor in
the prosecution thereof and shall pay costs and expenses incurred in connection therewith, including
actual attorneys and consultants fees and costs, to the extent that said claim is made by Contractor at the
request of or for the benefit of Subcontractor.

(c) If Subcontractor should default in performance of the work or otherwise commit any act which causes
delay to Contractors work, Subcontractor shall be liable for all losses, costs, expenses, liabilities and
damages, including actual damages, consequential damages and any liquidated damages, sustained by
Contractor, or for which Contractor may be liable to Owner or any other party because of Subcontractors
default or delay. Neither party shall be liable to the other for consequential or liquidated damages
incurred directly by either party arising out of or related to a breach of this Subcontract, except that
Subcontractor shall remain liable for indemnification and the duty to defend against any actual,
consequential or liquidated damages that arise out of the Work of Subcontractor or a breach of this
Agreement that are assessed or claimed against Contractor by third parties, which includes, but is not
limited to, the Owner, as well as for any such damages that are caused by an insurable event and covered
by insurance.

(d) Subcontractor agrees to submit (1) on a weekly basis, and at the time of submission of progress payment
requests, a report, in a form satisfactory to Contractor, itemizing on a weekly basis actual quantities of
work performed and (2) on a daily basis a Subcontractor Daily Report for each day on the jobsite that
indicates the daily manpower and equipment employed by Subcontractor on the project, as well as a
description of the activities performed that day.

Page 5 of 21
SUBCONTRACT AGREEMENT
CALIFORNIA FORM

4. WARRANTY

a) Subcontractor warrants to Owner, Architect and Contractor that all materials and equipment furnished
shall be new, unless otherwise specified, and that all Subcontract Work shall be free from faults and
defects and in conformance with the Subcontract Documents. All work not conforming to these
requirements, including substitutions not properly approved and authorized in writing, shall be considered
defective.

b) Subcontractor will comply with all applicable federal, state and local laws, codes, ordinances, rules,
regulations, orders and decrees of any government or quasi-government entity having jurisdiction over
the Project, the Project Site, the practices involved in the Project, or any Subcontract Work.

5. CHANGES IN THE WORK

(a) Contractor may at any time, by written change order signed by Contractors Project Manager only, and
without notice to the Surety or Sureties who issued Subcontractors bonds, make changes in the work to
be performed hereunder, within the general scope hereof. If such changes cause an increase or decrease in
the cost of the work or in the required time for its performance, an equitable adjustment shall be made
subject to the conditions of this Paragraph. If Contractor and Subcontractor cannot agree on the cost or
time of performance for the change order work, or if Contractor or Owner disagrees that any claimed
work is change work, Subcontractor shall nevertheless timely perform the disputed work as directed by
Contractor in accordance with the change and dispute provisions of this Subcontract and, if applicable,
the Prime Contract Documents.

(b) Subcontractor shall make no changes in the work nor shall it be entitled to any additional compensation
unless first authorized in a change order signed by Contractors Project Manager.

(c) No increase in compensation of the Subcontractor or extension of time for performance shall be allowed
for change order work unless the Subcontractor makes application therefor, in writing, to Contractor
within seven (7) days from the date on which Subcontractor receives a notification of change in the work,
(or three days prior to the time within which Contractor must submit a change order request or quotation
to Owner pursuant to the terms of the Contract Documents, whichever is earlier), whether the notification
instructs Subcontractor to proceed or not-to-proceed with the work. Subcontractors application must
include a detailed breakdown of all costs and any schedule delays. If Subcontractor does not submit an
application in this time period, Subcontractor shall be deemed to waive and release any claim for
additional compensation and additional time required for the performance of work. The Contractor will
quote the Owner accordingly and Subcontractor will be responsible to perform the changes defined in the
change order with no adjustment to Subcontractors compensation or time required for the performance
of the work.

(d) Notwithstanding any other provision of this Subcontract, to the maximum extent allowed by applicable
law, Contractor will be liable to Subcontractor for any delay, disruption, loss of productivity, interference,
acceleration or other damages to Subcontractor, resulting from or arising out of: (1) any acts or omissions
by Owner, Architect, third-party utilities, governmental and regulatory authorities, or anyone for whom
these parties may be responsible, (2) fire or other casualty, riots, strikes or other combined action of the
workmen or others, (3) any acts of God, or (4) any other cause beyond Contractors reasonable control,
only if and to the extent Owner is liable to Contractor for such damages and actually pays Contractor for
such damages. It is expressly understood that the only obligation Contractor has to Subcontractor under
this provision is to pass on to Owner any claim Subcontractor has for such damages, and to pay to
Subcontractor any amounts which Owner pays to Contractor as a result of such claim. Subcontractor will
reimburse Contractor for all costs and expenses, including attorneys and consultants fees and costs,
incurred in connection with presenting any such claim to Owner.

Page 6 of 21
SUBCONTRACT AGREEMENT
CALIFORNIA FORM

(e) If Subcontractor is performing disputed work pursuant to Section 5(a) above, the time and material cost
associated with such work must be tracked and submitted to Contractor on a daily basis. Failure to
provide any time and material tickets on a daily basis shall be agreement by the Subcontractor that work
was not performed that day, and/or the work that was performed is not recoverable from Contractor. Any
signature by Contractor employee on a time and material daily ticket shall mean Contractor is
acknowledging receipt of the time and material ticket only, and such signature shall not be construed in
and of itself as an admission that Contractor is accepting any such time or cost as extra work or that the
cost associated with such time or material is otherwise due Subcontractor.

6. PAYMENT

(a) Contractor agrees, in consideration of the full and complete performance of the work by the
Subcontractor in accordance with the terms and provisions hereof, to pay or cause to be paid to the
Subcontractor the Subcontract Sum. Subcontractor understands that all payments to Subcontractor will be
made only from a special fund and a specific source, namely, from payments made by Owner from time
to time to Contractor in respect of work performed by Subcontractor. Contractor shall make payments to
Subcontractor within ten (10) days after receipt by Contractor of payment from Owner for the work of
Subcontractor for which payment has been made (or within such shorter period as may be required by
law).

(b) In the event Contractor is not paid by Owner any sum claimed due by Subcontractor, then Contractors
obligation to make payment to Subcontractor with respect to the time for payment to Subcontractor shall,
in addition to any other conditions set forth in this Subcontract or the Contract Documents, be subject to
the following conditions precedent:

(i) If Contractor does not pay Subcontractor sums claimed due under the Subcontract as a result of
nonpayment by the Owner and such nonpayment is thereafter finally adjudged (as hereafter
defined) to have been caused by a breach by Contractor of the Prime Contract, then Contractor
shall pay to Subcontractor such sum as is due under this Subcontract, inclusive of and limited to
simple interest thereon at the rate of 10% per annum accruing from the date such sum was first
due and owing to Subcontractor as set forth above. The term finally adjudged as used in this
Paragraph (i) shall mean the date final judgment is entered in any action by Contractor against
Owner for recovery of sums due under the Prime Contract.

(ii) If Contractor does not pay Subcontractor sums claimed due under the Subcontract as a result of
nonpayment by the Owner and such nonpayment is caused by the Owners insolvency,
bankruptcy, or lack of sufficient assets, or for reasons other than a breach by Contractor of the
Prime Contract as provided in Paragraph (i) above, then Subcontractors right to payment shall be
conditioned upon the passage of such time as may be reasonable and necessary for Contractor to
fully exercise and exhaust to final judgment its legal, extra judicial and appellate rights and
remedies for collection of sums unpaid by Owner, together with the passage of such additional
time as reasonably necessary for execution by Contractor of any final judgment entered in its
favor. Simple interest only on such sums as are due to Subcontractor under this Paragraph (ii)
shall accrue and be payable to Subcontractor at the rate of 10% per annum commencing from the
expiration of the reasonable time reserved to Contractor in this Paragraph (ii) for recovery and
collection from Owner.

(iii) Subcontractor agrees to preserve and maintain its mechanics lien (of any sort as allowed by law,
including but not limited to construction lien, or materialmans lien) and stop notice rights with
respect to the project and to exercise and exhaust those rights in the event that Contractor does
not pay Subcontractor sums due under the Subcontract as a result of payment default on the part
of the Owner under the Prime Contract.

Page 7 of 21
SUBCONTRACT AGREEMENT
CALIFORNIA FORM

(iv) Nothing contained herein shall be interpreted as releasing or waiving any statutory mechanics
lien (of any sort allowed by law including but not limited to construction lien or materialmans
lien), bond or stop notice right reserved to Subcontractor under the law; provided however, that
Subcontractor agrees in the event Subcontractor asserts a claim against any statutory or common
law payment or performance bond issued in connection with the Project, the surety to such bond
and the Contractor (if Contractor is a principal on the bond) shall have the right to assert as a
defense to such claim, the nonoccurrence of any conditions to payments set forth in this
Subcontract, including without limitation the failure or delay of payment to Contractor.

(v) If any portion of this Section 6 is determined to be void, voidable or illegal, such portion shall be
deemed severed from the other portions of this Section 6 that are not void, voidable or illegal and
such other portions shall be enforceable in accordance with their terms.

(c) Contractor shall retain from progress or other payments hereunder ten percent (10%) of the amount due
until after final acceptance of the work by the Architect and Owner and until ten (10) days after
Contractors receipt of final retention payment from Owner. All billings for work performed during a
calendar month shall be made on Contractors standard forms Progress Payment Request and
Conditional Waiver and Release Upon Progress Payment and must include a schedule of values
itemizing in detail work completed and materials and equipment put in place during such month, and a
current Change Order log itemizing approved change orders, submitted and outstanding quotes. No other
form of payment request will be accepted. Payment requests must be delivered to Contractor sufficiently
early as to not delay timely submission of Contractors progress payment requests to Owner.

(d) Subcontractor, as requested by Contractor, shall furnish certified copies of all payrolls in the manner
prescribed by Contractor. Contractor reserves the right to require mechanics lien, stop notice,
construction lien, materialman and bond claim releases (including releases from lower tier
subcontractors) and payment affidavits in duplicate with each application for progress payments and on
final payment. Contractor also reserves the right to require Subcontractor to execute an Unconditional
Waiver and Release form as to previously paid progress payments if required by the Contract Documents
or the Owner. Receipt by Contractor of all required releases and affidavits, and approval by Contractor of
those documents are conditions precedent to payment by Contractor to Subcontractor.

(e) Unless otherwise provided in the Contract Documents, payments will be made on account of materials or
equipment not incorporated in the Work but delivered and suitably stored at the site and, if allowed in the
Contract Documents and approved in advance by the Contractor, payments may similarly be made for
materials or equipment suitably stored at some other location agreed upon in writing. Payments for
materials or equipment stored on or off the site shall be conditioned upon submission by Subcontractor of
bills of sale or such other procedures satisfactory to Contractor to establish Owners title to such materials
or equipment or otherwise protect Owners interest, including applicable insurance and transportation to
the site for those materials and equipment stored off the site.

(f) Contractor may withhold or, on account of subsequently discovered evidence, may nullify, the whole or
part of any payment to protect Contractor from loss on account of (a) defective work not remedied; (b)
third party claims filed or reasonable evidence indicating probable filing of such claims; (c) failure of
Subcontractor to make payments properly to its subcontractors or for materials, equipment, labor or
fringe benefits; (d) reasonable doubt that the work under this Agreement can be completed for the balance
of the Subcontract Price then unpaid; (e) damage to Contractor, a separate contractor or another
subcontractor; (f) reasonable doubt that the work under this Agreement can be completed within the time
required herein and that the balance of the subcontract price then unpaid would be sufficient to cover the
actual or liquidated damages resulting from the anticipated delay; (g) penalties assessed against
Contractor or Subcontractor on account of Subcontractors failure to comply with state, federal or local
laws and regulations; (h) persistent failure to carry out the work under this Subcontract in accordance
with the Contract Documents; or (i) any other ground for withholding payment allowed by state or federal

Page 8 of 21
SUBCONTRACT AGREEMENT
CALIFORNIA FORM

law, or as otherwise provided in this Subcontract. When the reason(s) for withholding payment is/are
rectified, such amounts as are then due and owing shall be paid or credited to Subcontractor.

(g) Contractor reserves the right to make payment by joint check or by direct check to Subcontractors
materialmen or sub-subcontractors or to any other person or entity who has performed work or furnished
materials under this Subcontract and may have a claim or a right of action against Contractor,
Contractors Surety, or the project under any law; provided, however, that Contractor shall not be
obligated to exercise the right reserved herein for the benefit of any person or entity other than itself.
Subcontractor agrees that Contractor shall have the right to determine the manner in which payment shall
be made. Contractors payment by way of joint check or direct check to Subcontractors materialmen or
sub-subcontractors shall be applied as though the money had first been paid to Subcontractor. However,
prior to making any payment by joint check or direct check, Contractor shall provide Subcontractor
written notice of any such intent, and allow Subcontractor a reasonable opportunity to provide reasonable
information why such funds are not due or owing to any sub-tier subcontractor or supplier.

(h) Any payment made hereunder prior to completion and acceptance of the work shall not be construed as
evidence or acknowledgment of proper completion of any part of Subcontractors work.

7. INDEMNIFICATION AND DUTY TO DEFEND

(a) To the fullest extent permitted by law, Subcontractor specifically obligates itself to protect,
immediately defend, indemnify and hold Contractor, Owner and their respective officers, directors,
employees, agents and representatives and any other person indemnified by Owner (hereinafter
referred to as the Indemnitees) harmless against claims, damages, losses, costs, expenses,
including any fees of accountants, attorneys, experts or other professionals, or investigation
expenses, and liabilities in law or in equity arising out of, resulting from, or in any way connected
with the Subcontractors operations and the Subcontract Work. Subcontractors obligations to
protect, indemnify and hold Indemnitees harmless, in addition to the separate and independent
duty to defend, include, but are not limited to, the following:

(i) All damages, liability, penalties, costs, losses, damages, expenses, costs (including attorneys
fees and costs), losses, causes of action, demands, claims or judgments, for any alleged or
actual violation or infringement by Subcontractor (or Subcontractors employees or
subcontractors or consultants or vendors of any tier) of any law, statute, codes, safety or
occupational health orders, rules, regulations, standards, orders or any patent or patent
right;

(ii) All damages, liability, penalties, costs, losses, damages, expenses, costs (including attorneys
fees and costs), losses, causes of action, demands, claims or judgments, resulting from
injury to or death of any person (including Subcontractors employees) or damage to
property of any kind (including economic loss), including the Subcontract Work under this
Agreement or the work of others on the Project, which injury, death or damage arises out
of or is in any way connected with the performance of Subcontract Work under this
Agreement;

(iii) All damages, liability, penalties, costs, losses, damages, expenses, costs (including attorneys
fees and costs), losses, causes of action, demands, claims or judgments, arising from:
(1) construction liens, mechanics liens, or other materialmans lien of any sort, stop notice
claims and payment bond claims made by any sub-subcontractor, suppliers, laborers,
rental companies, or the like, and (2) claims and liens for labor taxes, materials, appliances,
equipment, and supplies whatsoever, including any costs, attorneys fees, and incidental
damage resulting therefrom; and for failure by Subcontractor or any party acting on
Subcontractors behalf to comply with all laws, ordinances and regulations of all
governmental authorities in any manner relating to the Subcontract Work;

Page 9 of 21
SUBCONTRACT AGREEMENT
CALIFORNIA FORM

(iv) Subcontractors failure to fulfill the covenants set forth in each subpart of Section 17,
Labor Relations and Subcontractor Employees;

(v) Failure of Subcontractor to comply with the provisions of Section 8, Insurance;

(vi) Any failure or alleged failure to comply with the terms of this Agreement, the Subcontract
Documents, including the Prime Contract Documents; and

(b) Subcontractors indemnity and hold harmless obligations hereunder shall apply to any acts,
omissions, willful misconduct, negligent conduct, other fault, or liability without fault of any person
or entity, including but not limited to Subcontractors agents, employees, subcontractors, suppliers,
and any other individual or entity for whom Subcontractor may be responsible, whether active or
passive, and whether or not sole or concurrent with that of any other person or entity; except that
this indemnity obligation shall not require that Subcontractor indemnify any of the persons or
entities named as Indemnitees herein against claims arising from his, her, or its sole negligence or
willful misconduct.

(c) Subcontractor acknowledges the separate and independent duty to defend set forth in this
paragraph, and shall defend the referenced parties upon demand regardless of whether any
indemnification obligations later arises. Subcontractor agrees that it shall (at the option of the
Indemnitee) at its own cost, expense and risk, immediately upon tender defend the Indemnitees,
with counsel of the Indemnitees own choosing, in any and all claims, demands, actions, lien actions,
suits or other legal, arbitral, administrative or other proceedings which may be brought or
instituted against Indemnitees. Subcontractors duty to defend the Indemnitees, as set forth above,
shall arise immediately upon notification and demand by an Indemnitee to Subcontractor. If an
Indemnitee is forced to pay for its own defense because Subcontractor fails to immediately comply
with its defense obligations set forth in this Paragraph 7, said Indemnitee shall be entitled to simple
interest on the principal balance of attorneys fees and costs incurred at the rate of 1 % monthly.

(d) The foregoing indemnity and defense obligations are not limited by the amount of any available
insurance and are in addition to any express or implied indemnity or contribution rights available
to any of the Indemnitees at law or in equity.

(e) All Work covered by this Agreement done at the site or in preparing or delivering materials or
equipment, or any or all of them, to the site shall be at the risk of Subcontractor exclusively until
the completed Work is accepted by Contractor.

(f) With respect to claims against any person or entity indemnified in Paragraph 7(a) above, asserted
by an employee of Subcontractor, by an employee of one of Subcontractors subcontractors, by an
employee of anyone directly or indirectly employed by them, or by an employee of anyone for
whose acts they may be liable, the indemnity obligations under Paragraph 7(a) shall not be limited
by any limitation on the amount or type of damages, compensation, or benefits payable by or for
Subcontractor or Subcontractors subcontractors under workers compensation acts, disability
acts, or other employee benefit acts.

(g) All indemnity obligations under this Subcontract shall apply to claims arising both before and after
completion of the Work under this Agreement and to claims arising both before and after the
termination of this Agreement.

(h) The indemnity obligations set forth in this or in any other provision of this Agreement shall not be
construed to negate, abridge, or reduce any other rights of indemnity accorded by law or equity to
the persons or entities indemnified.

Page 10 of 21
SUBCONTRACT AGREEMENT
CALIFORNIA FORM

(i) Contractor shall be entitled to recovery of its attorneys fees and costs associated with enforcing
any indemnity and duty to defend set forth in this Agreement.

8. INSURANCE

(a) Subcontractor shall, at its own expense, procure not less than the insurance coverages and limits of
insurance as specified within the Insurance Attachment, which is attached to the Subcontract Agreement
and is an integral part of this Agreement. Such insurance shall be maintained with insurers, policy forms
and deductibles satisfactory to Contractor and the Owner. Such insurance shall not contain any
exclusion(s) that apply to the type of work performed by Subcontractor under this agreement, or to the
cause of resultant damage arising out of work performed by Subcontractor. If Subcontractor uses existing
coverage to comply with these requirements and that coverage does not meet the requirements set forth
within the Insurance Attachment, Subcontractor agrees to amend, supplement or endorse the existing
coverage to do so, at no additional cost to Contractor.

(b) Subcontractor will also carry any other insurance specified in the Contract Documents for protection of
Owner, Contractor and Subcontractor, and will keep all policies and endorsements in force as long as
may be necessary to protect any of the above. Any acceptance of insurance certificates or endorsements
by Contractor shall in no way limit or relieve the Subcontractor of its duties and the responsibilities
assumed by him in this Agreement.

(c) At minimum, Subcontractor shall carry Workers Compensation, General Liability and Automobile
Insurances. Such General Liability coverage shall be endorsed to add the Owner and Contractor as
additional insureds on the Subcontractors policy for liabilities arising out of Subcontractors work. The
limits, scope of coverage and additional insurance requirements of the Subcontractor are more fully
outlined in the Insurance Attachment.

(i) Subcontractor shall disclose all SIRs (Self Insured Retentions) on any insurance policy to
Contractor prior to the award of the subcontract. Contractor reserves the right to reject any SIR
or require a financial guarantee of the SIR amount. Upon notification by Contractor,
Subcontractor shall immediately be responsible for all defense and indemnity obligations to
Contractor within the SIR.

(d) On execution of the Subcontract and prior to commencement of work, Subcontractor shall file on forms
acceptable to Contractor a certificate of insurance and additional insured endorsement properly executed
and signed by an authorized representative on behalf of the insurer(s) evidencing the above coverages and
conditions as specified in the Insurance Attachment. Subcontractor shall maintain the required insurance
and additional insureds for the period of time for which the Subcontractor may be held legally liable for
its work. Also, the required certificates of insurance and additional insured endorsements shall be
provided and maintained by the Subcontractor during the warranty period of Subcontractors work.
Subcontractor further agrees, upon written request by Contractor or Owner, to furnish copies of any
insurance policies, certified by an authorized representative of the insurer(s).

(e) Subcontractor shall be responsible for payment of the deductible for any Builders Risk/Course of
Construction Insurance (Builders Risk) claim regardless of whether such coverage is procured by the
Owner, Contractor or Subcontractor. Subcontractor shall be responsible for payment of the deductible in
proportion to its percentage of responsibility of the entire loss (covered under the Builders Risk Policy),
as calculated prior to the application of the policy deductible.

(f) Contractor may, at its own option, insure either the General Liability and Excess, or the General Liability,
Excess and Workers Compensation coverages by the Contractors Project Wrap Up Insurance Program.
If the Project is under a Contractors Project Wrap Up Insurance Program, then Subcontractor shall be
responsible for payment of the deductible for any Workers Compensation and/or General Liability claim
arising from its work under the Contractors Project Wrap Up Insurance Program in accordance with the

Page 11 of 21
SUBCONTRACT AGREEMENT
CALIFORNIA FORM

Project Specific Insurance Manual issued for the Project. Subcontractor shall be responsible for payment
of the deductible in proportion to its percentage of responsibility of the entire loss (covered under the
Contractors wrap-up insurance program), as calculated prior to the application of the deductible.

9. BONDS

If surety performance and/or payment bonds (Bonds) are required on a Project, then:

(a) Any indemnities or bonds provided in the Contract Documents are hereby assumed by the Subcontractor
to the extent of its work and it hereby agrees to furnish, concurrently with the execution hereof, a
performance bond in an amount equal to full Subcontract Sum and a payment bond in an amount equal to
full Subcontract Sum with a corporate Surety or Sureties listed in the most current United States
Department of the Treasury-Federal Register. Bonds shall contain terms and be in a form satisfactory to
Contractor and Owner conditioned upon faithful performance by him of each and all of the provisions
hereof. Contractor reserves the right to require performance and payment bonds on any subcontract even
though not required by the Contract Documents. If Subcontractor fails to provide the bonds specified
herein within three (3) days after demand by Contractor, Contractor shall have the immediate right to (1)
terminate this Agreement pursuant to Subcontractors default and recover all costs and damages arising
out of such breach, including but not limited to the difference in cost of replacement contractor, and
Subcontractor shall have no right to payment for any work performed prior to such termination, or (2)
Contractor can secure such bonds for subcontractor and backcharge subcontractor for the cost of same.

(b) If change order work results in an increase in the Subcontract Sum, Subcontractor shall provide bond
riders evidencing that the penal sum of the bonds has been increased to equal the adjusted Subcontract
Sum. The cost of such increase in bond coverage shall be at Subcontractors expense and included in said
change orders.

10. SAFETY

(a) Subcontractor shall comply fully with all laws, orders, citations, rules, regulations, standards and statutes
with respect to occupational health and safety, the handling and storage of hazardous materials, accident
prevention, safety equipment and practices including the accident prevention and safety program of
Owner and Contractor. Subcontractor shall conduct inspections to determine that safe working conditions
and equipment exist and accepts sole responsibility for providing a safe place to work for its employees
and for employees of its subcontractors and suppliers of material and equipment, for adequacy of and
required use of all safety equipment and for full compliance with the aforesaid laws, orders, citations,
rules, standards and statutes.

(b) Subcontractor will furnish Contractor with copies of all accident reports, promptly reporting any accident
or injury to any of the employees, agents or servants of Subcontractor used or utilized on this project.

(c) Subcontractor shall furnish Contractor with current Material Safety Data Sheets for hazardous materials
prior to delivery of any hazardous materials to the job site. The Subcontractor shall inform the Contractor
of any precautionary measures to be taken to protect employees.

(d) Subcontractor agrees that it is Subcontractors sole responsibility to employ labor in accordance with all
applicable safety codes, including but not limited to State and Federal Safety Codes, and under conditions
satisfactory to Contractor.

11. CLEAN-UP

At all times during the course of performing the work under this Subcontract, Subcontractor shall perform its
work, including any necessary clean-up, so as to maintain the Project site in a clean, safe and orderly
condition. Upon completion of the work under this Subcontract, Subcontractor shall (a) clean all surfaces,

Page 12 of 21
SUBCONTRACT AGREEMENT
CALIFORNIA FORM

fixtures, equipment and other items which are a part of the work under this Subcontract or may have been
soiled by such work, and (b) remove from the job site and legally dispose of all temporary structures, debris,
waste, and other items incidental to Subcontractors operations, including all hazardous materials, which do
not constitute a permanent part of the Project. Subcontractor shall follow all directions of Contractor in regard
to clean-up both during the course of the work and at the completion of Subcontractors work. Contractor
shall be entitled to backcharge Subcontractor for the costs of clean up if Subcontractor fails to clean up its
work within two (2) working days after demand by Contractor.

12. PROTECTION OF WORK

(a) Subcontractor shall secure and reasonably protect the work done hereunder and assume responsibility for
the condition thereof until final acceptance by Architect, Owner and Contractor. Subcontractor further
agrees to provide such reasonable protection as is necessary to protect the work and the workers of
Contractor, Owner and other subcontractors from its operations.

(b) Subcontractor shall be liable for any loss or damage to its work in place or its materials on the job site.
Subcontractor shall also be liable for loss or damage to work in place or damage to equipment and/or
materials on the job site caused by Subcontractor or its agents, employees or guests.

13. USE OF CONTRACTORS EQUIPMENT

In the event Subcontractor shall use Contractors equipment, materials, labor, supplies or facilities,
Subcontractor shall reimburse Contractor at a predetermined rate. Further, Subcontractor assumes liabilities
connected therewith and responsibility for physical damage to such equipment, materials, labor, supplies, or
facilities used by Subcontractor or its agents, employees, or permittees. In the event that Contractors
employees are used by Subcontractor, Subcontractor shall have full responsibility for all acts or omissions of
Contractors employees with regard to Subcontractors use or employment of them. Subcontractor accepts
any and all of Contractors equipment, materials, labor, supplies or facilities as furnished. The use by
Subcontractor of Contractors equipment or employees must be approved by Contractor.

14. CLAIMS FOR ADDITIONAL COMPENSATION AND DELAY

A Claim is a written demand or assertion by Subcontractor seeking an adjustment of the Subcontracts terms,
payment of money, delay, extension of time or other relief with respect to the Subcontract. As a condition to
bringing any Claim against Contractor, Subcontractor must comply first with all timely notice requirements
set forth in the Subcontract Documents. Subcontractor shall timely submit any Claim to Contractor within
three (3) working days after the occurrence of the event giving rise to the Claim (or two (2) working days
prior to the time within which Contractor must submit a pass-through request to the Owner pursuant to the
terms of the Prime Contract Documents, whichever is earlier). Claims affecting either the Contract Sum or
Schedule must be in writing, and contain sufficient narrative detail and supporting documentation justifying
all claimed costs and delays. All Claims shall be dated, signed and certified (if required by the Prime
Contract Documents) by an officer or duly authorized representative of Subcontractor. Any Claim not
timely submitted shall be deemed waived and forever released by Subcontractor.

Notwithstanding any other provision of this Subcontract, to the maximum extent allowed by applicable law,
Contractor will be liable to Subcontractor on any Claim only if and to the extent Owner is liable to Contractor
for the adjustment sought in such Claim. It is expressly understood that the only obligation Contractor has to
Subcontractor under this provision is to pass on to Owner any Claim, and to pay to Subcontractor any
amounts which Owner pays to Contractor as a result of such Claim. Subcontractor will reimburse Contractor
for all costs and expenses, including attorneys and consultants fees and costs, incurred in connection with
presenting any such Claim to Owner.

Unless otherwise agreed in writing, Subcontractor shall continue to prosecute Subcontractors Work and
maintain the Project Schedule pending resolution of any Claim. Any failure of Subcontractor to continue

Page 13 of 21
SUBCONTRACT AGREEMENT
CALIFORNIA FORM

diligent and timely prosecution of Subcontractors Work shall be deemed a material breach of the
Subcontract, entitling Contractor to all remedies provided hereunder, as well as other remedies which may
exist as a matter of law.

15. DISPUTES AND DISPUTE RESOLUTION

(a) Dispute. A Dispute shall arise when Contractor denies or otherwise challenges a timely Claim brought
by Subcontractor or the Parties have another form of disagreement arising from the Subcontract
Documents (collectively Dispute). A Dispute shall also include any Claim by Subcontractor that
Contractor believes, in its discretion, involves, in whole or in part, disputes or claims between the
Contractor and a third-party, including without limitation the Owner.

(b) Work Continuation and Payment. Subcontractor shall not delay or postpone any Work pending
resolution of any Dispute except as the Contractor and Subcontractor may otherwise agree in writing.
Pending final resolution of a Dispute, including exhaustion of all applicable dispute resolution
procedures, Subcontractor shall proceed diligently with the performance of the Subcontract Work,
including any disputed work, and based on such performance, Contractor shall continue to make
payments for undisputed Work in accordance with the Subcontract Documents.

(c) Disputes under the Prime Contract. If any Dispute between Subcontractor and Contractor arising out
of or relating to this Subcontract (Subcontract Dispute) pertains in any way to a claim, dispute, or
matter in question between Contractor and Owner arising out of or relating to the Prime Contract
(Related Prime Contract Dispute), then this Subcontract Dispute will be decided using the same
procedures, forum, and process utilized for the Related Prime Contract Dispute, and the laws governing
the resolution of Prime Contract disputes, regardless of whether Subcontractor formally joins the process
as a litigant or named party. Any and all claims of the Subcontractor related to a Related Prime Contract
Dispute shall be handled in this manner. Subcontractor agrees to: (i) cooperate with Contractor, (ii) assist
in the discovery and other preparations for the hearing, (iii) make its employees available for testimony
before and after the hearing, (iv) share proportionately the legal fees and costs associated with the
preparation for and execution of the hearing to the extent mutually agreed upon related to the amount of
damage being pursued by the Contractor on Subcontractors behalf, and (v) stay any action filed by the
Subcontractor against Contractor as long as the Subcontractors position is being diligently pursued by
the Contractor in the hearing where the Related Prime Contract Dispute is being heard, and until all such
appeals pertaining to the Related Prime Contract Dispute are exhausted. Subcontractor will be bound by
the results of the dispute resolution procedure controlling the Related Prime Contract Dispute as it relates
to Subcontractor, and such results shall be final. Nothing in this Subcontract shall allow Subcontractor to
be a named party in a dispute forum being utilized by Contractor and Owner where that Subcontractor has
no legal standing to litigate its disputes before that forum.

(d) Subcontractor Cooperation. In the event it is not possible to join a Related Prime Contract Dispute to
the dispute resolution procedures between Owner and Contractor as provided in Paragraph 15(c) above,
Subcontractor agrees to enter into a liquidating agreement with Contractor and to cooperate fully with
Contractor and to furnish all documents, statements, witnesses and other information required by
Contractor for prosecution or defense of Subcontractors Claim by Contractor. Subcontractor shall pay or
reimburse Contractor for all expenses and costs, including reasonable attorneysand consultants fees and
costs, incurred in connection therewith to the extent of Subcontractors interest in such Claim or dispute.
Subject to compliance with all applicable laws, codes and regulations, including but not limited to those
relating to false claims, dispute and claim certifications, and cost and pricing data requirements,
Contractors sole obligation with respect to Subcontractors Claims is to act as a conduit in presenting
any timely-filed Claims by Subcontractor to Owner under the dispute resolution procedures of the Prime
Contract and, subject to the other provisions of this Agreement, to pay to Subcontractor the proportionate
part of any sums actually paid by the Owner to which Subcontractor is entitled. Subcontractor further
agrees to stay any action filed by the Subcontractor against Contractor as long as the Subcontractors
position is being diligently pursued by the Contractor pursuant to the liquidating agreement contemplated

Page 14 of 21
SUBCONTRACT AGREEMENT
CALIFORNIA FORM

above in this Paragraph 15(d), and until all Contractor has fully exhausted all remedies pursuant to that
liquidating agreement, including obtaining a judgment, arbitration award or appellate decision.

(e) Disputes between Contractor and Subcontractor. In the event that either (i) the provisions for
resolution of Disputes between Contractor and Owner contained in the Prime Contract Documents do not
permit joinder with disputes of third parties, such as Subcontractor, and Contractor elects not to enter into
a liquidating agreement with Subcontractor, or (ii) if such Dispute is only between Contractor and
Subcontractor, then the Parties shall submit the Disputes to the dispute resolution procedure set forth in
Paragraphs 15(f) through 15(i) below. Contractor reserves the right to seek consolidation of any
mediation, lawsuit or arbitration arising under this Agreement with any mediation, lawsuit or arbitration
relating to disputes between Contractor and Owner.

(f) Mediation between Contractor and Subcontractor. The Parties shall endeavor to resolve their
Disputes through mediation. Any such mediation proceedings shall be under the auspices of and
governed by the rules of the Prime Contract Documents. If the Prime Contract Documents do not provide
rules for mediation, the mediation shall be governed by the Construction Industry Mediation Rules of the
American Arbitration Association or the Parties may mutually agree to select another set of mediation
rules. In such event, neither Party shall proceed with arbitration or litigation until the completion of the
mediation process. The costs of the mediator shall be shared equally by the Parties.

(i) A request for mediation shall be filed in writing with the other Party to this Agreement. The
request may be made concurrently with the filing of a demand for arbitration or litigation but, in
such event, mediation shall proceed in advance of arbitration or legal or equitable proceedings,
which shall be stayed pending mediation for a period of 60 days from the date of filing, unless
stayed for a longer period by agreement of the Parties or court order.

(ii) The mediation shall be held in the city or county where the Project is located, unless another
location is mutually agreed upon. Agreements reached in mediation shall be enforceable as
settlement agreements in any court having jurisdiction thereof.

(g) Binding Arbitration for Disputes Less than $1,000,000. Unless otherwise agreed to in writing, for
Disputes that are not governed by Paragraph 15(c) above, Parties agree to resolve such Disputes where
the total principal amount in controversy is less than $1,000,000 (exclusive of claimed attorneys fees,
interest or costs) by binding arbitration as follows:

(i) Arbitration shall be conducted using the Construction Industry Arbitration Rules of the American
Arbitration Association in effect at the time of initiation or the Parties may mutually agree to
select another set of arbitration rules. The administration of the arbitration shall be as mutually
agreed by the Parties

(ii) It is the intention of the Parties that any dispute arising under this Agreement may be
consolidated with arbitration or mediation proceedings arising under the Prime Contract
Documents or other agreements relating to the same transaction or series of transactions relating
the Work or the Project for which this Agreement was entered provided that the agreement
governing the other arbitration or mediation (1) permits consolidation; and (2) the to be
consolidated substantially involve common issues of law or fact creating the possibility of
conflicting rulings.

(iii) It is the intention of the Parties that in any Dispute arising under this Agreement either Party may
include by joinder persons or entities who are parties to agreements relating to the same
transaction or series of transactions relating the Work or the Project for which this Agreement
was entered, whose presence is required if complete relief is to be accorded and to prevent the
possibility of conflicting rulings on a common issue of law or fact and otherwise to prevent risk
of the Parties being subjected to inconsistent obligations or decisions.

Page 15 of 21
SUBCONTRACT AGREEMENT
CALIFORNIA FORM

(iv) Similarly, Subcontractor agrees to be joined in any arbitration or mediation between the
Contractor and any person or entity with whom the Contractor has an agreement to arbitrate or
mediate that relates to the same transaction or series of transactions relating the Subcontract
Work or the Project for which this Agreement was entered, including, but not limited to, the
Prime Contract, when Subcontractors presence is required if complete relief is to be accorded
and to prevent the possibility of conflicting rulings on a common issue of law or fact and
otherwise to prevent risk of the Parties being subjected to inconsistent obligations or decisions.

(v) If a party fails or refuses to appear or participate in the arbitration, or in any portion of the
arbitration, after having been given notice and opportunity to participate by failing to participate
in arbitrator selection, failing to pay arbitrator costs or fees, failing to respond to the arbitration
demand, failing to provide the arbitrator with papers or information demanded, or failing to
appear at hearings, as provided in this Agreement, the arbitration will proceed and the arbitrator
may render a final award on the basis of the evidence presented by the participating party. An
award rendered under such circumstances is valid and enforceable as if all parties had
participated fully.

(h) Litigation for Disputes $1,000,000 or more / WAIVER OF JURY TRIAL. Unless otherwise agreed
to in writing, for disputes that are not governed by Paragraphs 15(c) above, Parties agree to resolve such
disputes where the principal amount in controversy is $1,000,000 or more (exclusive of claimed
attorneys fees, interest or costs) in either the state or federal court having jurisdiction of the matter in the
location of the Project. PARTIES WAIVE THE RIGHT TO A JURY TRIAL, AND AGREE THAT
THEIR DISPUTE WILL BE DETERMINED BY A JUDGE. THE PARTIES SPECIFICALLY
AGREE AND ACKNOWLEDGE THAT THE NATURE AND COMPLEXITY OF
CONSTRUCTION DISPUTES IS SUCH THAT MATTERS ARE BETTER AND MORE
EFFICIENTLY DECIDED BY A JUDGE RATHER THAN A JURY.

(i) Joinder of Other Parties. Subcontractor shall include in each of its contracts with its sub-subcontractors
and suppliers a specific provision whereby the necessary party agrees to be joined or consolidated with
any dispute procedure between Contractor and Subcontractor. Further, the Contractor and Subcontractor
grant to any person or entity made a party to and conducted under this Section, whether by joinder or
consolidation, the same rights of joinder and consolidation as the Contractor and Subcontractor under this
Agreement.

16. CONTRACTORS REMEDIES

(a) If Subcontractor or any of Subcontractors subcontractors, suppliers, materialmen or laborers at any time
commit any of the acts or omissions below in connection with any part of this Agreement, or otherwise, it
shall constitute an event of Default under this Agreement:

(i) refuse or neglect to supply a sufficient number of properly qualified workers or a sufficient
quantity of materials of proper quality;

(ii) abandon Subcontractors work or fail in any respect to promptly and diligently prosecute
Subcontractors work;

(iii) fail to promptly pay subcontractors, suppliers, materialmen, rental companies or laborers;

(iv) fail to accelerate Subcontractors work as required by Paragraph 3 hereof;

(v) give Contractor a reasonable basis to doubt that Subcontractors work can be completed for the
unpaid portion of the Subcontract Sum or within the required time;

Page 16 of 21
SUBCONTRACT AGREEMENT
CALIFORNIA FORM

(vi) declare bankruptcy or make a general assignment for the benefit of creditors or files for
bankruptcy, assigns assets for the benefit of creditors, becomes insolvent or be unable to pay its
obligations as they mature;

(vii) otherwise fail to perform any of the terms, conditions, agreements and obligations set forth in the
Subcontract Documents; or

(viii) a default in the performance of any contract or agreement with Contractor, whether related to the
Project, or otherwise, shall constitute a Subcontractor default under this Agreement.

(b) In the event of a Default, Contractor may pursue any remedies available by common law or statute,
including but not limited to one or more of the following:

(i) withhold any sums due or thereafter to become due to Subcontractor under the Subcontract and
any other contract, whether related to the Project or otherwise and during such period such
withheld amounts shall not accrue interest;

(ii) provide and/or supplement any labor and materials as Contractor shall determine to cure such
default and deduct the cost thereof from any money then due or thereafter to become due to
Subcontractor under the Subcontract or any other contract, agreement, or otherwise;

(iii) upon the appointment of a receiver for Subcontractor or upon Subcontractor making an
assignment for the benefit of creditors or if Subcontractor seeks protection under the Bankruptcy
Code or commits any other act of insolvency, Contractor may terminate this Agreement upon
giving forty-eight (48) hours written notice, by certified mail, to Subcontractor and its surety, if
any. If an order for relief is entered under the Bankruptcy Code with respect to Subcontractor,
Contractor may terminate this subcontract by giving forty-eight (48) hours written notice, by
certified mail, to Subcontractor, its trustee, and its surety, if any, unless Subcontractor, the surety,
or the trustee:

(a) promptly cures all defaults;


(b) provides adequate assurance of future performance;
(c) compensates Contractor for actual pecuniary loss resulting from such defaults; and
(d) assumes the obligations of Subcontractor within the statutory time limits.

(iv) terminate the Subcontract for default, in which case Subcontractor assigns, conveys and transfers
to Contractor all rights, title and interests in the following: (1) all contracts, whether written or
oral, between Subcontractor and persons or entities providing labor, material or equipment
pertaining to the Subcontract Work, and (2) all equipment, tools, materials or personal property
of any kind located on a Project site at the time of termination. Upon the effective date of
termination, Subcontractor shall be deemed to irrevocably constitute, appoint and designate
Contractor as its attorney-in-fact with the right, but not the obligation, to exercise all rights of
Subcontractor assigned or granted to Contractor, and to execute and deliver any other
assignments, documents, instruments or agreements deemed necessary by Contractor to exercise
its rights under this Agreement in the name of Subcontractor.

(v) take possession of all the materials, tools, equipment and appliances belonging to Subcontractor
at the Project site without any further compensation to Subcontractor, and either complete
Subcontractors work or contract with any other person or persons to complete Subcontractor
work and provide the material therefore; in which case if the unpaid portion of the amount to be
paid under the Subcontract exceeds the charges, expenses and damages sustained by Contractor
in completing the work or as a result of such defaults, such excess shall be paid by Contractor to
Subcontractor, but if such charges, expenses, and damages exceed said unpaid portion,
Subcontractor shall pay the difference to Contractor immediately upon demand; or

Page 17 of 21
SUBCONTRACT AGREEMENT
CALIFORNIA FORM

(vi) offset and apply any amounts due Contractor as a result of such default against any earned but
unpaid amounts owing to Subcontractor by Contractor under the Subcontract, including without
limitation, any retainage held by Contractor, any amounts owed to Subcontractor under any other
contract, whether related to the Project or otherwise.

Prior to exercising the remedies in this Paragraph 16(b), Contractor shall provide Subcontractor written
notice of default with not less than two (2) working days to cure such default (unless the time to cure any
default is less than two days in the Prime Contract, at which time the Prime Contract requirements will
control). Subcontractor shall have the opportunity to remedy, to Contractors satisfaction, the default,
deficiency or failures which are the basis of Contractors termination notice within the two (2) working
days notice period.

Contractors remedies are cumulative, and the exercise of one remedy shall not restrict Contractor, at the
same time or thereafter, from exercising any other remedy set forth in this Agreement, or any right or
remedy provided by equity or applicable law. Unless prohibited by Law, Contractor may set-off against
the Subcontract Price the amounts owing from Subcontractor to Contractor, whether or not relating to the
project.

In the event a termination for default issued pursuant to Paragraph 16(b) of this Subcontract is found not
to have been warranted under this Subcontract, the total compensation and damages that Subcontractor is
entitled to recover on account of such termination shall be limited to the compensation that would have
been payable to Subcontractor under the provisions of this Subcontract as if the Subcontract had been
terminated for Contractors convenience pursuant to subparagraph (c) of this Paragraph 16 at the time
Contractor terminated Subcontractor for default.

(c) Termination for Contractors Convenience. Contractor may at any time and for any reason, or for no
reason, terminate any part of Subcontractors services and work for Contractors convenience. Such
termination shall be by written notice to Subcontractor at Subcontractors place of business.

Upon receipt of such notice, Subcontractor shall, unless the notice directs otherwise, immediately
discontinue the work and the placing of orders for materials, equipment and supplies in connection with
the performance of this Subcontract, and shall, if requested, make every reasonable effort to procure
cancellation of all existing orders or contracts upon terms satisfactory to Contractor, or at the option of
Contractor, give Contractor the right to assume those obligations directly, including all benefits to be
derived therefrom. Subcontractor shall thereafter do only such work as may be necessary to preserve and
protect the work already in progress and to protect material and equipment on the Project site or in transit
thereto.

Upon such termination, Subcontractor shall be entitled to payment of the following amounts, which shall
constitute full and final satisfaction of all Subcontract Work and claims by Subcontractor for payment on
account for work performed under this Subcontract: (1) payment for that portion of Subcontractors work
actually completed and materials actually delivered and accepted by Owner and Contractor, and only as
to that portion of the Subcontract Price as allocated in the schedule of values for that portion of the Work
performed, inclusive of profit, overhead, and general conditions allocated in the schedule of values for the
Work completed, plus (2) such other costs actually incurred by Subcontractor as are payable to
Contractor under the Prime Contract and approved by Owner; less (3) any amounts due Contractor, less
(4) the amount of any payments made to Subcontractor prior to the date of termination. Subcontractor
will not be entitled to any claim or lien against Contractor or Owner for any additional compensation or
damages in the event of such termination and payment, and Subcontractor waives any such claims,
including loss of anticipated profit. The provisions of this Subcontract, which expressly, or by their
nature, survive final acceptance of the Work, will remain in full force and effect after any termination
pursuant to this Section 16(c).

Page 18 of 21
SUBCONTRACT AGREEMENT
CALIFORNIA FORM

(d) Termination Right Under the Prime Contract. Contractor may also terminate this Subcontract or suspend
the Subcontract Work for the same reasons Owner may terminate or suspend Contractor under the
Contract Documents. If the Prime Contract is terminated for the convenience of Owner, the termination
settlement under this Subcontract shall be as provided in the Prime Contract. Subcontractor shall not be
entitled to receive any greater amount than Contractor may on behalf of Subcontractor recover from
Owner for such termination. Subcontractor shall cooperate by timely providing a proper termination for
convenience cost proposal, if requested by the Contractor.

(e) If this Subcontract, in whole or in part, is terminated for any reason, Subcontractors warranties,
guarantees and indemnities with respect to the Subcontract Work performed through the termination date
will survive the termination and be in full force and effect for the time period prescribed by the
Subcontract Documents or Law, whichever is longer. Subcontractor will, prior to final payment, provide
all warranties and guarantees required by the Subcontract Documents with respect to the Subcontract
Work.

17. LABOR RELATIONS AND SUBCONTRACTOR EMPLOYEES

(a) Subcontractor shall comply with all of the provisions of any collective bargaining agreements executed
by or on behalf of Contractor. Contractor shall have no liability to Subcontractor for any costs, expenses
or liability resulting from any stoppage of work, however caused, arising out of a labor dispute or
controversy. Subcontractor shall be liable for any and all costs, including but not limited to
compensatory and liquidated damages, resulting from work stoppages or other labor disputes associated
with Subcontractor, Subcontractors employees or the subcontractor(s) or suppliers of Subcontractor.
Should there be picketing on Contractors job site and Contractor establishes a reserved gate, it shall be
the obligation of Subcontractor to continue the proper performance of Subcontractors work without
interruption or delay.

(b) Subcontractor shall employ only competent, well-disciplined workers to perform the Work hereunder and
Subcontractor agrees to immediately remove and replace any employee(s), including Subcontractors
superintendent, whom Contractor, Owner or Architect deems unsatisfactory.

(c) Subcontractor shall comply with all Laws pertaining to unemployment compensation, workers
compensation, Social Security and employment, including but not limited to, all Laws pertaining to
immigration and prevailing wages. Contractor will not in any way be liable as an employer of, or on
account of, any of the employees of Subcontractor.

18. MISCELLANEOUS PROVISIONS

(a) ARCHITECT

The term Architect" or Architect/Engineer as used herein includes anyone appointed to be the
Owners designated representative to supervise on its behalf the work of the Contractor, or as otherwise
set forth in the Prime Contract.

(b) TAXES

The compensation payable to Subcontractor as herein provided includes all sales, gross receipts, excise
and other taxes and is not subject to any addition on account of taxes which are now or may hereafter be
levied. It is hereby agreed that Subcontractor is an independent contractor within the purview of the
Internal Revenue Code, the Federal Social Security Act, and any and all unemployment insurance laws,
both State and Federal, and is solely responsible to the Federal and State Government for all payroll
taxes, deductions, and contributions under such laws.

Page 19 of 21
SUBCONTRACT AGREEMENT
CALIFORNIA FORM

(c) ASSIGNMENT

Any assignment, subletting or delegation, by operation of law or otherwise, in whole or in part, by


Subcontractor of this Agreement, of the work to be performed or of any claims arising hereunder without
the prior written consent of Contractor shall be void. Contractor shall have the right in its sole discretion
to assign its rights and obligations under this Agreement, as well as any claims arising hereunder, as
allowable under the applicable law.

Contractor shall not recognize or be bound by any assignment of any right to payment earned or to be
earned by performance hereunder by Subcontractor unless and until Contractor shall receive written
notice which reasonably proves the assignment and identifies the rights assigned. Any assignment
hereunder shall be subject to, and Contractor reserves, all rights and remedies possessed by or available to
Contractor by law or under this agreement as against Subcontractor, its sureties and assigns including,
without limitation, rights of set-off, to retain moneys, to amend or modify this agreement, and to assert all
other defenses and claims whether or not arising under this agreement.

The making of any assignment by Subcontractor or any consent thereto by Contractor shall in no event
relieve Subcontractor or its sureties hereunder of any of their obligations, duties, responsibilities or
liabilities.

(d) FAIR EMPLOYMENT

The Subcontractor agrees to be bound by and comply with all applicable Fair Employment Practices,
Provisions and Regulations of Federal, State or other Governmental authority having jurisdiction
including the provisions of Executive Order No. 11246, and Title VII of the Civil Rights Act of 1964,
including amendments or revisions thereof, relating to nondiscrimination in employment, and any
affirmative action provisions (including MBE or WBE requirements) contained in the Contract
Documents or required by applicable law.

(e) ENTIRE AGREEMENT

The Subcontract Documents represent the entire agreement between the parties and supersede any
previous document including but not limited to Subcontractor qualifications, exclusions or other bid
documents that the Subcontractor may have submitted to Contractor as well as any other prior
representation, statement or agreement, oral or written, with regard to the subject matter herein. No
modification hereto shall be valid unless it is in writing and signed by both parties, except for
Contractors unilateral change orders as set forth in Paragraph 5 of this Agreement.

(f) WAIVER

Waiver by Contractor of any particular default by Subcontractor shall not affect or impair Contractors
rights in respect to any subsequent default of the same or of a different nature.

(g) NOTICES

All notices provided hereunder shall be in writing and mailed to the other party at the address stated on
the Subcontract Agreement.

(h) CONTRACTORS LICENSE

Subcontractor is required by law to be licensed and regulated by the Contractors State License Board.
Subcontractor now possesses and shall at all times possess for the entire life of this Agreement all
licenses required to lawfully perform the Subcontract Work. Any questions concerning a contractor may

Page 20 of 21
SUBCONTRACT AGREEMENT
CALIFORNIA FORM

be referred to the Registrar, Contractors State License Board, 9821 Business Park Drive, Sacramento,
California 95827. Mailing Address: P.O. Box 26000, Sacramento, California 95826.

(i) SEVERABILITY

If any term of provision of this Agreement including, but not limited to provisions relating to
Subcontractors obligations under Section 7, Indemnification and Section 15, Dispute Resolution, or the
application thereof to any person or circumstances shall, to any extent, be invalid or unenforceable, the
remainder of the Agreement or the application of such term or provision to persons or circumstances
other than those as to which it is held invalid or unenforceable, shall not be affected thereby, and each
term and provision of this Subcontract shall be valid and be enforced to the fullest extent permitted by
law.

(j) GOVERNING LAW AND VENUE

This Agreement shall be construed and enforced in accordance with the laws of the State of California,
and venue for any legal action shall be in California.

(k) CONSTRUCTION OF AGREEMENT

This Agreement shall not be construed as though drafted by either Party, and the Parties specifically
covenant that the rule of contra proferentum, or construction of an agreement against its drafter, shall be
inapplicable in the interpretation of this Agreement.

(l) COUNTERPARTS AND ELECTRONIC SIGNATURES

(i) If any Subcontract Document or any document identified in the Subcontract Documents must
be signed by either Party, the signature of that party sent by facsimile will be considered
binding and may be relied upon by both Parties.

(ii) Contractor may establish a procedure by which any one or more of the Subcontract
Documents or any document issued under, pursuant to or in connection with the Subcontract
Documents may be signed by one or both Parties using an electronic signature methodology
designated by Contractor in its sole discretion. In such event, upon written notice to
Subcontractor, Contractor may require that such documents be executed using such electronic
signature methodology and Subcontractors and Contractors use of such electronic signature
methodology will be considered as binding as an ink or facsimile signature by Subcontractor
or Contractor and may be relied upon by both Parties.

Accepted, upon the Terms and Conditions stated herein.

PROJECT NAME: PROJECT

SUBCONTRACTOR CONCRETE SERVICES

By: By:

Name, Title Name, Title Shawn Barnes, Operations Manager

Subcontractor License No: Concrete Services License No: 801786

Page 21 of 21