Triangulation Unit III
Triangulation Unit III
Triangulation Unit III
Triangulation
Triangulation or precise traversing is used for horizontal
Triangulation
control in Geodetic survey.
In triangulation, system consists of a number of inter
connected triangles in which the length of only one line,
called base line and angle of triangles are measured very
Unit-3 precisely.
By knowing the length of one side and the three angles,
Surveying-II lengths of other two sides of each triangle can be computed.
The apexes of the triangles are known as triangulation
(5CE04) stations and whole figure is called as triangulation system or
figure.
Prof. P. V. Khandve But it tends to accumulate error of length and azimuth.
B.E.Civil, M.Tech.(Env.Engg.)(Hons.), To control this accumulation of errors, subsidiary bases are
D.B.M., D.I.D., D.I.T., D.I.J., B.A.Soc. also selected.
M.I.E., M.I.S.T.E., M.I.S.E.T, M.I.S.C.A., M.I.W.W.A., M.I.S.E.F.
At certain stations, astronomical observations for azimuth
and longitude are also made. These stations are called as
Laplace Stations.
Trangulation by PVK 2
1
03/08/2016
2
03/08/2016
It is used for narrow strip of terrain It is used for Wide strip of terrain
It is not so accurate for primary work since It is not so accurate for primary work since
numberb off conditions
diti tto be
b ffulfilled
lfill d iin th
the fifigure number of conditions to be fulfilled in the figure
adjustment is relatively small adjustment is relatively small
It is rapid and economical system It is rapid and economical system
To avoid excessive error, frequent setting of To avoid excessive error, frequent setting of
base line is necessary base line is necessary
Solution of triangle through the figure by two Solution of triangle through the figure by two
independent routes is not possible. independent routes is possible.
Trangulation by PVK 13 Trangulation by PVK 14
It is used for cover flat topography country It is Best figure for precise triangulation
It is accurate for secondary system since number of It is most accurate for primary system since
conditions to be fulfilled in the figure adjustment is
relatively more number of conditions to be fulfilled in the
It is not rapid and economical system figure adjustment through many
To avoid excessive error, system provides desired combinations
checks on computations.
Central figures like pentagon, hexagon
It is not rapid and economical system
quadrilaterals are used in this system. quadrilaterals are used in this system.
Trangulation by PVK 15 Trangulation by PVK 16
3
03/08/2016
4
03/08/2016
D2
h= (1 2m)
2R
Trangulation by PVK 25 Trangulation by PVK 26
Problems Towers
The altitude of two Structure erected over a station
proposed stations A for support of instrument and
and B 100 Km apart,
observing party
are 420m and 700 m
resp. The intervening It is provided when station, signal
obstruction situated at or both are to be elevated
C, 70 Km from A has
Inner tower for instrument
an elevation of 478m.
Ascertain if A and B are Outer tower for Observer etc
intervisible, and if Masonry / Timber / Steel
necessary find by how
much B should be 10 m / 25 m / 50 m
raised so that the line Portable / Foldable steel tower
of sight must nowhere
be less than 3 m above
the surface of ground. Trangulation by PVK 29 Trangulation by PVK 30
5
03/08/2016
6
03/08/2016
7
03/08/2016
n 1
W = weight of observation
V = probable residual error in observation
N = no. of value
8
03/08/2016
9
03/08/2016
10
03/08/2016
Problem
11
03/08/2016
Thanks!
Prof. P. V. Khandve
B.E.Civil, M.Tech.(Env.Engg.)(Hons.),
D.B.M., D.I.D., D.I.T., D.I.J., B.A.Soc.
M.I.E., M.I.S.T.E., M.I.S.E.T, M.I.S.C.A., M.I.W.W.A., M.I.A.S.
[email protected]
Trangulation by PVK 67
12