TESTING CIRCUIT:
67-R TIMER
A 9 3
U N
1 N C
KIT
U 4 O
2 10
Tm1
Tm2
PICK UP CHECKS:
Relay pick up at rated setting =
Disc complete rotation at the above setting =
Procedure:
1) Make the connection as per the circuit except timer connection.
2) Enure the110VAC to 07 & 08 terminal of the relay.
3) Go on increasing the current to the terminals 9&10 until the disc starts rotation,for rated plug setting,note down the
injected.
4)When the disc stop the rotation,slightly increase the current until the disc closes the relay contacts ,then notedown
current reading.
TIMING CHECKS:
Procedure:
1) Make the connection as per the circuit except timer connection.
2)For timing checks,first set the two times of PSM in the current injection kit.
3)Connect the kit "relay contacts".to relay terminals 03 & 04.
4) Inject the setting (Twice) current, disk rotation completes,timer will be stopped then note down the relay operated
5)Check & ensure the relay optd time with expected time.
6) Repeat the same procedure for 3 times of PSM.
1)Earth fault relay (67N) should be kept out for unnecessary relay operating.
2)Ensure kit inbuilt timer is zero position before timing checks.
3)For pickup checks :
+5 % acceptable tolerance for relay pick up.
+30% accptable tolerance for disc complete rotation.
TESTING CIRCUIT:
67-N TIMER
V
A
R 7 3 N N
I O C
A 8 4
C 9 10
A
KIT
PICK UP CHECKS:
Procedure:
1) Make the connection as per the circuit except timer connection.
2) Apply 63 V to the voltage terminals 7 & 8 of the relay .
3) Go on increasing the current to the terminals 9&10 until the relay disc pick up,then note down the current injected.
4)When the disc stop the rotation,slightly increase the current until the disc closes the contacts,then notedown the sa
current reading.
TIMING CHECKS:
Procedure:
1) Make the connection as per the circuit except timer connection.
2)For timing checks,first set the two times of PSM in the current injection kit.
3)Connect the kit "relay contacts".to relay terminals 03 & 04.
4) Inject the setting (Twice) current, disk rotation completes,timer will be stopped then note down the relay operated
5)Check & ensure the relay optd time with expected time.
6) Repeat the same procedure for 3 times of PSM.
TESTING CIRCUIT:
51-1 TIMER
A 9 3
U N
1 N C
KIT
U 4 O
2 10
Tm1
Tm2
PICK UP CHECKS:
Relay pick up at rated setting =
Disc complete rotation at the above setting =
Procedure:
1) Make the connection as per the circuit except timer connection.
2) Go on increasing the current to the terminals 9&10 until the relay disc pick up,then note down the current injected.
3)When the disc stop the rotation,slightly increase the current until the disc closes the contacts,then notedown the sa
current reading.
TIMING CHECKS:
Procedure:
1) Make the connection as per the circuit except timer connection.
2)For timing checks,first set the two times of PSM in the current injection kit.
3)Connect the kit "relay contacts".to relay terminals 03 & 04.
4) Inject the setting (Twice) current, disk rotation completes,timer will be stopped then note down the relay operated
5)Check & ensure the relay optd time with expected time.
6) Repeat the same procedure for 3 times of PSM.
TESTING CIRCUIT:
51-N TIMER
A 9 3
U N
1 N C
KIT
U 4 O
2 10
Tm1
Tm2
PICK UP CHECKS:
Procedure:
1) Make the connection as per the circuit except timer connection.
2) Go on increasing the current to the terminals 9&10 until the relay disc start up,then note down the current injected
3)When the disc stop the rotation,slightly increase the current until the disc closes the contacts,then notedown the sa
current reading.
TIMING CHECKS:
Procedure:
1) Make the connection as per the circuit except timer connection.
2)For timing checks,first set the two times of PSM in the current injection kit.
3)Connect the kit "relay contacts".to relay terminals 03 & 04.
4) Inject the setting (Twice) current, disk rotation completes,timer will be stopped then note down the relay operated
5)Check & ensure the relay optd time with expected time.
6) Repeat the same procedure for 3 times of PSM.
TESTING CIRCUIT:
51-TN TIMER
A 9 3
U N
1 N C
KIT
U 4 O
2 10
Tm1
Tm2
PICK UP CHECKS:
Procedure:
1) Make the connection as per the circuit except timer connection.
2) Go on increasing the current to the terminals 9&10 until the relay disc starts up,then note down the current injecte
3)When the disc stop the rotation,slightly increase the current until the disc closes the contacts,then notedown the sa
current reading.
TIMING CHECKS:
Procedure:
1) Make the connection as per the circuit except timer connection.
2)For timing checks,first set the two times of PSM in the current injection kit.
3)Connect the kit "relay contacts".to relay terminals 03 & 04.
4) Inject the setting (Twice) current, disk rotation completes,timer will be stopped then note down the relay operated
5)Check & ensure the relay optd time with expected time.
6) Repeat the same procedure for 3 times of PSM.
TESTING CIRCUIT:
64-R
A 9
U
1
KIT
U
2 10
PICK UP CHECKS:
Procedure:
1) Make the connection as per the circuit.
2) Go on increasing the current to the terminals 9&10 until the relay flag drops off ,note down the current injected.
3) Slowly decrease the current to terminal 9 & 10 till the flag will reset,notedown the relay reset current.
TESTING CIRCUIT:
2NO+2NC CONT
27-T
NO 3- VARIAC
9
NC P
10 NC N
NO
N
P
1- VARIAC
1-,240
PICK UP CHECKS:
v
Procedure:
1) Make the connection as per the circuit diagram.
2) Go on increasing the voltage to the terminals 9&10 until the relay disc pickup,then note down the voltage injected.
3)When the disk rotation stops ,slightly increase the voltage until the contact closed,then notedown the same voltag
3)When the disk rotation stops ,slightly increase the voltage until the contact closed,then notedown the same voltag
TIMING CHECKS:
Procedure:
1)For timing checks,first set the 75% PSM in the 1- variac.
2)Apllied the 110 volts to relay through 3- variac.
3)Simultaneously Put off the auxilary supply of contactor and put on the timer (Stop Watch) .
4)When relay disk rotation completes, stopped timer then note down the relay operated time.
5)Check & ensure the with in limits of relay optd time with expected time.
6)Next,do the same procedure for 50 % times of PSM.
TESTING CIRCUIT:
64-S
9
P
VARIAC
N 10
PICK UP CHECKS:
Relay pickup at =
Disk complete rotation at =
Procedure:
1) Make the connection as per the circuit connection.
2) Go on increasing the voltage to the terminals 9&10 until the relay disc pick up,then note down the voltage injected
3)When the disk rotation stops ,slightly increase the voltage until the contact closed,then notedown the same voltag
TIMING CHECKS:
Procedure:
1)For timing checks,first set the 2 times of PSM in the variac.
2)Simultaneously Put on the variac and put on the timer (stop watch) .
3)When relay disk rotation completes, stop the timer then note down the relay operated time.
4)Check & ensure the with in limits of relay optd time with expected time.
5)Repeat the same procedure for 3 times of PSM.
Testing circuit
32-P TIMER
V
A
R 7 3 N N
I O C
A 8 4
C 9 10
K A
I
T
PICK UP CHECK.
Pick up at:
Drop out at :
Procedure:
1) Make the connection as per the circuit except timer connection.
2) Apply 110 V to the voltage terminals 7 & 8 of the relay
3) Go on increasing the current through (Variable Rehostst) to the terminals 9&10 until the relay pick up.
notedown the current injected.
4)Go on decrease the current to the current to the terminals until the relay drop out ,then note down the current.
TIMING CHECKS:
1) Make the connections as per the circuit diagram.
2)Set the pick up current,set the time in relay and voltage(110 V )to be applied to the relay.
3)Switch on the kit, and note down the time operate.
4)next,do the same procedure for another two time settings.
NOTES:
1)Ensure kit inbuilt timer is zero position before timing checks.
TESTING CIRCUIT:
40-V
7
P
VARIAC
N 8
PICK UP CHECKS:
Pick up at:
Drop out at :
Procedure:
1) Make the connection as per the circuit connection.
2) Go on increasing the voltage to the terminals 7&8 until the relay pick up,then note down the voltage injected.
3) Go on decreasing the voltage until the relay drop out,then note down the voltage injected.
TESTING CIRCUIT
KIT 46 TIMER
A 7&8
UI 3 N N
11&12 4 C O
U2
Tm1
Tm2
PICK UP CHECKS:
Relay Pick up at :
PROCEDURE
1)'Make the connection as for the circuit diagram shown and connect the two coils in series (Except timmer)
2) Go on increasing the current to the terminals 7&8 and 11&12 until the relay pick up,then note down the current inj
TIMING CHECKS
CKT DIAGRAM:
51-V TIMER
K A
I 9 3 N
T 4 C
10 7 8 N0
VARIAC
PICK UP CHECKS:
Drop off at :
PROCEDURE
PROCEDURE
PICK UP CHECK
AT 110 VOLT
1) Make the connection as per the circuit diagram shown.(Except timmer connection)
2) Apply 110 Volt to the votage terminal 7&8 of the relay by variac
3)Go on incressing the current to the terminal 9&10 until the disc starts to move
4) After disc stops from intial movement slightly increse the current disc start to
rotate and closes the contact.
PICK UP CHECK
AT 0 VOLT
1) Make the connection as per the circuit diagram shown.(Except timmer connection)
2)Go on incressing the current to the terminal 9&10 until the disc starts to move
3) After disc stops from intial movement slightly increse the current disc start to
rotate and closes the contact.
TIMING CHECKS
PROCEDURE
TESTING CIRCUIT:
59
9
P
VARIAC
N 10
PICK UP CHECKS:
% V(inst) % V(t) Actual (inst) voltage t (sec) voltage optd optd time
Procedure:
1) Make the connection as per the circuit connection.
2) First set the 115V in Instatenious coil Go on increasing the voltage to the terminals 9&10 until the relay pick up,the
3) This voltage tripping shall be operated through timer.
4) Then go on increasing the voltage until the relay pick up & 86G tripping instantaneously ,then note down the volt
injected.
TIMING CHECKS:
Procedure:
1)For timing checks,first set the 110% of PSM (t) in the variac.
2)Simultaneously Put on the variac and put on the timer(in mobile) .
3)When relay contact closes, stopped timer then note down the relay operated time.
4)Check & ensure the with in limits of relay optd time with expected time.
5)Next,do the same procedure for 2 ,3 & 4 secs.
NOTES:
1)Field filure , reverse power and over votage relays should be kept out for unnecessary relay operating.
2)For pickup checks :
+5 % acceptable tolerance for relay pick up.
+30% accptable tolerance for disc complete rotation.
7) DIFFRENTIAL RELAY(87-G):
TESTING CIRCUIT:
CTTB-2
R 1
Y 2 87-G
B 3 R-PHASE
N 4
R 5 Y-PHASE
KIT
Y 6
B 7 B-PHASE
N 8
PICK UP CHECKS:
Drop off at :
PROCEDURE
1)'Make the connection as per the circuit diagram .
2) Go on increasing the current to the terminals CTTB-1 & 5 until the relay R-Ph element pick up,then note down the
injected.
3) Go on decreasing the current until the relay drop out,then note down the current injected.
4)Check & ensure the with in limits of relay optd cuurent with setting current.
5)Next,do the same procedure for Y & B Phases.
40-G M=multimeter
A 5 3
KIT 6 'M
9 4
10
7 8
VARIAC
V
Pick up check
1) Make the connection as shown above.
2) Connect the multimeter to 3&4 terminal
3)Short the terminal 6&9
4)Apply 110 V to the terminal 7&8 of the relay.
5) Inject the current '0.4A to the terminal 5&10 of the relay.
6)Reduce the voltage to 7&8 from variac till terminal 3&4 become NC.Then note down voltage
Drop off check
1) Now set the current 0.8A to terminal 5 & 10,further go on redusing voltage to terminal 7&8 until terminal 3&4 bec
NO from NC, note down the voltage.
2) Calculate the relay pick and drop off voltage by using formula as mentioned below.
Pickup check:-
Vs = 2I (K1*K5 +K3+K5)
Drop off check:-
Vs = 2I (K3+K4)
SYNCHRONIZING PANEL
TESTING CIRCUIT:
64-B
9
P
VARIAC
N 10
PICK UP CHECKS:
Relay pickup at =
Disk complete rotation at =
Procedure:
1) Make the connection as per the circuit connection.
2) Go on increasing the voltage to the terminals 9&10 until the relay pick up,then note down the voltage injected.
3)When the disk rotation stops ,slightly increase the voltage until the contact closed,then notedown the same voltag
TIMING CHECKS:
Procedure:
1)For timing checks,first set the 2 times of PSM in the variac.
2)Simultaneously Put on the variac and put on the timer (stop watch) .
3)When relay disk rotation completes, stop the timer then note down the relay operated time.
4)Check & ensure the with in limits of relay optd time with expected time.
5)Repeat the same procedure for 3 times of PSM.
TESTING CIRCUIT:
2NO+2NC CONT
27-S
NO 3- VARIAC
9
NC P
10 NC N
NO
N
P
1- VARIAC
1-,240 v
PICK UP CHECKS:
Procedure:
1) Make the connection as per the circuit diagram.
2) Go on increasing the voltage to the terminals 9&10 until the relay disc pickup,then note down the voltage injected.
3)When the disk rotation stops ,slightly increase the voltage until the contact closed,then notedown the same voltag
TIMING CHECKS:
Procedure:
1)For timing checks,first set the 75% PSM in the 1- variac.
2)Apllied the 110 volts to relay through 3- variac.
3)Simultaneously Put off the auxilary supply of contactor and put on the timer (Stop Watch) .
4)When relay disk rotation completes, stopped timer then note down the relay operated time.
5)Check & ensure the with in limits of relay optd time with expected time.
6)Next,do the same procedure for 50 % of PSM.
25
5
0-250V
VARIAC 'V
7
8 10
'V
PICK UP CHECKS:
Pick up at:
Drop out at :
Procedure:
e injected.
B Phase
at O V
elay operated time.
ay operating.
ck up,then note down the current