POM-QM For Windows 3

This document provides the results of a project management analysis using the PERT/CPM triple time estimate method. It includes a precedence list and network diagram of 30 tasks labeled A through AP. It also includes expected durations, start and finish dates, slack times, and standard deviations for each task. The total project completion time is estimated at 266.683 days with a standard deviation of 5.53 days.

Uploaded by

Mokhammad Dimas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
210 views3 pages

POM-QM For Windows 3

This document provides the results of a project management analysis using the PERT/CPM triple time estimate method. It includes a precedence list and network diagram of 30 tasks labeled A through AP. It also includes expected durations, start and finish dates, slack times, and standard deviations for each task. The total project completion time is estimated at 266.683 days with a standard deviation of 5.53 days.

Uploaded by

Mokhammad Dimas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Dimas Industrial Engineering

01-31-2017 12:11:00

Module/submodule: Project Management (PERT/CPM)/Triple time estimate


Problem title: (untitled)
Method: Triple time estimate
Network type: Precedence list

Results ----------

Task Precedences
A
B A
C B
D B
E B
F E
G B
H C
I D
J A
K J
L K
M K
N K
O L
P N
Q N
R O
S P
T R
U S
V U
W T
X W
Y V
Z Y
AA X
AB Z
AC AA
AD AC, AB
AE AD
AF AD
AG A
AH A
AI AG, AH
AJ A
AK AJ
AL AI, AM
AM K, AK
AN AL
AO AL
AP AM

Project completion time = 266.683


Project standard deviation = 5.53

Activity Early Early Late Standard


time Start Finish Late Start Finish Slack Deviation
------------------------------------------------------------------------------------------
A 3.06 0 3.06 0 3.06 0 .16
B 37.54 3.06 40.6 201.85 239.38 198.79 2.04
C 6.07 40.6 46.67 239.38 245.46 198.79 .34
D 8.39 40.6 48.99 246.17 254.55 205.57 .46
E 14.48 40.6 55.08 244.33 258.82 203.73 .78
F 7.87 55.08 62.95 258.82 266.68 203.73 .43
G 2.72 40.6 43.32 263.96 266.68 223.36 .16
H 21.23 46.67 67.9 245.46 266.68 198.79 1.16
I 12.13 48.99 61.11 254.55 266.68 205.57 .66
J 17.38 3.06 20.44 3.06 20.44 0 .95
K 27.53 20.44 47.97 20.44 47.97 0 1.49
L 3.73 47.97 51.7 90.9 94.63 42.93 .2
M 9.41 47.97 57.38 257.27 266.68 209.3 .51
N 8.5 47.97 56.47 47.97 56.47 0 .47
O 3.35 51.7 55.05 94.63 97.98 42.93 .18
P 31.45 56.47 87.92 56.47 87.92 0 1.72
Q 20.42 56.47 76.89 246.27 266.68 189.79 1.12
R 5.04 55.05 60.09 97.98 103.02 42.93 .27
S 4.35 87.92 92.27 87.92 92.27 0 .25
T 7.58 60.09 67.67 103.02 110.61 42.93 .42
U 4.56 92.27 96.82 92.27 96.82 0 .26
V 35.91 96.82 132.74 96.82 132.74 0 1.95
W 33.8 67.67 101.47 110.61 144.4 42.93 1.83
X 9.31 101.47 110.79 144.4 153.72 42.93 .51
Y 8.21 132.74 140.95 132.74 140.95 0 .44
Z 18.61 140.95 159.56 140.95 159.56 0 1
AA 16.88 110.79 127.67 153.72 170.6 42.93 .91
AB 28.23 159.56 187.79 159.56 187.79 0 1.53
AC 17.19 127.67 144.86 170.6 187.79 42.93 .93
AD 3.94 187.79 191.73 187.79 191.73 0 .21
AE 74.95 191.73 266.68 191.73 266.68 0 4.09
AF 61.59 191.73 253.32 205.1 266.68 13.37 3.35
AG 21.75 3.06 24.81 189.68 211.43 186.62 1.19
AH 18.93 3.06 21.99 192.5 211.43 189.44 1.03
AI 20.84 24.81 45.65 211.43 232.27 186.62 1.14
AJ 26.41 3.06 29.47 169.75 196.17 166.7 1.45
AK 18.72 29.47 48.19 196.17 214.89 166.7 1.02
AL 22.17 65.58 87.75 232.27 254.44 166.7 1.21
AM 17.38 48.19 65.58 214.89 232.27 166.7 .95
AN 12.24 87.75 99.99 254.44 266.68 166.7 .67
AO 8.08 87.75 95.83 258.6 266.68 170.85 .45
AP 19.93 65.58 85.5 246.76 266.68 181.18 1.09

Task time computations ----------

Optimistic MostPessimistic Activity Standard


Activity timeLikely time time time deviation Variance
-------------------------------------------------------------------------------
A 2.63 3.04 3.57 3.06 .16 .02
B 32.3 37.1 44.53 37.54 2.04 4.15
C 5.2 6 7.23 6.07 .34 .11
D 7.2 8.3 9.93 8.39 .46 .21
E 12.5 14.3 17.21 14.48 .78 .62
F 6.7 7.8 9.3 7.87 .43 .19
G 2.3 2.7 3.23 2.72 .16 .02
H 18.2 21 25.16 21.23 1.16 1.35
I 10.4 12 14.37 12.13 .66 .44
J 14.9 17.2 20.6 17.38 .95 .9
K 23.7 27.2 32.66 27.53 1.49 2.23
L 3.2 3.7 4.4 3.73 .2 .04
M 8.1 9.3 11.18 9.41 .51 .26
N 7.3 8.4 10.13 8.5 .47 .22
O 2.9 3.3 3.99 3.35 .18 .03
P 27 31.1 37.3 31.45 1.72 2.95
Q 17.5 20.2 24.2 20.42 1.12 1.25
R 4.3 5 5.95 5.04 .27 .08
S 3.7 4.3 5.17 4.35 .25 .06
T 6.5 7.5 9 7.58 .42 .17
U 3.9 4.5 5.43 4.56 .26 .07
V 30.9 35.5 42.58 35.91 1.95 3.79
W 29.1 33.4 40.1 33.8 1.83 3.36
X 8 9.2 11.06 9.31 .51 .26
Y 7.1 8.1 9.77 8.21 .44 .2
Z 16 18.4 22.06 18.61 1 1.02
AA 14.5 16.7 19.99 16.88 .91 .84
AB 24.3 27.9 33.5 28.23 1.53 2.35
AC 14.8 17 20.37 17.19 .93 .86
AD 3.4 3.9 4.63 3.94 .21 .04
AE 64.4 74.1 88.92 74.95 4.09 16.7
AF 52.9 60.9 73.02 61.59 3.35 11.25
AG 18.7 21.5 25.82 21.75 1.19 1.41
AH 16.3 18.7 22.48 18.93 1.03 1.06
AI 17.9 20.6 24.74 20.84 1.14 1.3
AJ 22.7 26.1 31.37 26.41 1.45 2.09
AK 16.1 18.5 22.24 18.72 1.02 1.05
AL 19.1 21.9 26.34 22.17 1.21 1.46
AM 14.9 17.2 20.6 17.38 .95 .9
AN 10.5 12.1 14.53 12.24 .67 .45
AO 6.9 8 9.59 8.08 .45 .2
AP 17.1 19.7 23.67 19.93 1.09 1.2
Project resu
Total of cri 30.55
Square root 5.53

(untitled)
Precedence Graph

37.54 6.07 7.87 3.35 5.04 7.58 35.91 9.31 18.61 28.23 74.95

B C F O R T V X Z AB AE

8.39 21.23

17.38 D H 31.45

J 14.48 12.13 P 4.35

E I S

21.75 2.72 3.73 20.42 3.94

AG G L Q AD

27.53 9.41 12.24

18.93 K M 19.93 AN

AH 20.84 8.5 AP

AI N

3.06 26.41 18.72 17.38 22.17 8.08 4.56 33.8 8.21 16.88 17.19 61.59

A AJ AK AM AL AO U W Y AA AC AF