0% found this document useful (0 votes)
93 views3 pages

Assignment 2

The document contains 4 problems related to operations management. Problem 1 calculates utilization and efficiency for different production scenarios. Problem 2 calculates break-even point, output and profit for given costs and revenues. Problem 3 similarly calculates break-even point and output for two machines with different costs. Problem 4 determines the optimal machine to purchase by calculating the total costs for different machines given production requirements and operating costs.

Uploaded by

mahmoud
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
93 views3 pages

Assignment 2

The document contains 4 problems related to operations management. Problem 1 calculates utilization and efficiency for different production scenarios. Problem 2 calculates break-even point, output and profit for given costs and revenues. Problem 3 similarly calculates break-even point and output for two machines with different costs. Problem 4 determines the optimal machine to purchase by calculating the total costs for different machines given production requirements and operating costs.

Uploaded by

mahmoud
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Mohamed Elsayed Samak

Operation management
assignment 2

Problem # 1

Need Utilization & Efficiency to the following cases:

a- Processes avarage = 7 loans / day & design capacity = 10 loans / day & effective capacity = 8 loans / day

Uitilization = actual o/p / design capacity * 100% = 7/10 * 100 = 70%

Efficiency = actual o/p / effective capacity * 100% = 7/8 * 100 = 87.5%

b- Services an avarage of 4 furnaces / day & design capacity = 6 furnaces / day & effective capacity = 5 furnaces / day

Uitilization = actual o/p / design capacity * 100% = 4/6 * 100 = 66.67%

Efficiency = actual o/p / effective capacity * 100% = 4/5 * 100 = 80%

c- Regarding the systems that have higher efficiency ratios than other systems will always have higher uitilization ratios than

those other systems , from pervious exampls we can see when the systems have higher efficiency it have higher uitilization

Problem # 2

FC = 9200 $ & VC = v = 0.7 $ / unit produced & R = 0.9 $ / unit

a- Q bep= FC / ( R - VC ) = 9200 $ / ( 0.9 $ - 0.7 $ ) = 9200 / 0.2 = 46000 unit so Q bep = 46000 unit

b- For Q = 61000 unit so P = Q (R-v) - FC = 61000 ( 0.9 - 0.7 ) - 9200 = 3000 $ or P = 3000 $ when Q = 61000 unit .
P = 8200 $ when Q = 87000 unit .
c- For P = 16000 $/month Q=? So Q = ( P + FC )/( R - v ) = ( 16000 + 9200 )/( 0.9 - 0.7 ) = 126000 $ or Q = 126000 unit when P = 16000$

d- For TR = 23000 $/month Q=? Since TR = R * Q so Q = TR/R = 23000/0.9 = 25555.56 or Q = 25556 unit when TR=23000$/month

Problem # 3

Annual FC = 40000 $ for A & Annual FC = 30000 $ for B


v = 10 $ for A & v = 11 $ for B
R = 15 $

a- Q bep for A = FC / ( R - v ) = 40000/(15-10)= 8000 unit & Q bep for B = FC / ( R - v) = 30000/(15-11)=7500 unit

b- For the same profit Q=? So since P=Q(R-v)-FC so Q(15-10)-40000=Q(15-11)-30000 or 5Q = 4Q + 10000 , finally .Q=10000 units at Pa=Pb

c- If annual demand Q = 12000 unit P=?


since P=Q(R-v) - FC so P for A = 12000(15-10)-40000=60000-40000=20000 $.
P for B = 12000(15-11)-30000=48000-30000=18000 $ .

Problem # 4

given Machine cost/machine Annual Processing time per unit (Min.)


Product
A 40000$ Demand A B C
B 30000$ 1 16000 3 4 2
C 80000$ 2 12000 4 4 3
3 6000 5 6 4
4 30000 2 2 1

a- If purchasing costs are considered, which m/c would have the lowest TC? & how many of that m/c would be needed ?
Machines operats 10h/day and 250D/year..
Annual Processing time per unit (Min.) Total Processing Time
Product
Sure Machine B should be the lowest TC & 2 of it Demand A B C A B C
will be needed considering giving data and total 1 16000 3 4 2 48000 64000 32000
processing time available/piece of machine equal 2 12000 4 4 3 48000 48000 36000
10h/day * 250 day/year = 2500 h/year 3 6000 5 6 4 30000 36000 24000
4 30000 2 2 1 60000 60000 30000
b- If A m/cs its OC=10$/h & B m/cs its OC=11$/h & Total in Min 186000 208000 122000
C m/cs its OC=8$/h which M/C would be selected ? Total in hous / year 3100 3466.67 2033.33

Since Total OC of Demand to 4 products of M/C A = 3100 * 10 = 31000$ & Total OC of Dmand to same 4 products of M/C B = 3467 * 11 =38137$
& Total OC of Demand to the same 4 products of M/C C = 2033 * 8 = 16264$ & since TC=FC+VC or TC=FC+OC in our case & consider FC
is the cost / machine so TC for A =71000$ & for B =68137$ & for C =96264$ so M/C B would be selected to mnimize Total cost .