Checklist For Pre Concreting

This checklist provides instructions for concreting a structure. It includes 12 items to check before pouring concrete, such as ensuring proper surface preparation, formwork, openings, provision of vibrators, condition of mixing/vibrating equipment, access platforms, reinforcement as per drawings, embedded parts, concrete cover, plumbness, levels, and pour schedule. The quality assurance engineer signs off after inspection and any remarks are noted.

Uploaded by

Ifeanyi Iwualla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
1K views4 pages

Checklist For Pre Concreting

This checklist provides instructions for concreting a structure. It includes 12 items to check before pouring concrete, such as ensuring proper surface preparation, formwork, openings, provision of vibrators, condition of mixing/vibrating equipment, access platforms, reinforcement as per drawings, embedded parts, concrete cover, plumbness, levels, and pour schedule. The quality assurance engineer signs off after inspection and any remarks are noted.

Uploaded by

Ifeanyi Iwualla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Checklist for Concreting

Project : Doc. No.


Client : contractor

SITE: LOCATION:

Structure: Max Aggre Size:

Cement Test Cert No: Steel Test Cert No:

PRE CONCRETING
1 Check surface preparation

2 Check for Form work and stagging

3 Conduits/ Ducts opening/ Insert Plates provided?

4 Check for provision of vibrators?

5 Working condition of mixer/ vibrators checked and gaps between plates


in mixer drum to be checked?

6 Access platform and walkways (if required) provided?

7 Check reinforcement as per drawings

8 Check Embedded parts

9 Check cover to Reinforcement

10 Check Plumb

11 Check Reduced levels

12 Check for Concrete (Pour card)

Remarks of Quality Assurance Engineer:


Signature Date
Checked By:
Approved By:
: QA/CL-CON/
ontractor :

DATE:

Slump:

YES NO NA

een plates
Remarks/ Comments