T T S /G A: A (RC Frame) A (Brick Infill) A H
T T S /G A: A (RC Frame) A (Brick Infill) A H
36 Floor hi Wi
Importance factor = 1 1 4.5 3837.61
R = 5 2 7.5 3358.69
Height = 16.6 m 3 10.5 3358.69
T a (RC frame) = 0.6168 sec 4 13.5 3358.69
T a (brick infill) = 5 16.5 2400.84
S a /g = 2.2049
Ah = 0.0794
Concrete Density = 25 First floor
Column breadth 450 mm Beam 675 kN
Column depth = 450 mm Column 474.609 kN
Beam breadth = 300 mm Slab 1536 kN
Beam depth 450 mm 2nd, 3rd, 4rth floor
Slab thick for floor = 120 mm Beam 675 kN
Slab thick for roof = 120 mm Column 379.688 kN
Storey height = 3 m Slab 1536 kN
Foundation depth = 1.5 m
No. of Bay along X = 4
No. of Bay along Y = 4
c/c b/w col along X = 6 m
c/c b/w col along y = 4 m
Total beam length = 200 m
FF = 1 kN/m2
LL = 4 kN/m2
FF = 384 kN
LL = 768 kN
W1 = 3837.6 kN
W2 = 3358.7 kN
W3 = 3358.7 kN
W4 = 3358.7 kN
W5 = 2400.8 kN
Total W = 16315 kN
Base Shear = 16315 kN
Wihi2 Qi
77711.6 666.339
188926 1619.95
370295 3175.1
612121 5248.64
653630 5604.56
1902684
Roof Floor Ht
Beam 675 kN first floor 3.75 m
Column 189.844 kN roof 1.5 m
Slab 1152 kN