Monitoring and Expansion Threshold For Wireless Network Resource ZTE
Monitoring and Expansion Threshold For Wireless Network Resource ZTE
Monitoring and Expansion Threshold For Wireless Network Resource ZTE
Resource
Ne Type Index KPI&Counter
Type
Downlink
Average utilization of non-HSDPA code
code C372490218 ( from Node B V4.12.10.23P21)
resources
resource
verage
throughput Average throughput of HSDPA subscriber &
(C310545121/(C310545123*Gr))&PI300844
of HSDPA The best Cell Average HSDPA Users
subscriber
KPI 300795
(OMCR parameter GResPara48 should be set
CellGroup Average CE Utilization,UL with new value: GResPara48new = GResPara48old
Or 0x10)
CE resource
utilization CellGroup Average CE Utilization,DL KPI 300797
Maximum Utilization Ratio of Uplink Cell
C310840004
Group CENode B
Maximum Utilization Ratio of Downlink Cell
C310840008
Group CENode B
C370020008
Ethernet port
(from Node B V4.12)
C370020009
Ethernet port
(from Node B V4.12)
Iub
Transport Iub uplink signaling link utilization (ATM- C311490000*53*8/1000/Gr/Uplink signaling link
Resource E1/ATM-STM) configuration bandwidth
(ATM-
E1ATM-
STM)
<> 11 , 1
ZTE Iub
Transport
Resource
(ATM-
E1ATM- Iub downlink signaling link utilization (ATM- C311490001*53*8/1000/Gr/Downlink signaling
STM) E1/ATM-STM) link configuration bandwidth
Iub
Transport
Iub Uplink and Downlink Signaling Link
ResourceI Refer to Association
Utilization (IP-E1IP-FE)
P-E1IP-
FE
Iub Uplink
and
Downlink
Bandwidth Iub uplink bandwidth utilization on ATM Sum(C311490000for PVC of
Utilization on media plane(ATM-E1ATM-STM) TrPath)*53*8/1000/Gr/ C311110001
the ATM
Media
PlaneATM Iub downlink bandwidth utilization on ATM Sum(C311490001for PVC of
-E1ATM- media plane(ATM-E1ATM-STM) TrPath)*53*8/1000/Gr/ C311110000
Iub Uplink
STM (C311880029+C311880030+C311880031+C311
and Iub uplink bandwidth utilization on IP media
880036+C311880037+C311880038)*8/Gr/
Downlink plane C311110016
Bandwidth
Utilization on Iub downlink bandwidth utilization on IP (C311880025+C311880026+C311880027+C311
the IP Media media plane 880028+C311880032+C311880033+C31188003
Plane 4+C311880035)*8/Gr/ C311110015
CID
Resource
Utilization Average CID resource utilization (ATM-
C312230011/248
ATM- E1ATM-STM)
E1ATM-
STM
Iub/Iur/Iu Maximum CID resource utilization(ATM-
C312230012/248
E1ATM-STM)
Iur/IuUplink
and
Downlink
Refer to Broadband SS7 Signaling Link
Signaling
Resource
Link
Utilization
ATM
Iur Uplink
and
Downlink
Signaling Refer to Association Resource Refer to Association
Link
Utilization
(IP)
Iur Uplink
and Iur uplink bandwidth utilization on media
C310730273*8/Gr/C310730007
Downlink plane
Bandwidth
Utilization on Iur downlink bandwidth utilization on media C310730274*8/Gr/C310730008
Media Plane plane
Iu Uplink
and Iu uplink bandwidth utilization on media
(C310790001+C310790007)*8/Gr/C310790009
Downlink plane
Bandwidth
RNC(V3) Utilization on Iu downlink bandwidth utilization on media (C310790002+C310790008)*8/Gr/C310790010
plane
Capacity Media
UplinkPlane
and
Expansion Downlink Uplink broadband SS7signaling link
Broadband utilization C311010045/10000
SS7
Signaling Downlink broadband SS7 signaling link
Link C311010044/10000
utilization
Utilization
Association Traffic sent on an association C311100009
Resource
Monitoring
<> 11 , 2
Expansion
ZTE
Association
Resource
Monitoring Traffic received on an association C311100010
<> 11 , 3
ZTE
Iub Uplink
and
Downlink
Bandwidth Iub uplink bandwidth utilization on ATM Sum(C380220003for PVC of
Utilization on media plane(ATM-E1ATM-STM) TrPath)*53*8/1000/Gr/ C380000002
the ATM
Media
PlaneATM Iub downlink bandwidth utilization on ATM Sum(C380220004for PVC of
-E1ATM- media plane(ATM-E1ATM-STM) TrPath)*53*8/1000/Gr/ C380000001
Iub Uplink
STM (C311880029+C311880030+C311880031+C311
and Iub uplink bandwidth utilization on IP media
880036+C311880037+C311880038)*8/Gr/
Downlink plane C380000017
Bandwidth
Utilization on Iub downlink bandwidth utilization on IP (C311880025+C311880026+C311880027+C311
the IP Media media plane 880028+C311880032+C311880033+C31188003
Plane 4+C311880035)*8/Gr/ C380000016
CID
Resource
Utilization Average CID resource utilization (ATM-
C380030011/248
ATM- E1ATM-STM)
E1ATM-
STM
Iub/Iur/Iu Maximum CID resource utilization(ATM-
C380030012/248
E1ATM-STM)
Iur/IuUplink
and
Downlink
Refer to Broadband SS7 Signaling Link
Signaling
Resource
Link
Utilization
ATM
Iur Uplink
and
Downlink
Signaling Refer to Association Resource Refer to Association
Link
Utilization
(IP)
Iur Uplink
and Iur uplink bandwidth utilization on media
C310730273*8/Gr/C310730007
Downlink plane
Bandwidth
Utilization on Iur downlink bandwidth utilization on media C310730274*8/Gr/C310730008
Media Plane plane
Iu Uplink
and Iu uplink bandwidth utilization on media
(C310790001+C310790007)*8/Gr/C310790009
Downlink plane
Bandwidth
Utilization on Iu downlink bandwidth utilization on media (C310790002+C310790008)*8/Gr/C310790010
RNC(V4) Media plane
UplinkPlane
and
Capacity Downlink
Expansion Broadband Uplink broadband SS7signaling link
C380120019/10000
utilization
SS7
Signaling Downlink broadband SS7 signaling link
Link C380120020/10000
utilization
Utilization
Association Traffic sent on an association C380170009
Resource
Monitoring Traffic received on an association C380170010
<> 11 , 4
ZTE
DUc CPU
Usage
Peak ratio of the CPU usage C380710006
Total
Number of
Paging Total Number of Paging message received
C310680207
message from CN
received
from CN
Rx traffic utilization of
Traffic Sum(C380220003*53*8/1000000/Gr)/300
EAPB/ESDTA/EAPB1b/ESDTA1b boards
Monitoring
Tx traffic utilization of
of ATM Sum(C380220004*53*8/1000000/Gr)/300
EAPB/ESDTA/EAPB1b/ESDTA2b boards
Interface No limit is set on the traffic of an EDTA/EDTA1b
Boards board because the traffic is limited by the
EDTA/EDTA1b number of ports available on the board. It is
unnecessary to monitor the traffic of an
EDTAEDTA1b board.
sum(C380260001*4294967296+C380260002,for
board)*8/
EGPB/EXGB1b/EXGB2a/EXGB1a/EXGB2c
(Gr*1000000)/MAX_IP_THROU_V4(EGPB:3000
Rx traffic utilization
Mbps, EXGB1B:3000, EGPB2A:6000,
EXGB1A:15000, EGPB2C:3000)
IP Interface EGPB/EXGB1b/EXGB2a/EXGB1a/EXGB2c
sum(C380260003*4294967296+C380260004,for
Board Tx traffic utilization
board) * 8/(Gr*1000000)/MAX_IP_THROU_V4
sum(C380460001+C380460004+C380460007+
EGPB/EXGB1b/EXGB2a/EXGB1a/EXGB2c C380460010)/Gr/(1000*MAX_IP_PPS_V4)
PPS utilization (EGPB:1000K,EXGB1b/EXGB2a/EXGB1a/EXG
B2c:2500K)
sum(C380250002,for port)*8 / (Gr *
EDTI/ESDTI/EDTI2a/ESDTI2a Rx 1000000)/MAX_IPOE_THROU_V4(MAX_IPOE_
bandwidth utilization THROU_V4:EDTI:55Mbps, ESDTI:440Mbps,
EDTI2a:55Mbps, ESDTI2a:880Mbps)
IPoE
Interface
Board EDTI/ESDTI/EDTI2a/ESDTI2a Tx sum(C380250004,for port)*8 / (Gr *
Utilization bandwidth utilization 1000000)/MAX_IPOE_THROU_V4
sum(C380250001+C380250003)8 / (Gr *
ESDTI/ESDTI2a PPS utilization 1000)/MAX_IPOE_PPS_V4(MAX_IPOE_PPS_V
4: ESDTI:1100K,ESDTI2a:1600K,)
DUm C380710009 Mean ratio of Dum CPU usage
Resource
Utilization C380710010 Max ratio of Dum CPU usage
<> 11 , 5
ZTE
Expansion
Alarm Threshold Expansion Threshold Optimization Method
Method
Optimizes the R99 power control
parameters.
(KPI300840- (KPI300840- Adjusts the HSUPA E-TTI Switching.
Multi-carrier/Add
KPI300843>=4dB)& KPI300843>=6dB)& Adjusts the MAXRTWP of the cell.
site
(C310030463>=16) (C310030463>=16) Uses the functions of self-adaptive power
control and no power transmission for null
packets.
Expand
50% 60%
transmission
Expand
50% 60%
transmission
Expand
80% 90%
transmission
Expand
80% 90%
transmission
Expand
50% 60%
transmission
Expand
50% 60%
transmission
Expand
80% 90%
transmission
Expand
80% 90%
transmission
Replace CC
75% 80% board to CC16
board
Replace CC
85% 90% board to CC16
board
Expand
50% 60%
transmission
<> 11 , 6
ZTE
Expand
50% 60%
transmission
Expand
transmission
Expand
50% 60%
transmission
Expand
50% 60%
transmission
Expand
50% 60%
transmission
Expand
50% 60%
transmission
Expand
70% 80%
transmission
Expand
80% 90%
transmission
Expand
transmission
Expand
transmission
Expand
50% 70%
transmission
Expand
50% 70%
transmission
Expand
50% 70%
transmission
Expand
50% 70%
transmission
Expand
20% 40%
transmission
Expand
20% 40%
transmission
Expand
200k 400k
transmission
<> 11 , 7
ZTE
Expand
150k 300k
transmission
Adjust Cell location to achieve load
60% 70% Add CMP
balancing
Adjust Cell location to achieve load
70% 80% Add CMP
balancing
60% 70% Add DMP
Expand
70% 80%
transmission
Expand
70% 80%
transmission
Expand
70% 80%
transmission
Expand
70% 80%
transmission
Expand
70% 80%
transmission
Expand
70% 80%
transmission
Expand
70% 80%
transmission
Expand
70% 80%
transmission
Expand
70% 80%
transmission
Expand
70% 80%
transmission
Expand
70% 80%
transmission
Expand
70% 80%
transmission
Expand
70% 80%
transmission
80% 90% Add RUP Board
Expand
70% 80%
transmission
Expand
70% 80%
transmission
Expand
transmission
<> 11 , 8
ZTE
Expand
50% 60%
transmission
Expand
50% 60%
transmission
Expand
50% 60%
transmission
Expand
50% 60%
transmission
Expand
70% 80%
transmission
Expand
80% 90%
transmission
Expand
transmission
Expand
transmission
Expand
50% 70%
transmission
Expand
50% 70%
transmission
Expand
50% 70%
transmission
Expand
50% 70%
transmission
Expand
20% 40%
transmission
Expand
20% 40%
transmission
Expand
1.5M 2M
transmission
Expand
1.2M 1.7M
transmission
Adjust Cell location to achieve load
60% 70% Add Cu
balancing
Adjust Cell location to achieve load
70% 80% Add Cu
balancing
60% 70% Add Duc
<> 11 , 9
ZTE
Expand
60% 80%
transmission
Expand
70% 80%
transmission
Expand
70% 80%
transmission
Expand
70% 80%
transmission
Expand
70% 80%
transmission
Expand
70% 80%
transmission
Expand
70% 80%
transmission
Expand
70% 80%
transmission
<> 11 , 10
ZTE
<> 02/21/2017 11 , 11