This document contains rain records for the months of October, November, and December 2014 from a construction project repairing and improving the KLB Prai area in Penang, Malaysia. It lists the number of work and rain days for each month, with details on start and stop times for any rain during work hours. In October there were 11 work days and 3 rain days, in November 28 work days and 10 rain days, and in December 14 work days and 3 rain days.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
72 views3 pages
Rain Record
This document contains rain records for the months of October, November, and December 2014 from a construction project repairing and improving the KLB Prai area in Penang, Malaysia. It lists the number of work and rain days for each month, with details on start and stop times for any rain during work hours. In October there were 11 work days and 3 rain days, in November 28 work days and 10 rain days, and in December 14 work days and 3 rain days.